X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254220405002

Well Details

Well ID: 0254220405002
Loading map...
Location: 00/05-04-025-22W4/2
Location Alias: 00/05-04-25-22 W4M
Location Alias 2: 00/05-04-025-22 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 04
County/Municipality: Wheatland County
Well Name: PCP PARFLESH 5-4-25-22
Operator Name: Lynx Energy ULC
License Number: 0206344
License Date: 1997-09-19
License Status: Amended
Spud Date: 1997-09-25
Final Drill Date: 1997-09-26
Well Total Depth: 802.00 m
Surface Hole Latitude: 51.101735
Surface Hole Longitude: -113.027549

For data sources see[1][2]

Well History

Date Event
1997-09-19 Obtained License
1997-09-26 Finished Drilling
1997-09-26 Production Casing Operation Performed
1997-09-26 Rig Released
1997-09-26 Well Mode changed to Drilled and Cased
1997-10-25 Well Log Performed
1999-09-15 Perforation Treatment Performed - Jet Perforation
1999-09-23 Perforation Treatment Performed - Jet Perforation
2003-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-21 Plug Back Performed
2003-05-22 Perforation Treatment Performed - Jet Perforation
2003-06-04 Perforation Treatment Performed - Fractured
2003-06-05 Perforation Treatment Performed - Fractured
2003-06-06 Perforation Treatment Performed - Fractured
2003-12-14 Perforation Treatment Performed - Fractured
2004-01-14 Well Fluid changed to Gas
2004-01-14 Well Mode changed to Testing
2004-01-15 Well Log Performed
2005-11-28 Well Began Production
2005-11-28 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-28 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-15 Perforation 592.50 595.50 7
2003-05-22 Perforation 369.40 371.40 13
2003-05-22 Perforation 348.00 349.00 13
2003-05-22 Perforation 333.40 334.40 13
2003-05-22 Perforation 279.10 280.10 13
2003-05-22 Perforation 272.40 275.40 13
2003-05-22 Perforation 246.40 247.40 13
2003-05-22 Perforation 235.70 237.70 13
2003-05-22 Perforation 230.90 231.90 13
2003-05-22 Perforation 226.60 228.60 13
2003-05-22 Perforation 223.00 224.00 13
1999-09-23 Perforation 486.00 489.00 7
2003-05-22 Perforation 218.50 219.50 13
2003-05-22 Perforation 207.50 208.50 13
2003-05-22 Perforation 185.60 186.60 13
2003-05-22 Perforation 177.10 178.10 13
2003-05-22 Perforation 172.40 173.40 13
2003-06-04 Fracture 333.40 433.20 0
2003-06-05 Fracture 207.50 280.10 0
2003-06-06 Fracture 172.40 186.60 0
2003-12-14 Fracture 172.40 433.20 0
2003-05-21 Packing Device Capped w/Cement 574.00 582.00 0
2003-05-21 Packing Device Capped w/Cement 472.00 480.00 0
2003-05-22 Perforation 432.20 433.20 13
2003-05-22 Perforation 421.50 422.50 13
2003-05-22 Perforation 418.60 419.60 13
2003-05-22 Perforation 414.80 415.80 13
2003-05-22 Perforation 412.50 413.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 744 0.0 0.0 0.0
2006 8617 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 8678 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8740 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8709 0.0 0.0 0.0
2014 8721 0.0 0.0 0.0
2015 8605 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8577 0.0 0.0 0.0
2018 8748 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References