If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.077349,"lon":-113.531183,"icon":""}]} |
Location: 00/13-26-024-26W4/0 | |
Location Alias: 00/13-26-24-26 W4M | |
Location Alias 2: 00/13-26-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 13-26-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0433296 | |
License Date: 2011-05-04 | |
License Status: Issued | |
Spud Date: 2012-01-13 | |
Final Drill Date: 2012-01-14 | |
Well Total Depth: 1151.00 m | |
Surface Hole Latitude: 51.077349 | |
Surface Hole Longitude: -113.531183 |
Date | Event |
---|---|
2011-05-04 | Obtained License |
2012-01-13 | Direction Drilling Operation Performed - Deviate |
2012-01-13 | Surface Casing Operation Performed |
2012-01-14 | Finished Drilling |
2012-01-14 | Production Casing Operation Performed |
2012-01-14 | Well Mode changed to Drilled and Cased |
2012-01-15 | Rig Released |
2012-01-24 | Well Log Performed |
2012-02-11 | Perforation Treatment Performed - Jet Perforation |
2012-02-16 | Perforation Treatment Performed - Fractured |
2012-02-25 | Perforation Treatment Performed - Jet Perforation |
2012-02-28 | Perforation Treatment Performed - Fractured |
2012-03-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-01 | Well Mode changed to Testing |
2012-03-14 | Well Began Production |
2012-03-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-13 | Precision Drilling Corporation | 292 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-11 | Perforation | 634.00 | 637.00 | 13 |
2012-02-25 | Perforation | 340.00 | 342.00 | 13 |
2012-02-25 | Perforation | 392.50 | 393.00 | 13 |
2012-02-25 | Perforation | 433.10 | 433.60 | 13 |
2012-02-25 | Perforation | 438.80 | 439.30 | 13 |
2012-02-25 | Perforation | 456.40 | 457.40 | 13 |
2012-02-25 | Perforation | 470.40 | 471.40 | 13 |
2012-02-25 | Perforation | 510.00 | 512.00 | 13 |
2012-02-25 | Perforation | 536.30 | 536.80 | 13 |
2012-02-25 | Perforation | 570.00 | 571.00 | 13 |
2012-02-25 | Perforation | 580.60 | 581.10 | 13 |
2012-02-11 | Perforation | 647.00 | 650.00 | 13 |
2012-02-25 | Perforation | 604.50 | 606.50 | 13 |
2012-02-25 | Perforation | 614.50 | 616.00 | 13 |
2012-02-25 | Perforation | 619.80 | 620.30 | 13 |
2012-02-25 | Perforation | 622.80 | 623.30 | 13 |
2012-02-25 | Perforation | 628.80 | 629.30 | 13 |
2012-02-25 | Perforation | 656.60 | 657.10 | 13 |
2012-02-25 | Perforation | 662.10 | 664.10 | 13 |
2012-02-25 | Perforation | 678.30 | 680.30 | 13 |
2012-02-25 | Perforation | 681.00 | 683.00 | 13 |
2012-02-25 | Perforation | 686.00 | 688.00 | 13 |
2012-02-11 | Perforation | 895.00 | 898.00 | 13 |
2012-02-25 | Perforation | 740.10 | 741.60 | 13 |
2012-02-25 | Perforation | 742.00 | 742.50 | 13 |
2012-02-25 | Perforation | 758.40 | 759.90 | 13 |
2012-02-25 | Perforation | 764.10 | 765.60 | 13 |
2012-02-25 | Perforation | 767.50 | 769.00 | 13 |
2012-02-25 | Perforation | 771.60 | 772.10 | 13 |
2012-02-25 | Perforation | 805.70 | 806.20 | 13 |
2012-02-25 | Perforation | 817.20 | 817.70 | 13 |
2012-02-25 | Perforation | 820.00 | 820.50 | 13 |
2012-02-25 | Perforation | 1099.70 | 1100.20 | 13 |
2012-02-16 | Fracture | 634.00 | 637.00 | 0 |
2012-02-25 | Perforation | 1106.30 | 1106.80 | 13 |
2012-02-25 | Perforation | 1114.90 | 1115.40 | 13 |
2012-02-25 | Perforation | 1118.00 | 1118.50 | 13 |
2012-02-28 | Fracture | 284.00 | 1118.50 | 0 |
2012-02-16 | Fracture | 647.00 | 650.00 | 0 |
2012-02-16 | Fracture | 895.00 | 898.00 | 0 |
2012-02-25 | Perforation | 284.00 | 287.00 | 13 |
2012-02-25 | Perforation | 292.10 | 292.60 | 13 |
2012-02-25 | Perforation | 320.00 | 322.00 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6882 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8612 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[7]