If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.104972,"lon":-113.45323,"icon":""}]} |
Location: 00/10-05-025-25W4/0 | |
Location Alias: 00/10-05-25-25 W4M | |
Location Alias 2: 00/10-05-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 05 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-5-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0324557 | |
License Date: 2005-01-19 | |
License Status: Issued | |
Spud Date: 2005-02-01 | |
Final Drill Date: 2005-02-02 | |
Well Total Depth: 700.00 m | |
Surface Hole Latitude: 51.104972 | |
Surface Hole Longitude: -113.453230 |
Date | Event |
---|---|
2005-01-19 | Obtained License |
2005-02-02 | Finished Drilling |
2005-02-02 | Surface Casing Operation Performed |
2005-02-02 | Well Mode changed to Drilled and Cased |
2005-02-03 | Production Casing Operation Performed |
2005-02-03 | Rig Released |
2005-02-05 | Well Log Performed |
2005-02-27 | Perforation Treatment Performed - Jet Perforation |
2005-04-27 | Perforation Treatment Performed - Fractured |
2005-11-05 | Well Began Production |
2005-11-05 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-11-05 | Well Mode changed to Flowing |
2008-10-18 | Well Log Performed |
2009-09-26 | Well Log Performed |
2010-11-26 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-27 | Perforation | 588.40 | 588.90 | 13 |
2005-02-27 | Perforation | 507.30 | 507.80 | 13 |
2005-02-27 | Perforation | 505.40 | 505.90 | 13 |
2005-02-27 | Perforation | 502.90 | 503.40 | 13 |
2005-02-27 | Perforation | 475.80 | 476.30 | 13 |
2005-02-27 | Perforation | 449.70 | 450.20 | 13 |
2005-02-27 | Perforation | 447.40 | 447.90 | 13 |
2005-02-27 | Perforation | 434.10 | 434.60 | 13 |
2005-02-27 | Perforation | 429.70 | 430.20 | 13 |
2005-02-27 | Perforation | 421.90 | 422.20 | 13 |
2005-02-27 | Perforation | 410.60 | 411.10 | 13 |
2005-02-27 | Perforation | 581.70 | 582.20 | 13 |
2005-02-27 | Perforation | 409.00 | 409.50 | 13 |
2005-02-27 | Perforation | 406.20 | 406.70 | 13 |
2005-02-27 | Perforation | 396.50 | 397.00 | 13 |
2005-02-27 | Perforation | 385.40 | 385.90 | 13 |
2005-02-27 | Perforation | 379.70 | 380.20 | 13 |
2005-02-27 | Perforation | 364.10 | 364.60 | 13 |
2005-02-27 | Perforation | 340.40 | 340.90 | 13 |
2005-02-27 | Perforation | 331.00 | 331.50 | 13 |
2005-02-27 | Perforation | 302.20 | 302.70 | 13 |
2005-02-27 | Perforation | 287.20 | 287.70 | 13 |
2005-02-27 | Perforation | 577.00 | 577.50 | 13 |
2005-02-27 | Perforation | 281.60 | 282.10 | 13 |
2005-02-27 | Perforation | 267.40 | 267.90 | 13 |
2005-02-27 | Perforation | 258.60 | 259.10 | 13 |
2005-02-27 | Perforation | 251.20 | 251.70 | 13 |
2005-02-27 | Perforation | 239.60 | 240.10 | 13 |
2005-02-27 | Perforation | 203.50 | 204.00 | 13 |
2005-04-27 | Fracture | 203.50 | 588.90 | 0 |
2005-02-27 | Perforation | 570.50 | 571.00 | 13 |
2005-02-27 | Perforation | 568.80 | 569.30 | 13 |
2005-02-27 | Perforation | 533.10 | 533.60 | 13 |
2005-02-27 | Perforation | 531.60 | 532.10 | 13 |
2005-02-27 | Perforation | 528.80 | 529.30 | 13 |
2005-02-27 | Perforation | 521.40 | 521.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1357 | 0.0 | 0.0 | 0.0 |
2006 | 8656 | 0.0 | 0.0 | 0.0 |
2007 | 8661 | 0.0 | 0.0 | 0.0 |
2008 | 8039 | 0.0 | 0.0 | 0.0 |
2009 | 4416 | 0.0 | 0.0 | 0.0 |
2010 | 8663 | 0.0 | 0.0 | 0.0 |
2011 | 8741 | 0.0 | 0.0 | 0.0 |
2012 | 8068 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8661 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]