If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244251212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.024099,"lon":-113.369181,"icon":""}]} |
Location: 00/12-12-024-25W4/0 | |
Location Alias: 00/12-12-24-25 W4M | |
Location Alias 2: 00/12-12-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 12 | |
County/Municipality: Strathmore | |
Well Name: EMBER ENTICE 12-12-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0413644 | |
License Date: 2009-11-03 | |
License Status: Issued | |
Spud Date: 2010-01-24 | |
Final Drill Date: 2010-01-25 | |
Well Total Depth: 1283.00 m | |
Surface Hole Latitude: 51.024099 | |
Surface Hole Longitude: -113.369181 |
Date | Event |
---|---|
2009-11-03 | Obtained License |
2010-01-24 | Direction Drilling Operation Performed - Deviate |
2010-01-24 | Surface Casing Operation Performed |
2010-01-25 | Finished Drilling |
2010-01-25 | Well Mode changed to Drilled and Cased |
2010-01-26 | Production Casing Operation Performed |
2010-01-26 | Rig Released |
2010-01-31 | Well Log Performed |
2011-03-08 | Well Log Performed |
2011-11-03 | Perforation Treatment Performed - Jet Perforation |
2011-11-07 | Perforation Treatment Performed - Fractured |
2011-11-25 | Perforation Treatment Performed - Jet Perforation |
2011-12-03 | Perforation Treatment Performed - Fractured |
2011-12-13 | Well Began Production |
2011-12-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-12-13 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-03 | Perforation | 433.50 | 435.50 | 13 |
2011-11-25 | Perforation | 372.80 | 373.30 | 13 |
2011-11-25 | Perforation | 386.40 | 387.40 | 13 |
2011-11-25 | Perforation | 390.50 | 392.50 | 13 |
2011-11-25 | Perforation | 404.60 | 405.60 | 13 |
2011-11-25 | Perforation | 451.70 | 452.20 | 13 |
2011-11-25 | Perforation | 454.90 | 455.40 | 13 |
2011-11-25 | Perforation | 504.50 | 506.50 | 13 |
2011-11-25 | Perforation | 550.60 | 551.10 | 13 |
2011-11-25 | Perforation | 554.90 | 555.90 | 13 |
2011-11-25 | Perforation | 568.20 | 569.20 | 13 |
2011-11-03 | Perforation | 1115.50 | 1117.50 | 13 |
2011-11-25 | Perforation | 575.40 | 577.40 | 13 |
2011-11-25 | Perforation | 578.50 | 579.50 | 13 |
2011-11-25 | Perforation | 582.40 | 583.40 | 13 |
2011-11-25 | Perforation | 598.60 | 599.10 | 13 |
2011-11-25 | Perforation | 606.60 | 607.60 | 13 |
2011-11-25 | Perforation | 610.60 | 613.60 | 13 |
2011-11-25 | Perforation | 625.90 | 628.90 | 13 |
2011-11-25 | Perforation | 676.50 | 678.50 | 13 |
2011-11-25 | Perforation | 701.40 | 702.40 | 13 |
2011-11-25 | Perforation | 710.70 | 711.20 | 13 |
2011-11-03 | Perforation | 1239.00 | 1241.00 | 13 |
2011-11-25 | Perforation | 724.60 | 725.10 | 13 |
2011-11-25 | Perforation | 730.30 | 731.30 | 13 |
2011-11-25 | Perforation | 742.80 | 743.30 | 13 |
2011-11-25 | Perforation | 747.30 | 749.30 | 13 |
2011-11-25 | Perforation | 753.90 | 754.90 | 13 |
2011-11-25 | Perforation | 755.60 | 756.10 | 13 |
2011-11-25 | Perforation | 882.50 | 885.50 | 13 |
2011-11-25 | Perforation | 1225.50 | 1227.00 | 13 |
2011-12-03 | Fracture | 349.80 | 1227.00 | 0 |
2011-11-03 | Perforation | 1250.00 | 1252.00 | 13 |
2011-11-07 | Fracture | 1115.50 | 1117.50 | 0 |
2011-11-07 | Fracture | 1239.00 | 1241.00 | 0 |
2011-11-07 | Fracture | 1250.00 | 1252.00 | 0 |
2011-11-25 | Perforation | 349.80 | 350.30 | 13 |
2011-11-25 | Perforation | 369.20 | 369.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 456 | 0.0 | 0.0 | 0.0 |
2012 | 8609 | 0.0 | 0.0 | 0.0 |
2013 | 8594 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8699 | 0.0 | 0.0 | 0.0 |
2018 | 8601 | 0.0 | 0.0 | 0.0 |
2019 | 8433 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[6]