X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244250801000

Well Details

Well ID: 0244250801000
Loading map...
Location: 00/01-08-024-25W4/0
Location Alias: 00/01-08-24-25 W4M
Location Alias 2: 00/01-08-024-25 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 25
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 1-8-24-25
Operator Name: Ember Resources Inc.
License Number: 0387109
License Date: 2007-12-06
License Status: Issued
Spud Date: 2007-12-13
Final Drill Date: 2007-12-16
Well Total Depth: 2106.00 m
Surface Hole Latitude: 51.031067
Surface Hole Longitude: -113.440236

For data sources see[1][2]

Well History

Date Event
2007-12-06 Obtained License
2007-12-13 Direction Drilling Operation Performed - Deviate
2007-12-13 Surface Casing Operation Performed
2007-12-16 Finished Drilling
2007-12-16 Well Mode changed to Drilled and Cased
2007-12-17 Production Casing Operation Performed
2007-12-17 Rig Released
2007-12-17 Well Log Performed
2008-01-18 Perforation Treatment Performed - Jet Perforation
2008-01-18 Well Log Performed
2008-02-02 Perforation Treatment Performed - Jet Perforation
2008-02-02 Well Log Performed
2008-03-06 Perforation Treatment Performed - Fractured
2008-03-25 Well Log Performed
2008-05-11 Well Log Performed
2008-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-26 Plug Back Performed
2008-06-26 Well Mode changed to Abandoned Zone
2008-06-27 Perforation Treatment Performed - Jet Perforation
2008-07-09 Perforation Treatment Performed - Fractured
2009-02-04 Well Log Performed
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-14 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-12-13 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-18 Perforation 2051.00 2054.00 20
2009-02-05 Perforation 767.50 768.00 14
2009-02-05 Perforation 717.00 718.00 14
2009-02-05 Perforation 712.90 713.40 14
2009-02-05 Perforation 678.00 679.00 14
2009-02-05 Perforation 615.60 616.60 14
2009-02-05 Perforation 611.90 613.90 14
2009-02-05 Perforation 598.20 600.20 14
2009-02-05 Perforation 593.10 593.60 14
2009-02-05 Perforation 587.60 588.10 14
2009-02-05 Perforation 570.90 571.40 14
2008-02-02 Perforation 2052.50 2057.00 20
2009-02-05 Perforation 565.80 566.30 14
2009-02-05 Perforation 563.00 564.00 14
2009-02-05 Perforation 558.60 559.10 14
2009-02-05 Perforation 543.00 543.50 14
2009-02-05 Perforation 404.20 405.20 14
2009-02-05 Perforation 395.20 395.70 14
2009-02-05 Perforation 392.00 392.50 14
2009-02-14 Fracture 392.00 771.10 0
2008-02-02 Perforation 2048.00 2052.50 20
2008-03-06 Fracture 2048.00 2057.00 0
2008-06-26 Packing Device Capped w/Cement 2030.00 2038.00 0
2008-06-27 Perforation 1142.00 1145.00 13
2008-06-27 Perforation 1138.00 1141.00 13
2008-07-09 Fracture 1138.00 1145.00 0
2009-02-05 Perforation 770.60 771.10 14

For data sources see[5]



References