X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254261016000

Well Details

Well ID: 0254261016000
Loading map...
Location: 00/16-10-025-26W4/0
Location Alias: 00/16-10-25-26 W4M
Location Alias 2: 00/16-10-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 10
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-10-25-26
Operator Name: Ember Resources Inc.
License Number: 0286348
License Date: 2003-04-25
License Status: Issued
Spud Date: 2003-06-28
Final Drill Date: 2003-06-29
Well Total Depth: 845.00 m
Surface Hole Latitude: 51.121139
Surface Hole Longitude: -113.540659

For data sources see[1][2]

Well History

Date Event
2003-04-25 Obtained License
2003-06-28 Surface Casing Operation Performed
2003-06-29 Direction Drilling Operation Performed - Deviate
2003-06-29 Finished Drilling
2003-06-29 Well Mode changed to Drilled and Cased
2003-06-30 Production Casing Operation Performed
2003-06-30 Rig Released
2003-07-15 Well Log Performed
2003-09-05 Perforation Treatment Performed - Jet Perforation
2003-09-07 Perforation Treatment Performed - Fractured
2003-10-06 Well Began Production
2003-10-06 Well Fluid changed to Coalbed Methane-Coals Only
2003-10-06 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-06-29 85.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-05 Perforation 751.60 753.60 13
2003-09-05 Perforation 583.30 585.30 13
2003-09-05 Perforation 580.90 582.90 13
2003-09-05 Perforation 560.50 562.50 13
2003-09-05 Perforation 554.70 555.70 13
2003-09-05 Perforation 546.30 547.30 13
2003-09-05 Perforation 529.30 530.30 13
2003-09-05 Perforation 523.40 524.40 13
2003-09-05 Perforation 522.00 523.00 13
2003-09-05 Perforation 517.80 518.80 13
2003-09-05 Perforation 512.60 513.60 13
2003-09-05 Perforation 743.80 744.80 13
2003-09-05 Perforation 498.40 500.40 13
2003-09-05 Perforation 469.50 470.50 13
2003-09-05 Perforation 352.20 353.20 13
2003-09-05 Perforation 341.20 342.20 13
2003-09-05 Perforation 320.10 321.10 13
2003-09-05 Perforation 289.40 290.40 13
2003-09-05 Perforation 212.30 214.30 13
2003-09-07 Fracture 212.30 753.60 0
2003-09-05 Perforation 694.60 695.60 13
2003-09-05 Perforation 688.90 689.90 13
2003-09-05 Perforation 684.00 685.00 13
2003-09-05 Perforation 673.50 674.50 13
2003-09-05 Perforation 655.30 656.30 13
2003-09-05 Perforation 651.10 653.10 13
2003-09-05 Perforation 610.80 611.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2052 0.0 0.0 0.0
2004 8738 0.0 0.0 0.0
2005 8141 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References