If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254262312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.148026,"lon":-113.538914,"icon":""}]} |
Location: 00/12-23-025-26W4/0 | |
Location Alias: 00/12-23-25-26 W4M | |
Location Alias 2: 00/12-23-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-23-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0285068 | |
License Date: 2003-03-26 | |
License Status: Issued | |
Spud Date: 2003-06-04 | |
Final Drill Date: 2003-06-05 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.148026 | |
Surface Hole Longitude: -113.538914 |
Date | Event |
---|---|
2003-03-26 | Obtained License |
2003-06-04 | Surface Casing Operation Performed |
2003-06-05 | Finished Drilling |
2003-06-05 | Production Casing Operation Performed |
2003-06-05 | Rig Released |
2003-06-05 | Well Mode changed to Drilled and Cased |
2003-06-14 | Well Log Performed |
2003-06-26 | Perforation Treatment Performed - Jet Perforation |
2003-07-16 | Perforation Treatment Performed - Fractured |
2003-11-11 | Well Began Production |
2003-11-11 | Well Fluid changed to Gas |
2003-11-11 | Well Mode changed to Flowing |
2004-07-07 | Perforation Treatment Performed - Jet Perforation |
2004-08-13 | Perforation Treatment Performed - Fractured |
2005-08-05 | Perforation Treatment Performed - Jet Perforation |
2005-08-06 | Perforation Treatment Performed - Fractured |
2005-08-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-08-18 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-06-26 | Perforation | 701.50 | 704.50 | 13 |
2005-08-05 | Perforation | 584.00 | 584.50 | 13 |
2005-08-05 | Perforation | 576.50 | 577.00 | 13 |
2005-08-05 | Perforation | 563.60 | 564.10 | 13 |
2005-08-05 | Perforation | 561.90 | 562.40 | 13 |
2005-08-05 | Perforation | 554.70 | 555.20 | 13 |
2005-08-05 | Perforation | 540.60 | 541.10 | 13 |
2005-08-05 | Perforation | 520.60 | 521.10 | 13 |
2005-08-05 | Perforation | 518.20 | 518.70 | 13 |
2005-08-05 | Perforation | 517.10 | 517.60 | 13 |
2005-08-05 | Perforation | 497.40 | 497.90 | 13 |
2003-07-16 | Fracture | 701.50 | 704.50 | 0 |
2005-08-05 | Perforation | 492.60 | 493.10 | 13 |
2005-08-05 | Perforation | 488.90 | 489.40 | 13 |
2005-08-05 | Perforation | 476.20 | 476.70 | 13 |
2005-08-05 | Perforation | 473.00 | 473.50 | 13 |
2005-08-05 | Perforation | 470.30 | 470.80 | 13 |
2005-08-05 | Perforation | 469.30 | 469.80 | 13 |
2005-08-05 | Perforation | 462.80 | 463.30 | 13 |
2005-08-05 | Perforation | 461.30 | 461.80 | 13 |
2005-08-05 | Perforation | 454.80 | 455.30 | 13 |
2005-08-05 | Perforation | 450.20 | 450.70 | 13 |
2004-07-07 | Perforation | 916.00 | 918.00 | 13 |
2005-08-05 | Perforation | 340.10 | 340.60 | 13 |
2005-08-05 | Perforation | 313.50 | 314.00 | 13 |
2005-08-05 | Perforation | 305.20 | 305.70 | 13 |
2005-08-05 | Perforation | 259.00 | 259.50 | 13 |
2005-08-05 | Perforation | 214.60 | 215.10 | 13 |
2005-08-06 | Fracture | 214.60 | 627.40 | 0 |
2004-07-07 | Perforation | 812.00 | 814.00 | 13 |
2004-08-13 | Fracture | 812.00 | 814.00 | 0 |
2005-08-05 | Perforation | 626.90 | 627.40 | 13 |
2005-08-05 | Perforation | 622.70 | 623.20 | 13 |
2005-08-05 | Perforation | 590.90 | 591.40 | 13 |
2005-08-05 | Perforation | 588.70 | 589.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1212 | 0.0 | 0.0 | 0.0 |
2004 | 7034 | 0.0 | 0.0 | 0.0 |
2005 | 8141 | 0.0 | 0.0 | 0.0 |
2006 | 8715 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8709 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8600 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8678 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]