X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244270808002

Well Details

Well ID: 0244270808002
Loading map...
Location: 00/08-08-024-27W4/2
Location Alias: 00/08-08-24-27 W4M
Location Alias 2: 00/08-08-024-27 W4/02
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 08
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 8-8-24-27
Operator Name: Ember Resources Inc.
License Number: 0109652
License Date: 1984-10-03
License Status: Amended
Spud Date: 2001-06-20
Final Drill Date: 2001-06-20
Well Total Depth: 2033.00 m
Surface Hole Latitude: 51.030006
Surface Hole Longitude: -113.727093

For data sources see[1][2]

Well History

Date Event
1984-10-03 Obtained License
1988-07-15 Well Abandoned
2001-06-20 Finished Drilling
2001-06-20 Well Mode changed to Drilled and Cased
2001-06-26 Perforation Treatment Performed - Jet Perforation
2001-06-27 Well Log Performed
2001-06-29 Perforation Treatment Performed - Jet Perforation
2001-06-29 Well Log Performed
2001-07-10 Perforation Treatment Performed - Fractured
2001-07-18 Rig Released
2006-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-28 Perforation Treatment Performed - Jet Perforation
2006-03-28 Plug Back Performed
2006-03-28 Well Log Performed
2006-03-28 Well Mode changed to Abandoned Zone
2006-03-29 Perforation Treatment Performed - Remedial Casing
2006-03-31 Perforation Treatment Performed - Jet Perforation
2006-03-31 Well Log Performed
2006-04-01 Perforation Treatment Performed - Remedial Casing
2006-04-03 Perforation Treatment Performed - Jet Perforation
2006-04-03 Well Log Performed
2006-04-05 Perforation Treatment Performed - Remedial Casing
2006-04-05 Well Log Performed
2006-04-08 Perforation Treatment Performed - Jet Perforation
2006-04-08 Well Log Performed
2006-04-09 Perforation Treatment Performed - Remedial Casing
2006-04-12 Well Log Performed
2006-07-01 Perforation Treatment Performed - Jet Perforation
2006-10-14 Perforation Treatment Performed - Jet Perforation
2006-10-14 Well Log Performed
2006-11-02 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-26 Perforation 1690.50 1693.00 17
2006-04-03 Perforation 537.00 538.00 17
2006-04-05 Remedial Casing Cementing 537.00 538.00 0
2006-04-08 Perforation 435.00 436.00 17
2006-04-09 Remedial Casing Cementing 435.00 436.00 0
2006-07-01 Perforation 582.00 584.00 13
2006-10-14 Perforation 743.90 744.40 13
2006-10-14 Perforation 738.50 739.00 13
2006-10-14 Perforation 697.50 698.50 13
2006-10-14 Perforation 696.30 697.30 13
2006-10-14 Perforation 693.40 693.90 13
2001-06-26 Perforation 1686.00 1689.00 17
2006-10-14 Perforation 691.30 692.30 13
2006-10-14 Perforation 677.70 678.70 13
2006-10-14 Perforation 676.80 677.30 13
2006-10-14 Perforation 621.80 622.30 13
2006-10-14 Perforation 621.10 621.60 13
2006-10-14 Perforation 618.30 618.80 13
2006-10-14 Perforation 598.60 599.10 13
2006-10-14 Perforation 585.90 586.40 13
2006-10-14 Perforation 573.30 573.80 13
2006-10-14 Perforation 562.20 562.70 13
2001-06-29 Perforation 1677.00 1679.50 17
2006-10-14 Perforation 557.60 558.10 13
2006-10-14 Perforation 550.70 551.20 13
2006-10-14 Perforation 549.90 550.40 13
2006-10-14 Perforation 538.20 538.70 13
2006-10-14 Perforation 491.30 491.80 13
2006-10-14 Perforation 463.60 464.10 13
2006-10-14 Perforation 445.60 446.10 13
2006-10-14 Perforation 443.80 444.30 13
2006-10-14 Perforation 428.30 428.80 13
2006-10-14 Perforation 422.10 423.10 13
2001-07-10 Fracture 1677.00 1679.50 0
2006-10-14 Perforation 417.10 417.60 13
2006-10-14 Perforation 415.90 416.40 13
2006-10-14 Perforation 378.70 379.20 13
2006-11-02 Fracture 378.70 744.40 0
2006-03-28 Packing Device Capped w/Cement 1657.00 1665.00 0
2006-03-28 Perforation 673.00 674.00 17
2006-03-29 Remedial Casing Cementing 673.00 674.00 0
2006-03-31 Perforation 621.00 622.00 17
2006-04-01 Remedial Casing Cementing 621.00 622.00 0

For data sources see[4]



References