If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254231912003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.148282,"lon":-113.213557,"icon":""}]} |
Location: 00/12-19-025-23W4/3 | |
Location Alias: 00/12-19-25-23 W4M | |
Location Alias 2: 00/12-19-025-23 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Wheatland County | |
Well Name: CPC RESOURCES ROCKYFRD 12-19-25-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0204315 | |
License Date: 1997-08-01 | |
License Status: Issued | |
Spud Date: 1997-08-19 | |
Final Drill Date: 1997-08-19 | |
Well Total Depth: 932.00 m | |
Surface Hole Latitude: 51.148282 | |
Surface Hole Longitude: -113.213557 |
Date | Event |
---|---|
1997-08-01 | Obtained License |
1997-08-19 | Finished Drilling |
1997-08-19 | Production Casing Operation Performed |
1997-08-19 | Rig Released |
1997-08-19 | Well Mode changed to Drilled and Cased |
1997-09-19 | Well Log Performed |
1997-10-09 | Perforation Treatment Performed - Jet Perforation |
2003-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-12 | Plug Back Performed |
2003-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-13 | Perforation Treatment Performed - Jet Perforation |
2003-03-13 | Plug Back Performed |
2003-04-22 | Perforation Treatment Performed - Jet Perforation |
2003-05-22 | Perforation Treatment Performed - Jet Perforation |
2003-05-23 | Perforation Treatment Performed - Jet Perforation |
2003-05-24 | Perforation Treatment Performed - Jet Perforation |
2003-05-25 | Perforation Treatment Performed - Jet Perforation |
2003-05-26 | Perforation Treatment Performed - Jet Perforation |
2003-06-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2003-06-01 | Well Mode changed to Testing |
2003-11-24 | Perforation Treatment Performed - Jet Perforation |
2003-11-26 | Perforation Treatment Performed - Fractured |
2003-12-01 | Well Began Production |
2003-12-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2003-12-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-09 | Perforation | 824.00 | 833.00 | 7 |
2003-05-22 | Perforation | 408.00 | 411.00 | 7 |
2003-05-22 | Perforation | 401.00 | 404.00 | 7 |
2003-05-23 | Perforation | 378.00 | 381.00 | 7 |
2003-05-23 | Perforation | 372.00 | 375.00 | 7 |
2003-05-24 | Perforation | 318.50 | 320.50 | 7 |
2003-05-24 | Perforation | 327.50 | 329.50 | 7 |
2003-05-24 | Perforation | 310.00 | 313.00 | 7 |
2003-05-25 | Perforation | 292.00 | 295.00 | 7 |
2003-05-25 | Perforation | 283.00 | 285.00 | 7 |
2003-05-25 | Perforation | 274.00 | 276.00 | 7 |
1997-10-09 | Perforation | 779.00 | 785.00 | 7 |
2003-05-25 | Perforation | 267.00 | 269.00 | 7 |
2003-05-26 | Perforation | 257.00 | 260.00 | 7 |
2003-05-26 | Perforation | 250.00 | 253.00 | 7 |
2003-05-26 | Perforation | 244.00 | 247.00 | 7 |
2003-05-26 | Perforation | 239.00 | 241.00 | 7 |
2003-11-24 | Perforation | 487.00 | 488.00 | 7 |
2003-11-24 | Perforation | 480.00 | 481.00 | 7 |
2003-11-24 | Perforation | 471.60 | 472.60 | 7 |
2003-11-24 | Perforation | 461.00 | 463.00 | 7 |
2003-11-24 | Perforation | 404.00 | 407.00 | 7 |
2003-03-12 | Packing Device Capped w/Cement | 812.00 | 820.00 | 0 |
2003-11-24 | Perforation | 392.50 | 395.50 | 7 |
2003-11-24 | Perforation | 364.00 | 366.00 | 7 |
2003-11-24 | Perforation | 358.00 | 360.00 | 7 |
2003-11-24 | Perforation | 352.00 | 353.00 | 7 |
2003-11-24 | Perforation | 347.00 | 348.00 | 7 |
2003-11-24 | Perforation | 345.00 | 346.00 | 7 |
2003-11-24 | Perforation | 343.00 | 344.00 | 7 |
2003-11-24 | Perforation | 333.70 | 334.70 | 7 |
2003-11-24 | Perforation | 296.00 | 297.00 | 7 |
2003-11-24 | Perforation | 236.00 | 239.00 | 7 |
2003-03-13 | Packing Device Capped w/Cement | 767.00 | 775.00 | 0 |
2003-11-24 | Perforation | 227.70 | 228.70 | 7 |
2003-11-26 | Fracture | 227.70 | 488.00 | 0 |
2003-03-13 | Perforation | 484.00 | 486.00 | 7 |
2003-03-13 | Perforation | 481.00 | 483.00 | 7 |
2003-04-22 | Perforation | 465.00 | 466.00 | 7 |
2003-04-22 | Perforation | 448.00 | 451.00 | 7 |
2003-04-22 | Perforation | 442.50 | 445.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1032 | 0.0 | 0.0 | 0.0 |
2004 | 8732 | 0.0 | 0.0 | 0.0 |
2005 | 8758 | 0.0 | 0.0 | 0.0 |
2006 | 8740 | 0.0 | 0.0 | 0.0 |
2007 | 8753 | 0.0 | 0.0 | 0.0 |
2008 | 8771 | 0.0 | 0.0 | 0.0 |
2009 | 8716 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 8675 | 0.0 | 0.0 | 0.0 |
2012 | 8774 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8664 | 0.0 | 0.0 | 0.0 |
2015 | 8738 | 0.0 | 0.0 | 0.0 |
2016 | 8758 | 0.0 | 0.0 | 0.0 |
2017 | 8725 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]