X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244262502000

Well Details

Well ID: 0244262502000
Loading map...
Location: 00/02-25-024-26W4/0
Location Alias: 00/02-25-24-26 W4M
Location Alias 2: 00/02-25-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 25
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-25-24-26
Operator Name: Ember Resources Inc.
License Number: 0429767
License Date: 2011-01-11
License Status: Issued
Spud Date: 2011-08-28
Final Drill Date: 2011-08-28
Well Total Depth: 991.00 m
Surface Hole Latitude: 51.070843
Surface Hole Longitude: -113.499550

For data sources see[1][2]

Well History

Date Event
2011-01-11 Obtained License
2011-08-28 Direction Drilling Operation Performed - Deviate
2011-08-28 Finished Drilling
2011-08-28 Production Casing Operation Performed
2011-08-28 Surface Casing Operation Performed
2011-08-28 Well Mode changed to Drilled and Cased
2011-08-29 Rig Released
2011-09-05 Well Log Performed
2011-11-05 Perforation Treatment Performed - Jet Perforation
2011-11-13 Perforation Treatment Performed - Fractured
2011-12-12 Well Began Production
2011-12-12 Well Fluid changed to Coalbed Methane-Coals and Other
2011-12-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-28 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-05 Perforation 216.00 219.00 13
2011-11-05 Perforation 431.80 433.30 13
2011-11-05 Perforation 441.10 442.10 13
2011-11-05 Perforation 447.00 447.50 13
2011-11-05 Perforation 447.80 448.30 13
2011-11-05 Perforation 454.20 454.70 13
2011-11-05 Perforation 472.20 472.70 13
2011-11-05 Perforation 475.90 477.40 13
2011-11-05 Perforation 491.00 494.00 13
2011-11-05 Perforation 531.00 534.00 13
2011-11-05 Perforation 536.00 539.00 13
2011-11-05 Perforation 272.00 275.00 13
2011-11-05 Perforation 556.60 557.60 13
2011-11-05 Perforation 561.20 561.70 13
2011-11-05 Perforation 567.00 569.00 13
2011-11-05 Perforation 574.00 575.00 13
2011-11-05 Perforation 577.80 579.30 13
2011-11-05 Perforation 582.40 582.90 13
2011-11-05 Perforation 584.00 585.50 13
2011-11-05 Perforation 587.00 588.00 13
2011-11-05 Perforation 589.40 589.90 13
2011-11-05 Perforation 623.90 624.90 13
2011-11-05 Perforation 298.20 298.70 13
2011-11-05 Perforation 627.90 628.40 13
2011-11-05 Perforation 632.10 632.60 13
2011-11-05 Perforation 633.00 633.50 13
2011-11-05 Perforation 634.70 635.20 13
2011-11-05 Perforation 637.60 638.10 13
2011-11-05 Perforation 645.40 645.90 13
2011-11-05 Perforation 922.20 922.70 13
2011-11-05 Perforation 929.60 930.10 13
2011-11-13 Fracture 216.00 930.10 0
2011-11-05 Perforation 313.10 313.60 13
2011-11-05 Perforation 321.50 322.00 13
2011-11-05 Perforation 326.00 327.00 13
2011-11-05 Perforation 365.50 366.00 13
2011-11-05 Perforation 371.00 374.00 13
2011-11-05 Perforation 425.00 425.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 480 0.0 0.0 0.0
2012 8317 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 8540 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8611 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 8315 0.0 0.0 0.0
2019 8392 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[6]

References