X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244260702000

Well Details

Well ID: 0244260702000
Loading map...
Location: 00/02-07-024-26W4/0
Location Alias: 00/02-07-24-26 W4M
Location Alias 2: 00/02-07-024-26 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 26
Section: 07
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-7-24-26
Operator Name: Ember Resources Inc.
License Number: 0415340
License Date: 2009-12-08
License Status: Issued
Spud Date: 2010-02-16
Final Drill Date: 2010-02-18
Well Total Depth: 1281.00 m
Surface Hole Latitude: 51.029922
Surface Hole Longitude: -113.622880

For data sources see[1][2]

Well History

Date Event
2009-12-08 Obtained License
2010-02-16 Surface Casing Operation Performed
2010-02-17 Direction Drilling Operation Performed - Deviate
2010-02-18 Finished Drilling
2010-02-18 Production Casing Operation Performed
2010-02-18 Rig Released
2010-02-18 Well Mode changed to Drilled and Cased
2010-02-25 Well Log Performed
2010-04-11 Perforation Treatment Performed - Jet Perforation
2010-09-15 Well Began Production
2010-09-15 Well Fluid changed to Gas
2010-09-15 Well Mode changed to Flowing
2010-10-12 Perforation Treatment Performed - Fractured
2010-11-01 Perforation Treatment Performed - Jet Perforation
2010-11-10 Perforation Treatment Performed - Fractured
2010-11-19 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-19 Well Mode changed to Flowing
2010-12-17 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-17 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-11 Perforation 1166.50 1168.50 13
2010-11-01 Perforation 665.00 665.50 13
2010-11-01 Perforation 660.40 660.90 13
2010-11-01 Perforation 651.20 651.70 13
2010-11-01 Perforation 485.20 485.70 13
2010-11-01 Perforation 717.50 719.50 13
2010-11-01 Perforation 298.00 301.00 13
2010-11-01 Perforation 268.50 270.50 13
2010-11-01 Perforation 474.70 475.20 13
2010-11-01 Perforation 347.50 348.00 13
2010-11-01 Perforation 337.30 337.80 13
2010-04-11 Perforation 948.50 950.50 13
2010-11-01 Perforation 808.90 809.90 13
2010-11-01 Perforation 803.40 805.40 13
2010-11-01 Perforation 800.20 801.20 13
2010-11-01 Perforation 861.50 862.00 13
2010-11-01 Perforation 858.00 858.50 13
2010-11-01 Perforation 815.00 815.50 13
2010-11-01 Perforation 785.40 786.40 13
2010-11-01 Perforation 677.80 678.30 13
2010-11-01 Perforation 690.40 692.40 13
2010-11-01 Perforation 684.10 684.60 13
2010-04-11 Perforation 749.50 752.50 13
2010-11-01 Perforation 781.90 782.90 13
2010-11-01 Perforation 713.60 714.60 13
2010-11-01 Perforation 706.20 707.20 13
2010-11-10 Fracture 268.50 719.50 0
2010-11-10 Fracture 337.30 862.00 0
2010-10-12 Fracture 749.50 752.50 0
2010-10-12 Fracture 948.50 950.50 0
2010-10-12 Fracture 1166.50 1168.50 0
2010-11-01 Perforation 638.90 639.40 13
2010-11-01 Perforation 502.00 502.50 13
2010-11-01 Perforation 490.60 491.10 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2160 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 8760 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8710 0.0 0.0 0.0
2015 8678 0.0 0.0 0.0
2016 8654 0.0 0.0 0.0
2017 8658 0.0 0.0 0.0
2018 8514 0.0 0.0 0.0
2019 8690 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

References