If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254251201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.113714,"lon":-113.359514,"icon":""}]} |
Location: 00/01-12-025-25W4/0 | |
Location Alias: 00/01-12-25-25 W4M | |
Location Alias 2: 00/01-12-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 1-12-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0355533 | |
License Date: 2006-04-12 | |
License Status: Issued | |
Spud Date: 2006-09-30 | |
Final Drill Date: 2006-10-05 | |
Well Total Depth: 674.00 m | |
Surface Hole Latitude: 51.113714 | |
Surface Hole Longitude: -113.359514 |
Date | Event |
---|---|
2006-04-12 | Obtained License |
2006-09-30 | Surface Casing Operation Performed |
2006-10-05 | Finished Drilling |
2006-10-05 | Production Casing Operation Performed |
2006-10-05 | Rig Released |
2006-10-05 | Well Mode changed to Drilled and Cased |
2006-10-08 | Well Log Performed |
2006-11-03 | Perforation Treatment Performed - Jet Perforation |
2006-11-14 | Perforation Treatment Performed - Fractured |
2006-11-24 | Well Began Production |
2006-11-24 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-11-24 | Well Mode changed to Flowing |
2009-11-25 | Well Log Performed |
2009-12-15 | Perforation Treatment Performed - Jet Perforation |
2009-12-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-12-16 | Well Mode changed to Flowing |
2009-12-21 | Perforation Treatment Performed - Fractured |
2010-02-14 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-11-03 | Perforation | 546.60 | 547.10 | 13 |
2006-11-03 | Perforation | 473.40 | 474.40 | 13 |
2006-11-03 | Perforation | 420.10 | 420.60 | 13 |
2006-11-03 | Perforation | 416.70 | 417.20 | 13 |
2006-11-03 | Perforation | 415.40 | 415.90 | 13 |
2006-11-03 | Perforation | 412.50 | 413.00 | 13 |
2006-11-03 | Perforation | 404.70 | 405.70 | 13 |
2006-11-03 | Perforation | 400.40 | 400.90 | 13 |
2006-11-03 | Perforation | 392.40 | 392.90 | 13 |
2006-11-03 | Perforation | 387.80 | 388.30 | 13 |
2006-11-03 | Perforation | 385.10 | 385.60 | 13 |
2006-11-03 | Perforation | 544.50 | 545.50 | 13 |
2006-11-03 | Perforation | 378.70 | 379.70 | 13 |
2006-11-03 | Perforation | 374.00 | 376.00 | 13 |
2006-11-03 | Perforation | 367.50 | 368.00 | 13 |
2006-11-03 | Perforation | 364.10 | 364.60 | 13 |
2006-11-03 | Perforation | 362.20 | 362.70 | 13 |
2006-11-03 | Perforation | 319.30 | 319.80 | 13 |
2006-11-03 | Perforation | 312.20 | 312.70 | 13 |
2006-11-03 | Perforation | 304.00 | 304.50 | 13 |
2006-11-03 | Perforation | 266.90 | 267.40 | 13 |
2006-11-03 | Perforation | 250.90 | 251.40 | 13 |
2006-11-03 | Perforation | 540.80 | 541.30 | 13 |
2006-11-03 | Perforation | 247.20 | 247.70 | 13 |
2006-11-03 | Perforation | 241.00 | 241.50 | 13 |
2006-11-14 | Fracture | 241.00 | 547.10 | 0 |
2009-12-15 | Perforation | 337.00 | 338.00 | 13 |
2009-12-15 | Perforation | 308.00 | 309.00 | 13 |
2009-12-21 | Fracture | 241.00 | 547.10 | 0 |
2009-12-21 | Fracture | 308.00 | 338.00 | 0 |
2006-11-03 | Perforation | 538.90 | 539.40 | 13 |
2006-11-03 | Perforation | 504.10 | 504.60 | 13 |
2006-11-03 | Perforation | 499.50 | 501.50 | 13 |
2006-11-03 | Perforation | 495.90 | 496.90 | 13 |
2006-11-03 | Perforation | 489.60 | 490.10 | 13 |
2006-11-03 | Perforation | 480.00 | 480.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 912 | 0.0 | 0.0 | 0.0 |
2007 | 8641 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 8724 | 0.0 | 0.0 | 0.0 |
2012 | 8686 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8691 | 0.0 | 0.0 | 0.0 |
2017 | 8736 | 0.0 | 0.0 | 0.0 |
2018 | 8736 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]