X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254221205020

Well Details

Well ID: 0254221205020
Loading map...
Location: 02/05-12-025-22W4/0
Location Alias: 02/05-12-25-22 W4M
Location Alias 2: 02/05-12-025-22 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 12
County/Municipality: Wheatland County
Well Name: LOGIC ENERGY PARFLESH 5-12-25-22
Operator Name: Logic Energy Ltd.
License Number: 0103676
License Date: 1983-10-21
License Status: Issued
Spud Date: 1983-11-02
Final Drill Date: 1983-11-09
Well Total Depth: 1506.00 m
Surface Hole Latitude: 51.117391
Surface Hole Longitude: -112.957132

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-10-21 Obtained License
1983-11-09 Finished Drilling
1983-11-09 Well Log Performed
1983-11-09 Well Mode changed to Drilled and Cased
1983-11-10 Drill Stem Test Performed
1983-11-12 Production Casing Operation Performed
1983-12-09 Well Log Performed
1983-12-12 Perforation Treatment Performed - Jet Perforation
1983-12-12 Well Log Performed
1984-03-01 Well Began Production
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Pumping
1991-04-30 Perforation Treatment Performed - Jet Perforation
1991-04-30 Well Log Performed
1992-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-02 Well Fluid changed to Crude Oil
1992-06-02 Well Log Performed
1992-06-02 Well Mode changed to Suspended
1994-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-04 Perforation Treatment Performed - Jet Perforation
1994-11-04 Perforation Treatment Performed - Remedial Casing
1994-11-06 Well Log Performed
1994-11-10 Well Log Performed
1997-06-15 Well Log Performed
1997-06-16 Perforation Treatment Performed - Casing Patch (Over Perfs)
1997-06-16 Perforation Treatment Performed - Jet Perforation
1997-06-16 Well Log Performed
1997-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-21 Well Log Performed
1997-06-27 Well Log Performed
1997-09-16 Well Began Injection
1997-09-16 Well Fluid changed to Water
1997-09-16 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-12 Perforation 1458.00 1464.00 13
1994-11-04 Remedial Casing Cementing 225.00 225.30 0
1997-06-16 Casing Patch 401.86 406.43 0
1997-06-16 Casing Patch 222.87 227.43 0
1997-06-16 Perforation 1451.00 1464.00 17
1997-06-18 Acid Treatment 1451.00 1464.00 0
1991-04-30 Perforation 1451.90 1457.90 13
1991-04-30 Perforation 1451.00 1452.00 13
1992-06-02 Packing Device Capped w/Cement 1449.00 1457.00 0
1994-11-04 Perforation 404.00 404.30 13
1994-11-04 Acid Treatment 404.00 404.30 0
1994-11-04 Remedial Casing Cementing 404.00 404.30 0
1994-11-04 Perforation 225.00 225.30 13
1994-11-04 Acid Treatment 225.00 225.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6368 0.0 0.0 0.0
1985 6756 0.0 0.0 0.0
1986 7969 0.0 0.0 0.0
1987 7658 0.0 0.0 0.0
1988 8012 0.0 0.0 0.0
1989 8287 0.0 0.0 0.0
1990 7981 0.0 0.0 0.0
1991 8388 0.0 0.0 0.0
1992 2228 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References