If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244272114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.064712,"lon":-113.716971,"icon":""}]} |
Location: 02/14-21-024-27W4/0 | |
Location Alias: 02/14-21-24-27 W4M | |
Location Alias 2: 02/14-21-024-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 21 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 14-21-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0415568 | |
License Date: 2009-12-14 | |
License Status: Issued | |
Spud Date: 2010-01-27 | |
Final Drill Date: 2010-02-04 | |
Well Total Depth: 1115.00 m | |
Surface Hole Latitude: 51.064712 | |
Surface Hole Longitude: -113.716971 |
Date | Event |
---|---|
2009-12-14 | Obtained License |
2010-01-28 | Surface Casing Operation Performed |
2010-02-04 | Finished Drilling |
2010-02-04 | Well Mode changed to Drilled and Cased |
2010-02-05 | Production Casing Operation Performed |
2010-02-05 | Rig Released |
2010-02-09 | Well Log Performed |
2010-02-26 | Perforation Treatment Performed - Jet Perforation |
2010-04-22 | Perforation Treatment Performed - Fractured |
2010-05-18 | Well Began Production |
2010-05-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-05-18 | Well Mode changed to Flowing |
2011-09-08 | Perforation Treatment Performed - Jet Perforation |
2011-09-16 | Perforation Treatment Performed - Fractured |
2012-01-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-03 | Well Mode changed to Suspended |
2012-01-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-26 | Perforation | 451.20 | 451.70 | 13 |
2010-02-26 | Perforation | 491.00 | 493.00 | 13 |
2010-02-26 | Perforation | 334.50 | 336.50 | 13 |
2010-02-26 | Perforation | 297.50 | 298.50 | 13 |
2010-02-26 | Perforation | 673.50 | 676.50 | 13 |
2010-02-26 | Perforation | 584.20 | 584.70 | 13 |
2010-02-26 | Perforation | 711.90 | 712.40 | 13 |
2010-02-26 | Perforation | 708.80 | 709.30 | 13 |
2010-02-26 | Perforation | 693.60 | 695.60 | 13 |
2010-02-26 | Perforation | 724.90 | 725.40 | 13 |
2010-02-26 | Perforation | 717.70 | 718.20 | 13 |
2010-02-26 | Perforation | 448.30 | 449.30 | 13 |
2010-02-26 | Perforation | 714.10 | 715.10 | 13 |
2010-02-26 | Perforation | 648.10 | 648.60 | 13 |
2010-02-26 | Perforation | 609.50 | 610.00 | 13 |
2010-02-26 | Perforation | 600.10 | 600.60 | 13 |
2010-02-26 | Perforation | 594.20 | 594.70 | 13 |
2010-02-26 | Perforation | 621.40 | 622.40 | 13 |
2010-02-26 | Perforation | 640.50 | 641.00 | 13 |
2010-02-26 | Perforation | 638.70 | 639.20 | 13 |
2010-04-22 | Fracture | 513.50 | 516.50 | 0 |
2010-04-22 | Fracture | 491.00 | 493.00 | 0 |
2010-02-26 | Perforation | 410.10 | 410.60 | 13 |
2010-04-22 | Fracture | 612.50 | 615.50 | 0 |
2010-04-22 | Fracture | 297.50 | 725.40 | 0 |
2010-04-22 | Fracture | 673.50 | 676.50 | 0 |
2011-09-08 | Perforation | 269.00 | 271.00 | 13 |
2011-09-08 | Perforation | 289.00 | 291.00 | 13 |
2011-09-08 | Perforation | 329.00 | 331.00 | 13 |
2011-09-08 | Perforation | 830.00 | 832.00 | 13 |
2011-09-08 | Perforation | 845.00 | 847.00 | 13 |
2011-09-08 | Perforation | 986.00 | 988.00 | 13 |
2011-09-16 | Fracture | 269.00 | 988.00 | 0 |
2010-02-26 | Perforation | 577.30 | 577.80 | 13 |
2010-02-26 | Perforation | 468.50 | 469.00 | 13 |
2010-02-26 | Perforation | 462.40 | 462.90 | 13 |
2010-02-26 | Perforation | 384.10 | 384.60 | 13 |
2010-02-26 | Perforation | 612.50 | 615.50 | 13 |
2010-02-26 | Perforation | 513.50 | 516.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 5472 | 0.0 | 0.0 | 0.0 |
2011 | 6551 | 0.0 | 0.0 | 0.0 |
2012 | 4966 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8363 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]