If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.112739,"lon":-113.498269,"icon":""}]} |
Location: 00/01-12-025-26W4/0 | |
Location Alias: 00/01-12-25-26 W4M | |
Location Alias 2: 00/01-12-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 12 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-12-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0236238 | |
License Date: 2000-04-17 | |
License Status: Amended | |
Spud Date: 2000-05-30 | |
Final Drill Date: 2000-05-31 | |
Well Total Depth: 996.00 m | |
Surface Hole Latitude: 51.112739 | |
Surface Hole Longitude: -113.498269 |
Date | Event |
---|---|
2000-04-17 | Obtained License |
2000-05-30 | Surface Casing Operation Performed |
2000-05-31 | Finished Drilling |
2000-05-31 | Well Log Performed |
2000-06-01 | Production Casing Operation Performed |
2000-06-01 | Rig Released |
2000-06-01 | Well Mode changed to Drilled and Cased |
2000-06-19 | Well Log Performed |
2000-08-01 | Perforation Treatment Performed - Jet Perforation |
2000-08-16 | Perforation Treatment Performed - Jet Perforation |
2000-09-07 | Perforation Treatment Performed - Fractured |
2001-08-12 | Perforation Treatment Performed - Jet Perforation |
2001-08-31 | Perforation Treatment Performed - Fractured |
2001-09-18 | Well Began Production |
2001-09-18 | Well Fluid changed to Gas |
2001-09-18 | Well Mode changed to Flowing |
2011-09-12 | Perforation Treatment Performed - Jet Perforation |
2011-09-14 | Perforation Treatment Performed - Fractured |
2011-10-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-05 | Well Mode changed to Flowing |
2017-03-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-08-01 | Perforation | 933.00 | 936.00 | 7 |
2011-09-12 | Perforation | 350.90 | 351.40 | 13 |
2011-09-12 | Perforation | 405.70 | 407.20 | 13 |
2011-09-12 | Perforation | 416.40 | 417.40 | 13 |
2011-09-12 | Perforation | 422.50 | 423.00 | 13 |
2011-09-12 | Perforation | 424.00 | 424.50 | 13 |
2011-09-12 | Perforation | 425.60 | 426.10 | 13 |
2011-09-12 | Perforation | 427.10 | 428.10 | 13 |
2011-09-12 | Perforation | 452.00 | 452.50 | 13 |
2011-09-12 | Perforation | 459.80 | 461.30 | 13 |
2011-09-12 | Perforation | 473.70 | 474.70 | 13 |
2000-08-16 | Perforation | 693.00 | 695.00 | 7 |
2011-09-12 | Perforation | 475.40 | 477.40 | 13 |
2011-09-12 | Perforation | 480.50 | 483.50 | 13 |
2011-09-12 | Perforation | 502.50 | 505.50 | 13 |
2011-09-12 | Perforation | 517.00 | 520.00 | 13 |
2011-09-12 | Perforation | 526.40 | 527.90 | 13 |
2011-09-12 | Perforation | 529.80 | 530.30 | 13 |
2011-09-12 | Perforation | 545.30 | 545.80 | 13 |
2011-09-12 | Perforation | 552.10 | 553.10 | 13 |
2011-09-12 | Perforation | 555.70 | 556.70 | 13 |
2011-09-12 | Perforation | 559.50 | 560.00 | 13 |
2000-08-16 | Perforation | 684.50 | 686.50 | 7 |
2011-09-12 | Perforation | 597.00 | 597.50 | 13 |
2011-09-12 | Perforation | 598.50 | 599.00 | 13 |
2011-09-12 | Perforation | 599.80 | 600.30 | 13 |
2011-09-14 | Fracture | 276.70 | 600.30 | 0 |
2000-09-07 | Fracture | 684.50 | 695.00 | 0 |
2001-08-12 | Perforation | 436.00 | 440.00 | 7 |
2001-08-31 | Fracture | 436.00 | 440.00 | 0 |
2011-09-12 | Perforation | 276.70 | 277.20 | 13 |
2011-09-12 | Perforation | 293.00 | 293.50 | 13 |
2011-09-12 | Perforation | 301.60 | 302.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 2510 | 0.0 | 0.0 | 0.0 |
2002 | 8758 | 0.0 | 0.0 | 0.0 |
2003 | 8603 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 7984 | 0.0 | 0.0 | 0.0 |
2006 | 8748 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 6393 | 0.0 | 0.0 | 0.0 |
2012 | 8451 | 0.0 | 0.0 | 0.0 |
2013 | 8634 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8721 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[5]