If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244261904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.054558,"lon":-113.631875,"icon":""}]} |
Location: 00/04-19-024-26W4/0 | |
Location Alias: 00/04-19-24-26 W4M | |
Location Alias 2: 00/04-19-024-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 26 | |
Section: 19 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 4-19-24-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0236173 | |
License Date: 2000-04-13 | |
License Status: Issued | |
Spud Date: 2000-06-06 | |
Final Drill Date: 2000-06-22 | |
Well Total Depth: 1111.00 m | |
Surface Hole Latitude: 51.054558 | |
Surface Hole Longitude: -113.631875 |
Date | Event |
---|---|
2000-04-13 | Obtained License |
2000-06-06 | Surface Casing Operation Performed |
2000-06-22 | Finished Drilling |
2000-06-22 | Production Casing Operation Performed |
2000-06-22 | Rig Released |
2000-06-22 | Well Log Performed |
2000-06-22 | Well Mode changed to Drilled and Cased |
2000-07-04 | Well Log Performed |
2000-07-22 | Perforation Treatment Performed - Jet Perforation |
2000-08-21 | Perforation Treatment Performed - Fractured |
2000-08-28 | Perforation Treatment Performed - Jet Perforation |
2000-09-05 | Perforation Treatment Performed - Jet Perforation |
2000-11-09 | Well Began Production |
2000-11-09 | Well Fluid changed to Gas |
2000-11-09 | Well Mode changed to Flowing |
2001-07-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-07 | Perforation Treatment Performed - Jet Perforation |
2001-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-08 | Plug Back Performed |
2001-07-08 | Well Fluid changed to Gas |
2001-07-08 | Well Mode changed to Abandoned Zone |
2001-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-11 | Perforation Treatment Performed - Jet Perforation |
2001-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-18 | Perforation Treatment Performed - Jet Perforation |
2001-08-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-08-10 | Perforation Treatment Performed - Jet Perforation |
2001-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-08-25 | Perforation Treatment Performed - Jet Perforation |
2001-08-26 | Well Fluid changed to Gas |
2001-08-26 | Well Mode changed to Flowing |
2006-09-25 | Perforation Treatment Performed - Jet Perforation |
2006-09-26 | Perforation Treatment Performed - Jet Perforation |
2006-10-07 | Perforation Treatment Performed - Jet Perforation |
2006-10-15 | Perforation Treatment Performed - Fractured |
2006-10-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-10-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-22 | Perforation | 1007.00 | 1010.00 | 7 |
2001-07-09 | Packing Device Capped w/Cement | 772.00 | 780.00 | 0 |
2001-07-11 | Perforation | 614.00 | 616.00 | 7 |
2001-07-18 | Packing Device Capped w/Cement | 601.00 | 609.00 | 0 |
2001-07-18 | Perforation | 588.00 | 590.00 | 7 |
2001-08-05 | Packing Device Capped w/Cement | 577.00 | 585.00 | 0 |
2001-08-10 | Perforation | 560.00 | 562.00 | 7 |
2001-08-21 | Packing Device Capped w/Cement | 550.00 | 558.00 | 0 |
2001-08-25 | Perforation | 540.00 | 542.00 | 7 |
2001-08-25 | Perforation | 544.00 | 545.00 | 7 |
2001-08-25 | Perforation | 546.00 | 548.00 | 7 |
2000-07-22 | Perforation | 1003.00 | 1006.00 | 7 |
2006-09-25 | Perforation | 560.00 | 562.00 | 7 |
2006-09-26 | Perforation | 588.00 | 590.00 | 7 |
2006-09-26 | Perforation | 614.00 | 616.00 | 7 |
2006-10-07 | Perforation | 707.80 | 708.30 | 13 |
2006-10-07 | Perforation | 703.20 | 703.70 | 13 |
2006-10-07 | Perforation | 700.70 | 701.20 | 13 |
2006-10-07 | Perforation | 678.70 | 679.20 | 13 |
2006-10-07 | Perforation | 666.00 | 666.50 | 13 |
2006-10-07 | Perforation | 658.90 | 659.40 | 13 |
2006-10-07 | Perforation | 655.30 | 656.30 | 13 |
2000-08-21 | Fracture | 1003.00 | 1010.00 | 0 |
2006-10-07 | Perforation | 653.80 | 654.30 | 13 |
2006-10-07 | Perforation | 651.10 | 651.60 | 13 |
2006-10-07 | Perforation | 638.90 | 640.90 | 13 |
2006-10-07 | Perforation | 608.00 | 608.50 | 13 |
2006-10-07 | Perforation | 584.10 | 585.10 | 13 |
2006-10-07 | Perforation | 581.30 | 582.30 | 13 |
2006-10-07 | Perforation | 577.80 | 578.30 | 13 |
2006-10-07 | Perforation | 569.10 | 569.60 | 13 |
2006-10-07 | Perforation | 567.00 | 567.50 | 13 |
2006-10-07 | Perforation | 554.70 | 555.20 | 13 |
2000-08-28 | Perforation | 939.00 | 942.00 | 7 |
2006-10-07 | Perforation | 550.80 | 551.80 | 13 |
2006-10-07 | Perforation | 535.80 | 536.30 | 13 |
2006-10-07 | Perforation | 529.60 | 530.10 | 13 |
2006-10-07 | Perforation | 528.40 | 528.90 | 13 |
2006-10-07 | Perforation | 524.00 | 525.00 | 13 |
2006-10-07 | Perforation | 518.80 | 519.30 | 13 |
2006-10-07 | Perforation | 494.80 | 495.30 | 13 |
2006-10-07 | Perforation | 411.90 | 412.40 | 13 |
2006-10-07 | Perforation | 410.80 | 411.30 | 13 |
2006-10-07 | Perforation | 406.20 | 406.70 | 13 |
2000-09-05 | Perforation | 788.00 | 791.00 | 7 |
2006-10-07 | Perforation | 400.80 | 401.30 | 13 |
2006-10-07 | Perforation | 393.50 | 394.00 | 13 |
2006-10-07 | Perforation | 289.30 | 290.30 | 13 |
2006-10-07 | Perforation | 282.40 | 283.40 | 13 |
2006-10-07 | Perforation | 270.00 | 270.50 | 13 |
2006-10-07 | Perforation | 268.30 | 268.80 | 13 |
2006-10-15 | Fracture | 268.30 | 708.30 | 0 |
2001-07-07 | Perforation | 1007.00 | 1010.00 | 7 |
2001-07-07 | Perforation | 1003.00 | 1006.00 | 7 |
2001-07-07 | Packing Device Capped w/Cement | 984.00 | 992.00 | 0 |
2001-07-08 | Packing Device Capped w/Cement | 922.00 | 930.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1272 | 0.0 | 0.0 | 0.0 |
2001 | 8679 | 0.0 | 0.0 | 0.0 |
2002 | 8756 | 0.0 | 0.0 | 0.0 |
2003 | 8672 | 0.0 | 0.0 | 0.0 |
2004 | 8721 | 0.0 | 0.0 | 0.0 |
2005 | 8472 | 0.0 | 0.0 | 0.0 |
2006 | 8706 | 0.0 | 0.0 | 0.0 |
2007 | 8587 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 8693 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8328 | 0.0 | 0.0 | 0.0 |
2015 | 8720 | 0.0 | 0.0 | 0.0 |
2016 | 8627 | 0.0 | 0.0 | 0.0 |
2017 | 8539 | 0.0 | 0.0 | 0.0 |
2018 | 8504 | 0.0 | 0.0 | 0.0 |
2019 | 8542 | 0.0 | 0.0 | 0.0 |
2020 | 2078 | 0.0 | 0.0 | 0.0 |
For data sources see[5]