If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.11968,"lon":-113.556361,"icon":""}]} |
Location: 00/11-10-025-26W4/0 | |
Location Alias: 00/11-10-25-26 W4M | |
Location Alias 2: 00/11-10-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 10 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 11-10-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421127 | |
License Date: 2010-06-11 | |
License Status: Issued | |
Spud Date: 2010-11-28 | |
Final Drill Date: 2010-12-03 | |
Well Total Depth: 970.00 m | |
Surface Hole Latitude: 51.119680 | |
Surface Hole Longitude: -113.556361 |
Date | Event |
---|---|
2010-06-11 | Obtained License |
2010-11-28 | Surface Casing Operation Performed |
2010-12-03 | Finished Drilling |
2010-12-03 | Production Casing Operation Performed |
2010-12-03 | Rig Released |
2010-12-03 | Well Mode changed to Drilled and Cased |
2010-12-22 | Well Log Performed |
2011-01-19 | Perforation Treatment Performed - Jet Perforation |
2011-02-16 | Perforation Treatment Performed - Fractured |
2011-02-19 | Well Fluid changed to Gas |
2011-02-19 | Well Mode changed to Testing |
2011-03-04 | Perforation Treatment Performed - Jet Perforation |
2011-03-08 | Perforation Treatment Performed - Fractured |
2011-03-19 | Well Began Production |
2011-03-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-19 | Perforation | 935.00 | 936.00 | 13 |
2011-03-04 | Perforation | 309.20 | 309.70 | 13 |
2011-03-04 | Perforation | 463.60 | 464.60 | 13 |
2011-03-04 | Perforation | 467.80 | 468.30 | 13 |
2011-03-04 | Perforation | 432.90 | 433.40 | 13 |
2011-03-04 | Perforation | 452.90 | 454.40 | 13 |
2011-03-04 | Perforation | 255.00 | 257.00 | 13 |
2011-03-04 | Perforation | 279.00 | 280.00 | 13 |
2011-03-04 | Perforation | 191.00 | 194.00 | 13 |
2011-03-04 | Perforation | 220.00 | 222.00 | 13 |
2011-03-04 | Perforation | 518.00 | 520.00 | 13 |
2011-01-19 | Perforation | 877.00 | 879.00 | 13 |
2011-03-04 | Perforation | 568.00 | 571.00 | 13 |
2011-03-04 | Perforation | 346.00 | 347.00 | 13 |
2011-03-04 | Perforation | 508.00 | 511.00 | 13 |
2011-03-04 | Perforation | 532.50 | 533.00 | 13 |
2011-03-04 | Perforation | 556.40 | 557.40 | 13 |
2011-03-04 | Perforation | 624.50 | 625.50 | 13 |
2011-03-04 | Perforation | 631.10 | 631.60 | 13 |
2011-03-04 | Perforation | 579.60 | 581.10 | 13 |
2011-03-04 | Perforation | 583.60 | 584.60 | 13 |
2011-03-04 | Perforation | 557.90 | 558.90 | 13 |
2011-01-19 | Perforation | 706.00 | 709.00 | 13 |
2011-03-04 | Perforation | 573.80 | 574.80 | 13 |
2011-03-04 | Perforation | 474.50 | 475.50 | 13 |
2011-03-04 | Perforation | 498.90 | 499.40 | 13 |
2011-03-04 | Perforation | 487.20 | 487.70 | 13 |
2011-03-04 | Perforation | 493.80 | 494.30 | 13 |
2011-03-04 | Perforation | 471.80 | 472.30 | 13 |
2011-03-04 | Perforation | 497.90 | 498.40 | 13 |
2011-03-04 | Perforation | 513.40 | 513.90 | 13 |
2011-03-04 | Perforation | 470.20 | 470.70 | 13 |
2011-03-08 | Fracture | 508.00 | 511.00 | 0 |
2011-02-16 | Fracture | 935.00 | 936.00 | 0 |
2011-03-08 | Fracture | 518.00 | 520.00 | 0 |
2011-03-08 | Fracture | 346.00 | 347.00 | 0 |
2011-03-08 | Fracture | 220.00 | 280.00 | 0 |
2011-03-08 | Fracture | 568.00 | 571.00 | 0 |
2011-03-08 | Fracture | 532.50 | 558.90 | 0 |
2011-03-08 | Fracture | 573.80 | 584.60 | 0 |
2011-03-08 | Fracture | 624.50 | 631.60 | 0 |
2011-03-08 | Fracture | 309.20 | 342.30 | 0 |
2011-03-08 | Fracture | 387.80 | 499.40 | 0 |
2011-03-08 | Fracture | 513.40 | 513.90 | 0 |
2011-02-16 | Fracture | 877.00 | 879.00 | 0 |
2011-02-16 | Fracture | 706.00 | 709.00 | 0 |
2011-03-04 | Perforation | 341.80 | 342.30 | 13 |
2011-03-04 | Perforation | 387.80 | 388.30 | 13 |
2011-03-04 | Perforation | 202.20 | 204.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6887 | 0.0 | 0.0 | 0.0 |
2012 | 8589 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8612 | 0.0 | 0.0 | 0.0 |
2016 | 8626 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[5]