If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0244271116002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.036632,"lon":-113.65858,"icon":""}]} |
| Location: 00/16-11-024-27W4/2 | |
| Location Alias: 00/16-11-24-27 W4M | |
| Location Alias 2: 00/16-11-024-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 024 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 11 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 16-11-24-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0325224 | |
| License Date: 2005-01-27 | |
| License Status: Issued | |
| Spud Date: 2005-03-02 | |
| Final Drill Date: 2006-01-03 | |
| Well Total Depth: 840.00 m | |
| Surface Hole Latitude: 51.036632 | |
| Surface Hole Longitude: -113.658580 |
| Date | Event |
|---|---|
| 2005-01-27 | Obtained License |
| 2005-03-02 | Surface Casing Operation Performed |
| 2006-01-03 | Finished Drilling |
| 2006-01-03 | Well Mode changed to Drilled and Cased |
| 2006-01-04 | Production Casing Operation Performed |
| 2006-01-04 | Rig Released |
| 2006-01-10 | Well Log Performed |
| 2006-02-02 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-20 | Perforation Treatment Performed - Fractured |
| 2010-07-29 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-05 | Perforation Treatment Performed - Fractured |
| 2010-08-20 | Well Began Production |
| 2010-08-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-08-20 | Well Mode changed to Flowing |
| 2010-09-29 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-02-02 | Perforation | 628.00 | 631.00 | 13 |
| 2010-07-29 | Perforation | 599.50 | 602.50 | 13 |
| 2010-07-29 | Perforation | 287.00 | 288.50 | 13 |
| 2010-07-29 | Perforation | 227.50 | 230.00 | 13 |
| 2010-07-29 | Perforation | 282.60 | 283.10 | 13 |
| 2010-07-29 | Perforation | 399.00 | 399.50 | 13 |
| 2010-07-29 | Perforation | 338.40 | 338.90 | 13 |
| 2010-07-29 | Perforation | 290.50 | 291.50 | 13 |
| 2010-07-29 | Perforation | 659.80 | 660.80 | 13 |
| 2010-07-29 | Perforation | 657.70 | 658.70 | 13 |
| 2010-07-29 | Perforation | 618.30 | 618.80 | 13 |
| 2006-02-20 | Fracture | 628.00 | 631.00 | 0 |
| 2010-07-29 | Perforation | 672.40 | 672.90 | 13 |
| 2010-07-29 | Perforation | 718.00 | 718.50 | 13 |
| 2010-07-29 | Perforation | 679.00 | 679.50 | 13 |
| 2010-07-29 | Perforation | 674.80 | 677.30 | 13 |
| 2010-07-29 | Perforation | 550.60 | 551.10 | 13 |
| 2010-07-29 | Perforation | 546.10 | 546.60 | 13 |
| 2010-07-29 | Perforation | 539.80 | 540.30 | 13 |
| 2010-07-29 | Perforation | 569.90 | 570.40 | 13 |
| 2010-07-29 | Perforation | 591.50 | 592.00 | 13 |
| 2010-07-29 | Perforation | 595.30 | 596.30 | 13 |
| 2010-07-29 | Perforation | 418.90 | 419.40 | 13 |
| 2010-07-29 | Perforation | 576.10 | 577.10 | 13 |
| 2010-08-05 | Fracture | 227.50 | 602.50 | 0 |
| 2010-08-05 | Fracture | 282.60 | 718.50 | 0 |
| 2010-07-29 | Perforation | 411.10 | 411.60 | 13 |
| 2010-07-29 | Perforation | 407.50 | 408.00 | 13 |
| 2010-07-29 | Perforation | 481.60 | 482.10 | 13 |
| 2010-07-29 | Perforation | 533.30 | 533.80 | 13 |
| 2010-07-29 | Perforation | 531.40 | 531.90 | 13 |
| 2010-07-29 | Perforation | 528.70 | 529.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 3052 | 0.0 | 0.0 | 0.0 |
| 2011 | 7774 | 0.0 | 0.0 | 0.0 |
| 2012 | 8566 | 0.0 | 0.0 | 0.0 |
| 2013 | 8524 | 0.0 | 0.0 | 0.0 |
| 2014 | 8115 | 0.0 | 0.0 | 0.0 |
| 2015 | 8327 | 0.0 | 0.0 | 0.0 |
| 2016 | 8467 | 0.0 | 0.0 | 0.0 |
| 2017 | 7977 | 0.0 | 0.0 | 0.0 |
| 2018 | 7500 | 0.0 | 0.0 | 0.0 |
| 2019 | 6840 | 0.0 | 0.0 | 0.0 |
| 2020 | 1938 | 0.0 | 0.0 | 0.0 |
For data sources see[5]