X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254261603000

Well Details

Well ID: 0254261603000
Loading map...
Location: 00/03-16-025-26W4/0
Location Alias: 00/03-16-25-26 W4M
Location Alias 2: 00/03-16-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 16
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-16-25-26
Operator Name: Ember Resources Inc.
License Number: 0411524
License Date: 2009-07-22
License Status: Amended
Spud Date: 2009-11-25
Final Drill Date: 2009-11-26
Well Total Depth: 1104.00 m
Surface Hole Latitude: 51.131310
Surface Hole Longitude: -113.579807

For data sources see[1][2]

Well History

Date Event
2009-07-22 Obtained License
2009-11-25 Direction Drilling Operation Performed - Deviate
2009-11-26 Finished Drilling
2009-11-26 Surface Casing Operation Performed
2009-11-26 Well Mode changed to Drilled and Cased
2009-11-27 Production Casing Operation Performed
2009-11-27 Rig Released
2009-12-01 Well Log Performed
2009-12-20 Perforation Treatment Performed - Jet Perforation
2010-01-25 Perforation Treatment Performed - Fractured
2010-02-02 Well Began Production
2010-02-02 Well Fluid changed to Coalbed Methane-Coals and Other
2010-02-02 Well Mode changed to Flowing
2010-04-19 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-25 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-20 Perforation 595.80 599.80 13
2009-12-20 Perforation 403.60 404.10 13
2009-12-20 Perforation 500.70 501.20 13
2009-12-20 Perforation 331.10 331.60 13
2009-12-20 Perforation 394.30 394.80 13
2009-12-20 Perforation 547.80 548.30 13
2009-12-20 Perforation 550.40 550.90 13
2009-12-20 Perforation 526.80 527.80 13
2009-12-20 Perforation 541.10 542.10 13
2009-12-20 Perforation 600.00 602.00 13
2009-12-20 Perforation 801.00 803.00 13
2009-12-20 Perforation 618.50 619.50 13
2009-12-20 Perforation 743.30 743.80 13
2009-12-20 Perforation 260.00 262.00 13
2009-12-20 Perforation 410.00 413.00 13
2009-12-20 Perforation 443.00 445.00 13
2009-12-20 Perforation 717.00 717.50 13
2009-12-20 Perforation 680.60 681.10 13
2009-12-20 Perforation 675.00 676.00 13
2009-12-20 Perforation 723.50 724.00 13
2009-12-20 Perforation 729.50 730.00 13
2009-12-20 Perforation 726.10 726.60 13
2009-12-20 Perforation 574.40 574.90 13
2010-01-25 Fracture 331.10 743.80 0
2010-01-25 Fracture 410.00 413.00 0
2010-01-25 Fracture 260.00 262.00 0
2010-01-25 Fracture 443.00 445.00 0
2010-01-25 Fracture 801.00 803.00 0
2010-01-25 Fracture 600.00 602.00 0
2009-12-20 Perforation 579.30 581.30 13
2009-12-20 Perforation 663.90 664.40 13
2009-12-20 Perforation 672.20 673.20 13
2009-12-20 Perforation 639.50 640.00 13
2009-12-20 Perforation 647.60 650.60 13
2009-12-20 Perforation 555.40 555.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7991 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8600 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References