If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244270804002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.029235,"lon":-113.735111,"icon":""}]} |
Location: 00/04-08-024-27W4/2 | |
Location Alias: 00/04-08-24-27 W4M | |
Location Alias 2: 00/04-08-024-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 08 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 4-8-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0426052 | |
License Date: 2010-11-18 | |
License Status: Issued | |
Spud Date: 2011-01-06 | |
Final Drill Date: 2011-01-08 | |
Well Total Depth: 1408.00 m | |
Surface Hole Latitude: 51.029235 | |
Surface Hole Longitude: -113.735111 |
Date | Event |
---|---|
2010-11-18 | Obtained License |
2011-01-06 | Direction Drilling Operation Performed - Deviate |
2011-01-07 | Surface Casing Operation Performed |
2011-01-08 | Finished Drilling |
2011-01-08 | Well Mode changed to Drilled and Cased |
2011-01-10 | Production Casing Operation Performed |
2011-01-10 | Rig Released |
2011-01-16 | Well Log Performed |
2011-02-03 | Perforation Treatment Performed - Jet Perforation |
2011-02-10 | Perforation Treatment Performed - Fractured |
2011-02-20 | Perforation Treatment Performed - Jet Perforation |
2011-03-05 | Perforation Treatment Performed - Fractured |
2011-04-08 | Well Began Production |
2011-04-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-08 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-06 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-03 | Perforation | 754.00 | 756.00 | 13 |
2011-02-20 | Perforation | 765.40 | 765.90 | 13 |
2011-02-20 | Perforation | 798.50 | 799.50 | 13 |
2011-02-20 | Perforation | 796.40 | 796.90 | 13 |
2011-02-20 | Perforation | 777.70 | 778.70 | 13 |
2011-02-20 | Perforation | 577.90 | 579.90 | 13 |
2011-02-20 | Perforation | 382.50 | 383.00 | 13 |
2011-02-20 | Perforation | 367.30 | 367.80 | 13 |
2011-02-20 | Perforation | 332.80 | 333.30 | 13 |
2011-02-20 | Perforation | 389.40 | 390.40 | 13 |
2011-02-20 | Perforation | 547.90 | 549.40 | 13 |
2011-02-03 | Perforation | 838.00 | 840.00 | 13 |
2011-02-20 | Perforation | 546.70 | 547.70 | 13 |
2011-02-20 | Perforation | 402.90 | 403.90 | 13 |
2011-02-20 | Perforation | 808.00 | 810.00 | 13 |
2011-02-20 | Perforation | 973.00 | 974.00 | 13 |
2011-02-20 | Perforation | 968.70 | 969.20 | 13 |
2011-02-20 | Perforation | 888.50 | 890.50 | 13 |
2011-02-20 | Perforation | 1370.50 | 1372.50 | 13 |
2011-02-20 | Perforation | 1067.00 | 1069.00 | 13 |
2011-02-20 | Perforation | 1050.50 | 1052.50 | 13 |
2011-02-20 | Perforation | 881.90 | 882.40 | 13 |
2011-02-03 | Perforation | 850.50 | 852.50 | 13 |
2011-02-20 | Perforation | 899.30 | 901.30 | 13 |
2011-02-20 | Perforation | 802.80 | 804.30 | 13 |
2011-02-20 | Perforation | 879.00 | 881.00 | 13 |
2011-02-20 | Perforation | 905.00 | 908.00 | 13 |
2011-02-20 | Perforation | 958.10 | 958.60 | 13 |
2011-02-20 | Perforation | 904.00 | 904.50 | 13 |
2011-03-05 | Fracture | 332.80 | 974.00 | 0 |
2011-03-05 | Fracture | 808.00 | 1372.50 | 0 |
2011-02-10 | Fracture | 754.00 | 756.00 | 0 |
2011-02-10 | Fracture | 838.00 | 840.00 | 0 |
2011-02-10 | Fracture | 850.50 | 852.50 | 0 |
2011-02-20 | Perforation | 723.20 | 723.70 | 13 |
2011-02-20 | Perforation | 715.40 | 715.90 | 13 |
2011-02-20 | Perforation | 713.40 | 713.90 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6431 | 0.0 | 0.0 | 0.0 |
2012 | 4293 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[6]