If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0244270301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.009293,"lon":-113.683321,"icon":""}]} |
| Location: 00/01-03-024-27W4/0 | |
| Location Alias: 00/01-03-24-27 W4M | |
| Location Alias 2: 00/01-03-024-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 024 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 03 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 1-3-24-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0243384 | |
| License Date: 2000-10-20 | |
| License Status: Issued | |
| Spud Date: 2000-10-30 | |
| Final Drill Date: 2000-10-31 | |
| Well Total Depth: 1123.00 m | |
| Surface Hole Latitude: 51.009293 | |
| Surface Hole Longitude: -113.683321 |
| Date | Event |
|---|---|
| 2000-10-20 | Obtained License |
| 2000-10-30 | Conductor Casing Operation Performed |
| 2000-10-31 | Finished Drilling |
| 2000-11-01 | Production Casing Operation Performed |
| 2000-11-01 | Rig Released |
| 2000-11-01 | Well Mode changed to Drilled and Cased |
| 2000-11-28 | Well Log Performed |
| 2000-12-03 | Perforation Treatment Performed - Jet Perforation |
| 2000-12-13 | Perforation Treatment Performed - Jet Perforation |
| 2001-01-08 | Perforation Treatment Performed - Jet Perforation |
| 2003-11-23 | Well Began Production |
| 2003-11-23 | Well Fluid changed to Gas |
| 2003-11-23 | Well Mode changed to Flowing |
| 2005-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2005-12-12 | Perforation Treatment Performed - Fractured |
| 2005-12-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2005-12-22 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-12-03 | Perforation | 902.00 | 905.00 | 7 |
| 2005-11-08 | Perforation | 687.00 | 687.50 | 13 |
| 2005-11-08 | Perforation | 684.30 | 684.80 | 13 |
| 2005-11-08 | Perforation | 682.70 | 683.20 | 13 |
| 2005-11-08 | Perforation | 667.30 | 667.80 | 13 |
| 2005-11-08 | Perforation | 666.10 | 666.60 | 13 |
| 2005-11-08 | Perforation | 663.80 | 664.30 | 13 |
| 2005-11-08 | Perforation | 633.40 | 633.90 | 13 |
| 2005-11-08 | Perforation | 596.30 | 596.80 | 13 |
| 2005-11-08 | Perforation | 585.60 | 586.10 | 13 |
| 2005-11-08 | Perforation | 584.50 | 585.00 | 13 |
| 2000-12-13 | Perforation | 822.00 | 825.00 | 7 |
| 2005-11-08 | Perforation | 582.80 | 583.30 | 13 |
| 2005-11-08 | Perforation | 578.20 | 578.70 | 13 |
| 2005-11-08 | Perforation | 575.20 | 576.20 | 13 |
| 2005-11-08 | Perforation | 564.10 | 564.60 | 13 |
| 2005-11-08 | Perforation | 558.40 | 558.90 | 13 |
| 2005-11-08 | Perforation | 553.70 | 554.20 | 13 |
| 2005-11-08 | Perforation | 549.20 | 549.70 | 13 |
| 2005-11-08 | Perforation | 542.20 | 542.70 | 13 |
| 2005-11-08 | Perforation | 541.20 | 541.70 | 13 |
| 2005-11-08 | Perforation | 539.90 | 540.40 | 13 |
| 2001-01-08 | Perforation | 610.00 | 616.00 | 7 |
| 2005-11-08 | Perforation | 536.30 | 536.80 | 13 |
| 2005-11-08 | Perforation | 531.20 | 531.70 | 13 |
| 2005-11-08 | Perforation | 528.90 | 529.40 | 13 |
| 2005-11-08 | Perforation | 517.40 | 517.90 | 13 |
| 2005-11-08 | Perforation | 515.40 | 515.90 | 13 |
| 2005-11-08 | Perforation | 492.90 | 493.40 | 13 |
| 2005-11-08 | Perforation | 465.80 | 466.30 | 13 |
| 2005-11-08 | Perforation | 453.90 | 454.40 | 13 |
| 2005-11-08 | Perforation | 440.30 | 440.80 | 13 |
| 2005-11-08 | Perforation | 436.80 | 437.30 | 13 |
| 2005-11-08 | Perforation | 732.20 | 732.70 | 13 |
| 2005-11-08 | Perforation | 431.60 | 432.60 | 13 |
| 2005-11-08 | Perforation | 428.90 | 429.40 | 13 |
| 2005-11-08 | Perforation | 427.90 | 428.40 | 13 |
| 2005-11-08 | Perforation | 422.00 | 422.50 | 13 |
| 2005-11-08 | Perforation | 418.00 | 418.50 | 13 |
| 2005-11-08 | Perforation | 413.40 | 413.90 | 13 |
| 2005-11-08 | Perforation | 403.60 | 404.10 | 13 |
| 2005-11-08 | Perforation | 353.10 | 353.60 | 13 |
| 2005-11-08 | Perforation | 304.50 | 305.00 | 13 |
| 2005-11-08 | Perforation | 294.60 | 295.10 | 13 |
| 2005-11-08 | Perforation | 730.50 | 731.00 | 13 |
| 2005-12-12 | Fracture | 294.60 | 732.70 | 0 |
| 2005-11-08 | Perforation | 728.60 | 729.10 | 13 |
| 2005-11-08 | Perforation | 726.00 | 726.50 | 13 |
| 2005-11-08 | Perforation | 704.70 | 705.20 | 13 |
| 2005-11-08 | Perforation | 692.60 | 693.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 936 | 0.0 | 0.0 | 0.0 |
| 2004 | 8721 | 0.0 | 0.0 | 0.0 |
| 2005 | 8472 | 0.0 | 0.0 | 0.0 |
| 2006 | 7253 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8758 | 0.0 | 0.0 | 0.0 |
| 2012 | 5038 | 0.0 | 0.0 | 0.0 |
| 2013 | 8740 | 0.0 | 0.0 | 0.0 |
| 2014 | 8654 | 0.0 | 0.0 | 0.0 |
| 2015 | 8707 | 0.0 | 0.0 | 0.0 |
| 2016 | 8718 | 0.0 | 0.0 | 0.0 |
| 2017 | 8667 | 0.0 | 0.0 | 0.0 |
| 2018 | 8558 | 0.0 | 0.0 | 0.0 |
| 2019 | 8686 | 0.0 | 0.0 | 0.0 |
| 2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]