X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262709000

Well Details

Well ID: 0254262709000
Loading map...
Location: 00/09-27-025-26W4/0
Location Alias: 00/09-27-25-26 W4M
Location Alias 2: 00/09-27-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 27
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-27-25-26
Operator Name: Ember Resources Inc.
License Number: 0326513
License Date: 2005-02-16
License Status: Issued
Spud Date: 2005-02-23
Final Drill Date: 2005-03-03
Well Total Depth: 975.00 m
Surface Hole Latitude: 51.164042
Surface Hole Longitude: -113.540636

For data sources see[1][2]

Well History

Date Event
2005-02-16 Obtained License
2005-02-23 Surface Casing Operation Performed
2005-03-03 Finished Drilling
2005-03-03 Well Log Performed
2005-03-03 Well Mode changed to Drilled and Cased
2005-03-04 Production Casing Operation Performed
2005-03-04 Rig Released
2005-05-04 Perforation Treatment Performed - Jet Perforation
2005-05-04 Well Log Performed
2005-05-23 Perforation Treatment Performed - Fractured
2005-07-06 Well Began Production
2005-07-06 Well Fluid changed to Coalbed Methane-Coals Only
2005-07-06 Well Mode changed to Flowing
2007-07-20 Well Log Performed
2007-08-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-04 Perforation 920.30 920.80 13
2005-05-04 Perforation 576.60 577.10 13
2005-05-04 Perforation 569.00 569.50 13
2005-05-04 Perforation 557.60 558.10 13
2005-05-04 Perforation 553.10 553.60 13
2005-05-04 Perforation 546.30 546.80 13
2005-05-04 Perforation 532.90 533.40 13
2005-05-04 Perforation 508.40 508.90 13
2005-05-04 Perforation 506.90 507.40 13
2005-05-04 Perforation 502.30 502.80 13
2005-05-04 Perforation 490.90 491.40 13
2005-05-04 Perforation 911.00 911.50 13
2005-05-04 Perforation 486.40 486.90 13
2005-05-04 Perforation 470.80 471.30 13
2005-05-04 Perforation 465.70 466.20 13
2005-05-04 Perforation 463.70 464.20 13
2005-05-04 Perforation 459.80 460.30 13
2005-05-04 Perforation 456.30 456.80 13
2005-05-04 Perforation 449.80 450.30 13
2005-05-04 Perforation 446.10 446.60 13
2005-05-04 Perforation 424.40 424.90 13
2005-05-04 Perforation 385.10 385.60 13
2005-05-04 Perforation 757.50 758.00 13
2005-05-04 Perforation 333.10 333.60 13
2005-05-04 Perforation 326.60 327.10 13
2005-05-04 Perforation 310.70 311.20 13
2005-05-04 Perforation 253.80 254.30 13
2005-05-04 Perforation 209.90 210.40 13
2005-05-04 Perforation 204.50 205.00 13
2005-05-23 Fracture 204.50 920.80 0
2005-05-04 Perforation 755.10 755.60 13
2005-05-04 Perforation 623.40 623.90 13
2005-05-04 Perforation 618.60 619.10 13
2005-05-04 Perforation 600.00 600.50 13
2005-05-04 Perforation 585.10 585.60 13
2005-05-04 Perforation 580.60 581.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3767 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8714 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References