X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262313000

Well Details

Well ID: 0254262313000
Loading map...
Location: 00/13-23-025-26W4/0
Location Alias: 00/13-23-25-26 W4M
Location Alias 2: 00/13-23-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 23
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-23-25-26
Operator Name: Ember Resources Inc.
License Number: 0413469
License Date: 2009-10-27
License Status: Issued
Spud Date: 2009-12-03
Final Drill Date: 2009-12-06
Well Total Depth: 1182.00 m
Surface Hole Latitude: 51.150736
Surface Hole Longitude: -113.527367

For data sources see[1][2]

Well History

Date Event
2009-10-27 Obtained License
2009-12-03 Direction Drilling Operation Performed - Deviate
2009-12-04 Surface Casing Operation Performed
2009-12-06 Finished Drilling
2009-12-06 Production Casing Operation Performed
2009-12-06 Rig Released
2009-12-06 Well Mode changed to Drilled and Cased
2009-12-15 Well Log Performed
2010-01-19 Perforation Treatment Performed - Jet Perforation
2010-02-01 Perforation Treatment Performed - Fractured
2010-02-04 Well Fluid changed to Gas
2010-02-04 Well Mode changed to Testing
2010-02-13 Perforation Treatment Performed - Jet Perforation
2010-03-02 Perforation Treatment Performed - Fractured
2010-03-10 Well Structure changed to Commingled
2010-04-11 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-19 Perforation 633.00 641.00 13
2010-02-13 Perforation 603.70 604.70 13
2010-02-13 Perforation 313.60 314.10 13
2010-02-13 Perforation 382.90 383.40 13
2010-02-13 Perforation 256.00 258.00 13
2010-02-13 Perforation 259.00 259.50 13
2010-02-13 Perforation 555.10 555.60 13
2010-02-13 Perforation 563.60 564.10 13
2010-02-13 Perforation 411.20 412.20 13
2010-02-13 Perforation 549.20 549.70 13
2010-02-13 Perforation 249.50 251.50 13
2010-02-01 Fracture 633.00 641.00 0
2010-02-13 Perforation 757.80 758.30 13
2010-02-13 Perforation 720.10 720.60 13
2010-02-13 Perforation 861.50 863.50 13
2010-02-13 Perforation 528.50 530.50 13
2010-02-13 Perforation 490.50 491.50 13
2010-02-13 Perforation 715.80 716.80 13
2010-02-13 Perforation 682.50 683.50 13
2010-02-13 Perforation 686.00 686.50 13
2010-02-13 Perforation 684.40 684.90 13
2010-02-13 Perforation 657.70 658.20 13
2010-02-13 Perforation 571.30 572.30 13
2010-02-13 Perforation 710.70 711.70 13
2010-02-13 Perforation 702.00 702.50 13
2010-03-02 Fracture 256.00 758.30 0
2010-03-02 Fracture 490.50 491.50 0
2010-03-02 Fracture 528.50 530.50 0
2010-03-02 Fracture 861.50 863.50 0
2010-02-13 Perforation 577.50 578.00 13
2010-02-13 Perforation 564.80 565.80 13
2010-02-13 Perforation 569.80 570.30 13
2010-02-13 Perforation 623.70 624.70 13
2010-02-13 Perforation 626.50 628.50 13
2010-02-13 Perforation 596.40 596.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 28 0.0 0.0 0.0

For data sources see[6]

References