If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.127708,"lon":-113.557084,"icon":""}]} |
Location: 00/03-15-025-26W4/0 | |
Location Alias: 00/03-15-25-26 W4M | |
Location Alias 2: 00/03-15-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 3-15-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420432 | |
License Date: 2010-05-14 | |
License Status: Issued | |
Spud Date: 2010-11-28 | |
Final Drill Date: 2010-12-02 | |
Well Total Depth: 970.00 m | |
Surface Hole Latitude: 51.127708 | |
Surface Hole Longitude: -113.557084 |
Date | Event |
---|---|
2010-05-14 | Obtained License |
2010-11-28 | Surface Casing Operation Performed |
2010-12-02 | Finished Drilling |
2010-12-02 | Production Casing Operation Performed |
2010-12-02 | Rig Released |
2010-12-02 | Well Mode changed to Drilled and Cased |
2010-12-05 | Well Log Performed |
2011-01-07 | Perforation Treatment Performed - Jet Perforation |
2011-02-08 | Perforation Treatment Performed - Fractured |
2011-02-11 | Well Fluid changed to Gas |
2011-02-11 | Well Mode changed to Testing |
2011-02-16 | Perforation Treatment Performed - Jet Perforation |
2011-02-20 | Perforation Treatment Performed - Fractured |
2011-03-06 | Well Began Production |
2011-03-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-07 | Perforation | 770.00 | 772.00 | 13 |
2011-02-08 | Fracture | 372.00 | 375.00 | 0 |
2011-02-16 | Perforation | 325.20 | 325.70 | 13 |
2011-02-16 | Perforation | 335.50 | 336.00 | 13 |
2011-02-16 | Perforation | 550.00 | 553.00 | 13 |
2011-02-16 | Perforation | 209.20 | 211.20 | 13 |
2011-02-16 | Perforation | 447.60 | 449.60 | 13 |
2011-02-16 | Perforation | 460.90 | 461.40 | 13 |
2011-02-16 | Perforation | 427.70 | 428.20 | 13 |
2011-02-16 | Perforation | 443.50 | 444.00 | 13 |
2011-02-16 | Perforation | 403.50 | 404.50 | 13 |
2011-01-07 | Perforation | 702.00 | 704.00 | 13 |
2011-02-16 | Perforation | 214.00 | 216.00 | 13 |
2011-02-16 | Perforation | 218.00 | 220.00 | 13 |
2011-02-16 | Perforation | 185.00 | 187.00 | 13 |
2011-02-16 | Perforation | 197.00 | 200.00 | 13 |
2011-02-16 | Perforation | 265.00 | 267.00 | 13 |
2011-02-16 | Perforation | 271.00 | 272.00 | 13 |
2011-02-16 | Perforation | 223.00 | 224.00 | 13 |
2011-02-16 | Perforation | 237.00 | 239.00 | 13 |
2011-02-16 | Perforation | 465.70 | 466.20 | 13 |
2011-02-16 | Perforation | 587.70 | 588.20 | 13 |
2011-01-07 | Perforation | 685.00 | 687.00 | 13 |
2011-02-16 | Perforation | 517.00 | 518.00 | 13 |
2011-02-16 | Perforation | 626.10 | 627.10 | 13 |
2011-02-16 | Perforation | 619.20 | 619.70 | 13 |
2011-02-16 | Perforation | 530.20 | 530.70 | 13 |
2011-02-16 | Perforation | 572.30 | 573.30 | 13 |
2011-02-16 | Perforation | 580.70 | 581.70 | 13 |
2011-02-16 | Perforation | 557.60 | 558.60 | 13 |
2011-02-16 | Perforation | 559.20 | 560.20 | 13 |
2011-02-16 | Perforation | 583.50 | 584.50 | 13 |
2011-02-16 | Perforation | 488.80 | 489.30 | 13 |
2011-01-07 | Perforation | 535.00 | 538.00 | 13 |
2011-02-16 | Perforation | 468.10 | 468.60 | 13 |
2011-02-16 | Perforation | 469.70 | 470.20 | 13 |
2011-02-16 | Perforation | 473.00 | 474.00 | 13 |
2011-02-16 | Perforation | 492.80 | 493.30 | 13 |
2011-02-16 | Perforation | 509.60 | 512.60 | 13 |
2011-02-16 | Perforation | 495.10 | 497.10 | 13 |
2011-02-20 | Fracture | 550.00 | 553.00 | 0 |
2011-02-20 | Fracture | 214.00 | 272.00 | 0 |
2011-02-20 | Fracture | 403.50 | 404.50 | 0 |
2011-02-20 | Fracture | 530.20 | 530.70 | 0 |
2011-01-07 | Perforation | 372.00 | 375.00 | 13 |
2011-02-20 | Fracture | 557.60 | 588.20 | 0 |
2011-02-20 | Fracture | 619.20 | 627.10 | 0 |
2011-02-20 | Fracture | 209.20 | 211.20 | 0 |
2011-02-20 | Fracture | 325.20 | 336.00 | 0 |
2011-02-20 | Fracture | 427.70 | 512.60 | 0 |
2011-02-08 | Fracture | 770.00 | 772.00 | 0 |
2011-02-08 | Fracture | 702.00 | 704.00 | 0 |
2011-02-08 | Fracture | 685.00 | 687.00 | 0 |
2011-02-08 | Fracture | 535.00 | 538.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7217 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]