X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254033110003

Well Details

Well ID: 0254033110003
Loading map...
Location: 00/10-31-025-03W4/3
Location Alias: 00/10-31-25-03 W4M
Location Alias 2: 00/10-31-025-03 W4/03
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 03
Section: 31
County/Municipality: Municipal District of Acadia No. 34
Well Name: PAI BINDLOSS 10-31-25-3
Operator Name: Pembina NGL Corporation
License Number: 0219991
License Date: 1998-12-17
License Status: RecCertified
Spud Date: 1999-01-09
Final Drill Date: 1999-01-13
Well Total Depth: 1005.00 m
Surface Hole Latitude: 51.176357
Surface Hole Longitude: -110.406983

For data sources see[1][2]

Well History

Date Event
1998-12-17 Obtained License
1999-01-10 Surface Casing Operation Performed
1999-01-13 Finished Drilling
1999-01-13 Production Casing Operation Performed
1999-01-13 Rig Released
1999-01-13 Well Log Performed
1999-01-13 Well Mode changed to Drilled and Cased
1999-02-03 Perforation Treatment Performed - Jet Perforation
1999-02-03 Well Log Performed
1999-02-06 Perforation Treatment Performed - Fractured
1999-02-07 Perforation Treatment Performed - Jet Perforation
1999-02-07 Well Log Performed
1999-02-08 Perforation Treatment Performed - Fractured
1999-02-11 Perforation Treatment Performed - Jet Perforation
1999-02-13 Perforation Treatment Performed - Fractured
2001-02-06 Well Log Performed
2001-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-09 Perforation Treatment Performed - Jet Perforation
2001-02-09 Plug Back Performed
2001-02-12 Well Began Production
2001-02-12 Well Fluid changed to Gas
2001-02-12 Well Mode changed to Flowing
2003-12-01 Perforation Treatment Performed - Jet Perforation
2003-12-02 Perforation Treatment Performed - Jet Perforation
2003-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-04 Perforation Treatment Performed - Cement Plug
2003-12-04 Perforation Treatment Performed - Cement Squeeze
2003-12-04 Plug Back Performed
2003-12-04 Well Fluid changed to Gas
2003-12-04 Well Mode changed to Abandoned Zone
2003-12-15 Well Abandoned
2003-12-15 Well Fluid changed to Gas
2003-12-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-02-03 Perforation 954.00 956.00 20
2001-02-09 Perforation 875.00 878.00 17
2003-12-01 Perforation 927.00 931.00 14
2003-12-02 Perforation 946.00 950.00 14
2003-12-02 Perforation 954.00 956.00 14
2003-12-04 Cement Squeeze 954.00 956.00 0
2003-12-04 Cement Squeeze 946.00 950.00 0
2003-12-04 Packing Device Capped w/Cement 931.00 946.00 0
2003-12-04 Cement Squeeze 927.00 931.00 0
2003-12-04 Cement Plug 916.00 931.00 0
2003-12-04 Cement Squeeze 875.00 878.00 0
1999-02-06 Fracture 954.00 956.00 0
2003-12-04 Cement Squeeze 871.00 873.00 0
2003-12-04 Cement Plug 405.10 916.00 0
1999-02-07 Perforation 946.00 950.00 14
1999-02-08 Fracture 946.00 950.00 0
1999-02-11 Perforation 927.00 931.00 14
1999-02-13 Fracture 927.00 931.00 0
2001-02-09 Packing Device Capped w/Cement 928.00 936.00 0
2001-02-09 Packing Device Capped w/Cement 912.00 920.00 0
2001-02-09 Perforation 871.00 873.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5603 0.0 0.0 0.0
2002 869 0.0 0.0 0.0

For data sources see[5]

References