X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254232903000

Well Details

Well ID: 0254232903000
Loading map...
Location: 00/03-29-025-23W4/0
Location Alias: 00/03-29-25-23 W4M
Location Alias 2: 00/03-29-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 29
County/Municipality: Wheatland County
Well Name: HARVEST ROFORD 3-29-25-23
Operator Name: Harvest Operations Corp.
License Number: 0179638
License Date: 1995-08-01
License Status: Suspension
Spud Date: 1995-09-02
Final Drill Date: 1995-09-09
Well Total Depth: 1650.00 m
Surface Hole Latitude: 51.155557
Surface Hole Longitude: -113.181728

For data sources see[1][2]

Well History

Date Event
1995-08-01 Obtained License
1995-09-02 Lost Circulation Occurred
1995-09-03 Surface Casing Operation Performed
1995-09-05 Direction Drilling Operation Performed - Deviate
1995-09-09 Finished Drilling
1995-09-09 Well Log Performed
1995-09-09 Well Mode changed to Drilled and Cased
1995-09-11 Production Casing Operation Performed
1995-09-11 Rig Released
1995-09-13 Well Log Performed
1995-10-03 Well Log Performed
1995-10-05 Perforation Treatment Performed - Fractured
1995-10-05 Perforation Treatment Performed - Jet Perforation
1995-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-07 Perforation Treatment Performed - Fractured
1995-10-07 Perforation Treatment Performed - Jet Perforation
1995-10-07 Plug Back Performed
1995-10-11 Perforation Treatment Performed - Fractured
1995-10-18 Well Began Production
1995-10-18 Well Fluid changed to Crude Oil
1995-10-18 Well Mode changed to Pumping
1995-10-20 Well Fluid changed to Crude Oil
1995-10-20 Well Mode changed to Suspended
1995-11-01 Well Fluid changed to Crude Oil
1995-11-01 Well Mode changed to Pumping
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended
2009-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-21 Plug Back Performed
2009-12-21 Well Fluid changed to Crude Oil
2009-12-21 Well Log Performed
2009-12-21 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-09-05 1003.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-05 Perforation 1617.00 1618.50 17
1995-10-05 Fracture 1617.00 1618.50 0
1995-10-07 Packing Device Capped w/Cement 1603.80 1612.00 0
1995-10-07 Perforation 1591.00 1592.50 20
1995-10-07 Fracture 1591.00 1592.50 0
1995-10-11 Fracture 1591.00 1592.50 0
2009-12-21 Packing Device Capped w/Cement 1577.00 1585.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1244 0.0 0.0 0.0
1996 3356 0.0 0.0 0.0
1997 76 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-09-02 Lost Circulation 55.00 55.00

For data sources see[7]

References