X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262615000

Well Details

Well ID: 0254262615000
Loading map...
Location: 00/15-26-025-26W4/0
Location Alias: 00/15-26-25-26 W4M
Location Alias 2: 00/15-26-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 15-26-25-26
Operator Name: Ember Resources Inc.
License Number: 0286565
License Date: 2003-05-01
License Status: Issued
Spud Date: 2003-07-01
Final Drill Date: 2003-07-02
Well Total Depth: 837.30 m
Surface Hole Latitude: 51.166670
Surface Hole Longitude: -113.533841

For data sources see[1][2]

Well History

Date Event
2003-05-01 Obtained License
2003-06-03 Surface Casing Operation Performed
2003-07-01 Direction Drilling Operation Performed - Deviate
2003-07-02 Finished Drilling
2003-07-02 Production Casing Operation Performed
2003-07-02 Rig Released
2003-07-02 Well Mode changed to Drilled and Cased
2003-07-15 Well Log Performed
2003-08-12 Perforation Treatment Performed - Jet Perforation
2003-08-24 Perforation Treatment Performed - Fractured
2003-12-06 Well Began Production
2003-12-06 Well Fluid changed to Coalbed Methane-Coals Only
2003-12-06 Well Mode changed to Flowing
2007-07-21 Well Log Performed
2007-08-22 Well Log Performed
2007-10-13 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-07-01 58.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-12 Perforation 740.60 741.60 13
2003-08-12 Perforation 638.40 639.40 13
2003-08-12 Perforation 637.10 638.10 13
2003-08-12 Perforation 635.30 636.30 13
2003-08-12 Perforation 627.10 628.10 13
2003-08-12 Perforation 609.20 610.20 13
2003-08-12 Perforation 572.10 573.10 13
2003-08-12 Perforation 569.10 570.10 13
2003-08-12 Perforation 562.10 563.10 13
2003-08-12 Perforation 545.20 546.20 13
2003-08-12 Perforation 536.80 537.80 13
2003-08-12 Perforation 734.10 735.10 13
2003-08-12 Perforation 516.80 517.80 13
2003-08-12 Perforation 512.70 513.70 13
2003-08-12 Perforation 502.20 503.20 13
2003-08-12 Perforation 496.70 497.70 13
2003-08-12 Perforation 491.30 492.30 13
2003-08-12 Perforation 479.80 481.80 13
2003-08-12 Perforation 452.60 453.60 13
2003-08-12 Perforation 401.40 402.40 13
2003-08-12 Perforation 339.60 340.60 13
2003-08-12 Perforation 328.50 329.50 13
2003-08-12 Perforation 732.80 733.80 13
2003-08-12 Perforation 325.40 326.40 13
2003-08-12 Perforation 314.00 315.00 13
2003-08-12 Perforation 287.80 288.80 13
2003-08-12 Perforation 245.80 246.80 13
2003-08-12 Perforation 199.20 200.20 13
2003-08-12 Perforation 192.00 194.00 13
2003-08-24 Fracture 192.00 741.60 0
2003-08-12 Perforation 725.20 726.20 13
2003-08-12 Perforation 679.10 680.10 13
2003-08-12 Perforation 673.50 674.50 13
2003-08-12 Perforation 666.80 668.80 13
2003-08-12 Perforation 655.90 657.90 13
2003-08-12 Perforation 641.10 642.10 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 624 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8141 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 6770 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8548 0.0 0.0 0.0
2017 8647 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References