X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254261916004

Well Details

Well ID: 0254261916004
Loading map...
Location: 00/16-19-025-26W4/4
Location Alias: 00/16-19-25-26 W4M
Location Alias 2: 00/16-19-025-26 W4/04
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 19
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-19-25-26
Operator Name: Ember Resources Inc.
License Number: 0203754
License Date: 1997-07-22
License Status: Issued
Spud Date: 1997-07-28
Final Drill Date: 1997-07-30
Well Total Depth: 1077.00 m
Surface Hole Latitude: 51.153672
Surface Hole Longitude: -113.610904

For data sources see[1][2]

Well History

Date Event
1997-07-22 Obtained License
1997-07-29 Surface Casing Operation Performed
1997-07-30 Finished Drilling
1997-07-30 Well Mode changed to Drilled and Cased
1997-07-31 Production Casing Operation Performed
1997-07-31 Rig Released
1997-09-02 Well Log Performed
1998-09-16 Perforation Treatment Performed - Jet Perforation
1998-09-16 Well Log Performed
2000-06-03 Perforation Treatment Performed - Fractured
2000-07-10 Perforation Treatment Performed - Jet Perforation
2000-07-10 Well Log Performed
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-14 Well Log Performed
2000-08-22 Perforation Treatment Performed - Fractured
2005-12-15 Perforation Treatment Performed - Jet Perforation
2006-01-18 Well Structure changed to Commingled
2010-07-29 Perforation Treatment Performed - Jet Perforation
2010-08-24 Perforation Treatment Performed - Fractured
2010-08-28 Well Structure changed to Commingled
2010-09-01 Perforation Treatment Performed - Jet Perforation
2010-09-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-09-16 Perforation 731.00 737.00 13
2005-12-15 Perforation 837.00 838.00 13
2010-07-29 Perforation 943.50 944.50 13
2010-07-29 Perforation 904.00 905.00 13
2010-07-29 Perforation 765.00 767.00 13
2010-07-29 Perforation 603.50 604.50 13
2010-07-29 Perforation 575.00 577.00 13
2010-07-29 Perforation 453.00 454.00 13
2010-07-29 Perforation 434.00 435.00 13
2010-07-29 Perforation 344.00 346.00 13
2010-07-29 Perforation 311.00 312.00 13
1998-09-16 Perforation 743.00 746.00 14
2010-07-29 Perforation 287.00 290.00 13
2010-07-29 Perforation 248.00 250.00 13
2010-08-24 Fracture 943.50 944.50 0
2010-08-24 Fracture 904.00 905.00 0
2010-08-24 Fracture 765.00 767.00 0
2010-09-01 Perforation 660.40 661.40 13
2010-09-01 Perforation 655.30 656.30 13
2010-09-01 Perforation 623.70 624.20 13
2010-09-01 Perforation 618.40 621.40 13
2010-09-01 Perforation 608.70 609.70 13
2000-06-03 Fracture 731.00 746.00 0
2010-09-01 Perforation 596.30 598.30 13
2010-09-01 Perforation 592.10 592.60 13
2010-09-01 Perforation 585.50 586.00 13
2010-09-01 Perforation 570.50 571.00 13
2010-09-01 Perforation 545.50 546.00 13
2010-09-01 Perforation 544.20 544.70 13
2010-09-01 Perforation 541.80 542.30 13
2010-09-01 Perforation 539.20 539.70 13
2010-09-01 Perforation 526.80 528.80 13
2010-09-01 Perforation 523.10 523.60 13
2000-06-03 Fracture 731.00 737.00 0
2010-09-01 Perforation 517.80 518.30 13
2010-09-01 Perforation 507.50 508.00 13
2010-09-01 Perforation 501.90 502.90 13
2010-09-01 Perforation 500.50 501.00 13
2010-09-01 Perforation 482.60 483.10 13
2010-09-01 Perforation 479.00 480.00 13
2010-09-01 Perforation 458.60 459.10 13
2010-09-01 Perforation 420.80 421.30 13
2010-09-01 Perforation 413.70 414.20 13
2010-09-01 Perforation 374.20 375.20 13
2000-07-10 Perforation 717.00 720.00 17
2010-09-01 Perforation 370.30 370.80 13
2010-09-01 Perforation 361.80 363.80 13
2010-09-01 Perforation 337.10 337.60 13
2010-09-01 Perforation 334.00 334.50 13
2010-09-01 Perforation 281.10 281.60 13
2010-09-01 Perforation 236.40 236.90 13
2010-09-01 Perforation 225.90 226.40 13
2010-09-04 Fracture 225.90 661.40 0
2000-07-10 Perforation 707.00 710.00 17
2000-07-14 Perforation 466.00 470.00 17
2000-07-14 Perforation 461.00 465.00 17
2000-08-22 Fracture 461.00 470.00 0

For data sources see[4]



References