If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244262505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.067977,"lon":-113.515434,"icon":""}]} |
Location: 00/05-25-024-26W4/0 | |
Location Alias: 00/05-25-24-26 W4M | |
Location Alias 2: 00/05-25-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 25 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-25-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0430121 | |
License Date: 2011-01-17 | |
License Status: Issued | |
Spud Date: 2011-02-13 | |
Final Drill Date: 2011-02-14 | |
Well Total Depth: 1147.00 m | |
Surface Hole Latitude: 51.067977 | |
Surface Hole Longitude: -113.515434 |
Date | Event |
---|---|
2011-01-17 | Obtained License |
2011-02-13 | Direction Drilling Operation Performed - Deviate |
2011-02-13 | Surface Casing Operation Performed |
2011-02-14 | Finished Drilling |
2011-02-14 | Production Casing Operation Performed |
2011-02-14 | Rig Released |
2011-02-14 | Well Mode changed to Drilled and Cased |
2011-02-18 | Well Log Performed |
2011-10-30 | Perforation Treatment Performed - Jet Perforation |
2011-11-03 | Perforation Treatment Performed - Fractured |
2011-11-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-06 | Well Mode changed to Testing |
2011-11-13 | Perforation Treatment Performed - Jet Perforation |
2011-11-15 | Perforation Treatment Performed - Fractured |
2011-12-09 | Well Began Production |
2011-12-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-09 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-30 | Perforation | 639.00 | 639.50 | 13 |
2011-11-13 | Perforation | 335.00 | 335.50 | 13 |
2011-11-13 | Perforation | 373.70 | 374.20 | 13 |
2011-11-13 | Perforation | 388.90 | 389.40 | 13 |
2011-11-13 | Perforation | 396.00 | 396.50 | 13 |
2011-11-13 | Perforation | 401.00 | 401.50 | 13 |
2011-11-13 | Perforation | 437.90 | 438.40 | 13 |
2011-11-13 | Perforation | 462.00 | 462.50 | 13 |
2011-11-13 | Perforation | 496.90 | 497.40 | 13 |
2011-11-13 | Perforation | 505.50 | 506.00 | 13 |
2011-11-13 | Perforation | 516.00 | 516.50 | 13 |
2011-10-30 | Perforation | 813.00 | 813.50 | 13 |
2011-11-13 | Perforation | 524.60 | 526.10 | 13 |
2011-11-13 | Perforation | 536.40 | 537.40 | 13 |
2011-11-13 | Perforation | 543.50 | 544.00 | 13 |
2011-11-13 | Perforation | 546.30 | 546.80 | 13 |
2011-11-13 | Perforation | 550.10 | 550.60 | 13 |
2011-11-13 | Perforation | 578.80 | 580.30 | 13 |
2011-11-13 | Perforation | 592.30 | 594.30 | 13 |
2011-11-13 | Perforation | 596.20 | 597.70 | 13 |
2011-11-13 | Perforation | 601.00 | 601.50 | 13 |
2011-11-13 | Perforation | 656.00 | 656.50 | 13 |
2011-10-30 | Perforation | 891.00 | 891.50 | 13 |
2011-11-13 | Perforation | 665.70 | 666.70 | 13 |
2011-11-13 | Perforation | 668.90 | 669.40 | 13 |
2011-11-13 | Perforation | 671.70 | 672.20 | 13 |
2011-11-13 | Perforation | 690.30 | 692.80 | 13 |
2011-11-13 | Perforation | 698.80 | 702.30 | 13 |
2011-11-13 | Perforation | 703.90 | 704.40 | 13 |
2011-11-13 | Perforation | 743.20 | 744.20 | 13 |
2011-11-13 | Perforation | 747.40 | 747.90 | 13 |
2011-11-13 | Perforation | 748.50 | 749.50 | 13 |
2011-11-13 | Perforation | 751.30 | 751.80 | 13 |
2011-10-30 | Perforation | 912.50 | 913.00 | 13 |
2011-11-13 | Perforation | 1076.40 | 1076.90 | 13 |
2011-11-13 | Perforation | 1088.90 | 1089.90 | 13 |
2011-11-13 | Perforation | 1094.40 | 1094.90 | 13 |
2011-11-15 | Fracture | 335.00 | 1094.90 | 0 |
2011-10-30 | Perforation | 1025.00 | 1025.50 | 13 |
2011-11-03 | Fracture | 639.00 | 639.50 | 0 |
2011-11-03 | Fracture | 813.00 | 813.50 | 0 |
2011-11-03 | Fracture | 912.50 | 913.00 | 0 |
2011-11-03 | Fracture | 1025.00 | 1025.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 556 | 0.0 | 0.0 | 0.0 |
2012 | 8531 | 0.0 | 0.0 | 0.0 |
2013 | 8602 | 0.0 | 0.0 | 0.0 |
2014 | 8540 | 0.0 | 0.0 | 0.0 |
2015 | 8611 | 0.0 | 0.0 | 0.0 |
2016 | 8649 | 0.0 | 0.0 | 0.0 |
2017 | 8578 | 0.0 | 0.0 | 0.0 |
2018 | 8588 | 0.0 | 0.0 | 0.0 |
2019 | 8392 | 0.0 | 0.0 | 0.0 |
2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[6]