If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.127598,"lon":-113.587216,"icon":""}]} |
Location: 00/01-17-025-26W4/0 | |
Location Alias: 00/01-17-25-26 W4M | |
Location Alias 2: 00/01-17-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 17 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-17-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0236736 | |
License Date: 2000-05-02 | |
License Status: Amended | |
Spud Date: 2000-06-05 | |
Final Drill Date: 2000-06-06 | |
Well Total Depth: 1053.00 m | |
Surface Hole Latitude: 51.127598 | |
Surface Hole Longitude: -113.587216 |
Date | Event |
---|---|
2000-05-02 | Obtained License |
2000-06-05 | Surface Casing Operation Performed |
2000-06-06 | Finished Drilling |
2000-06-06 | Production Casing Operation Performed |
2000-06-06 | Rig Released |
2000-06-06 | Well Mode changed to Drilled and Cased |
2000-06-14 | Well Log Performed |
2000-07-17 | Perforation Treatment Performed - Jet Perforation |
2000-07-20 | Perforation Treatment Performed - Jet Perforation |
2000-07-29 | Perforation Treatment Performed - Jet Perforation |
2000-08-18 | Perforation Treatment Performed - Fractured |
2000-08-28 | Perforation Treatment Performed - Jet Perforation |
2001-11-22 | Well Began Production |
2001-11-22 | Well Fluid changed to Gas |
2001-11-22 | Well Mode changed to Flowing |
2003-10-26 | Perforation Treatment Performed - Jet Perforation |
2003-10-27 | Perforation Treatment Performed - Fractured |
2003-12-02 | Well Log Performed |
2007-04-01 | Well Fluid changed to Gas |
2007-04-01 | Well Mode changed to Suspended |
2017-04-24 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-17 | Perforation | 873.00 | 876.00 | 7 |
2003-10-26 | Perforation | 601.70 | 602.70 | 13 |
2003-10-26 | Perforation | 599.20 | 600.20 | 13 |
2003-10-26 | Perforation | 590.90 | 591.90 | 13 |
2003-10-26 | Perforation | 577.40 | 579.40 | 13 |
2003-10-26 | Perforation | 576.20 | 577.20 | 13 |
2003-10-26 | Perforation | 552.70 | 553.70 | 13 |
2003-10-26 | Perforation | 533.50 | 536.50 | 13 |
2003-10-26 | Perforation | 516.80 | 517.80 | 13 |
2003-10-26 | Perforation | 511.60 | 512.60 | 13 |
2003-10-26 | Perforation | 493.90 | 494.90 | 13 |
2000-07-20 | Perforation | 729.50 | 732.50 | 7 |
2003-10-26 | Perforation | 489.80 | 490.80 | 13 |
2003-10-26 | Perforation | 487.60 | 488.60 | 13 |
2003-10-26 | Perforation | 483.00 | 484.00 | 13 |
2003-10-26 | Perforation | 478.70 | 479.70 | 13 |
2003-10-26 | Perforation | 467.10 | 468.10 | 13 |
2003-10-26 | Perforation | 443.90 | 444.90 | 13 |
2003-10-26 | Perforation | 419.10 | 420.10 | 13 |
2003-10-26 | Perforation | 357.70 | 358.70 | 13 |
2003-10-26 | Perforation | 351.30 | 352.30 | 13 |
2003-10-26 | Perforation | 334.50 | 335.50 | 13 |
2000-07-29 | Perforation | 723.00 | 725.00 | 7 |
2003-10-26 | Perforation | 222.10 | 223.10 | 13 |
2003-10-27 | Fracture | 222.10 | 639.80 | 0 |
2000-08-18 | Fracture | 723.00 | 732.50 | 0 |
2000-08-28 | Perforation | 695.50 | 698.50 | 7 |
2003-10-26 | Perforation | 638.80 | 639.80 | 13 |
2003-10-26 | Perforation | 637.10 | 638.10 | 13 |
2003-10-26 | Perforation | 620.10 | 621.10 | 13 |
2003-10-26 | Perforation | 607.10 | 608.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 743 | 0.0 | 0.0 | 0.0 |
2002 | 8012 | 0.0 | 0.0 | 0.0 |
2003 | 8714 | 0.0 | 0.0 | 0.0 |
2004 | 8738 | 0.0 | 0.0 | 0.0 |
2005 | 8141 | 0.0 | 0.0 | 0.0 |
2006 | 4299 | 0.0 | 0.0 | 0.0 |
For data sources see[5]