X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262610000

Well Details

Well ID: 0254262610000
Loading map...
Location: 00/10-26-025-26W4/0
Location Alias: 00/10-26-25-26 W4M
Location Alias 2: 00/10-26-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 10-26-25-26
Operator Name: Ember Resources Inc.
License Number: 0284269
License Date: 2003-03-10
License Status: Issued
Spud Date: 2003-06-02
Final Drill Date: 2003-06-03
Well Total Depth: 1023.00 m
Surface Hole Latitude: 51.161941
Surface Hole Longitude: -113.526476

For data sources see[1][2]

Well History

Date Event
2003-03-10 Obtained License
2003-06-02 Surface Casing Operation Performed
2003-06-03 Finished Drilling
2003-06-03 Production Casing Operation Performed
2003-06-03 Rig Released
2003-06-03 Well Mode changed to Drilled and Cased
2003-06-14 Well Log Performed
2003-06-24 Perforation Treatment Performed - Jet Perforation
2003-06-29 Perforation Treatment Performed - Fractured
2003-12-06 Well Began Production
2003-12-06 Well Fluid changed to Coalbed Methane-Coals Only
2003-12-06 Well Mode changed to Flowing
2007-07-21 Well Log Performed
2007-08-21 Well Log Performed
2007-10-13 Well Log Performed
2010-08-08 Perforation Treatment Performed - Jet Perforation
2010-08-12 Perforation Treatment Performed - Fractured
2010-08-27 Well Fluid changed to Coalbed Methane-Coals and Other
2010-08-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-06-24 Perforation 618.30 619.30 13
2003-06-24 Perforation 542.40 543.40 13
2003-06-24 Perforation 528.60 529.60 13
2003-06-24 Perforation 508.00 509.00 13
2003-06-24 Perforation 503.50 504.50 13
2003-06-24 Perforation 500.10 501.10 13
2003-06-24 Perforation 485.30 486.30 13
2003-06-24 Perforation 479.40 480.40 13
2003-06-24 Perforation 459.20 460.20 13
2003-06-24 Perforation 455.90 456.90 13
2003-06-24 Perforation 454.50 455.50 13
2003-06-24 Perforation 612.30 613.30 13
2003-06-24 Perforation 449.80 450.80 13
2003-06-24 Perforation 446.60 447.60 13
2003-06-24 Perforation 442.70 443.70 13
2003-06-24 Perforation 434.00 435.00 13
2003-06-24 Perforation 375.60 376.60 13
2003-06-24 Perforation 336.50 337.50 13
2003-06-24 Perforation 325.00 326.00 13
2003-06-24 Perforation 317.70 318.70 13
2003-06-24 Perforation 313.70 314.70 13
2003-06-24 Perforation 303.00 304.00 13
2003-06-24 Perforation 607.70 608.70 13
2003-06-24 Perforation 243.50 244.50 13
2003-06-24 Perforation 194.10 195.10 13
2003-06-29 Fracture 194.10 619.30 0
2010-08-08 Perforation 493.00 495.00 13
2010-08-08 Perforation 471.00 474.00 13
2010-08-08 Perforation 361.50 363.50 13
2010-08-08 Perforation 352.50 354.00 13
2010-08-08 Perforation 245.50 247.50 13
2010-08-08 Perforation 217.00 218.50 13
2010-08-08 Perforation 190.00 192.50 13
2003-06-24 Perforation 578.50 579.50 13
2010-08-08 Perforation 182.00 184.00 13
2010-08-12 Fracture 217.00 495.00 0
2003-06-24 Perforation 574.90 575.90 13
2003-06-24 Perforation 570.80 571.80 13
2003-06-24 Perforation 564.20 565.20 13
2003-06-24 Perforation 553.60 554.60 13
2003-06-24 Perforation 549.00 552.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 624 0.0 0.0 0.0
2004 8738 0.0 0.0 0.0
2005 8141 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 7424 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References