If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244250410020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.018618,"lon":-113.43143,"icon":""}]} |
Location: 02/10-04-024-25W4/0 | |
Location Alias: 02/10-04-24-25 W4M | |
Location Alias 2: 02/10-04-024-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 25 | |
Section: 04 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 10-4-24-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423454 | |
License Date: 2010-09-13 | |
License Status: Issued | |
Spud Date: 2010-12-01 | |
Final Drill Date: 2010-12-09 | |
Well Total Depth: 740.00 m | |
Surface Hole Latitude: 51.018618 | |
Surface Hole Longitude: -113.431430 |
Date | Event |
---|---|
2010-09-13 | Obtained License |
2010-12-01 | Surface Casing Operation Performed |
2010-12-09 | Finished Drilling |
2010-12-09 | Well Mode changed to Drilled and Cased |
2010-12-10 | Production Casing Operation Performed |
2010-12-10 | Rig Released |
2010-12-14 | Well Log Performed |
2011-01-12 | Perforation Treatment Performed - Jet Perforation |
2011-01-23 | Perforation Treatment Performed - Fractured |
2011-02-11 | Well Began Production |
2011-02-11 | Well Fluid changed to Coalbed Methane-Coals Only |
2011-02-11 | Well Mode changed to Flowing |
2017-03-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-12 | Perforation | 612.30 | 612.80 | 13 |
2011-01-12 | Perforation | 532.50 | 533.50 | 13 |
2011-01-12 | Perforation | 475.70 | 476.70 | 13 |
2011-01-12 | Perforation | 473.50 | 475.00 | 13 |
2011-01-12 | Perforation | 463.80 | 465.80 | 13 |
2011-01-12 | Perforation | 458.70 | 459.70 | 13 |
2011-01-12 | Perforation | 456.10 | 456.60 | 13 |
2011-01-12 | Perforation | 442.70 | 443.20 | 13 |
2011-01-12 | Perforation | 439.10 | 439.60 | 13 |
2011-01-12 | Perforation | 433.80 | 434.30 | 13 |
2011-01-12 | Perforation | 427.10 | 428.10 | 13 |
2011-01-12 | Perforation | 607.80 | 608.30 | 13 |
2011-01-12 | Perforation | 411.90 | 412.40 | 13 |
2011-01-12 | Perforation | 409.20 | 409.70 | 13 |
2011-01-12 | Perforation | 359.50 | 360.00 | 13 |
2011-01-12 | Perforation | 314.20 | 314.70 | 13 |
2011-01-12 | Perforation | 308.70 | 309.20 | 13 |
2011-01-12 | Perforation | 294.80 | 295.30 | 13 |
2011-01-23 | Fracture | 294.80 | 612.80 | 0 |
2017-03-02 | Fracture | 294.80 | 295.30 | 0 |
2017-03-02 | Fracture | 308.70 | 309.20 | 0 |
2017-03-02 | Fracture | 314.20 | 314.70 | 0 |
2011-01-12 | Perforation | 605.40 | 605.90 | 13 |
2017-03-02 | Fracture | 359.50 | 360.00 | 0 |
2017-03-02 | Fracture | 409.20 | 409.70 | 0 |
2017-03-02 | Fracture | 411.90 | 412.40 | 0 |
2017-03-02 | Fracture | 427.10 | 428.10 | 0 |
2017-03-02 | Fracture | 433.80 | 434.30 | 0 |
2017-03-02 | Fracture | 439.10 | 439.60 | 0 |
2017-03-02 | Fracture | 442.70 | 443.20 | 0 |
2017-03-02 | Fracture | 456.10 | 456.60 | 0 |
2017-03-02 | Fracture | 458.70 | 459.70 | 0 |
2017-03-02 | Fracture | 463.80 | 465.80 | 0 |
2011-01-12 | Perforation | 603.30 | 603.80 | 13 |
2017-03-02 | Fracture | 473.50 | 475.00 | 0 |
2017-03-02 | Fracture | 475.70 | 476.70 | 0 |
2017-03-02 | Fracture | 532.50 | 533.50 | 0 |
2017-03-02 | Fracture | 538.80 | 539.30 | 0 |
2017-03-02 | Fracture | 548.30 | 549.30 | 0 |
2017-03-02 | Fracture | 560.40 | 561.40 | 0 |
2017-03-02 | Fracture | 562.60 | 565.60 | 0 |
2017-03-02 | Fracture | 566.50 | 567.00 | 0 |
2017-03-02 | Fracture | 603.30 | 603.80 | 0 |
2017-03-02 | Fracture | 605.40 | 605.90 | 0 |
2011-01-12 | Perforation | 566.50 | 567.00 | 13 |
2017-03-02 | Fracture | 607.80 | 608.30 | 0 |
2017-03-02 | Fracture | 612.30 | 612.80 | 0 |
2011-01-12 | Perforation | 562.60 | 565.60 | 13 |
2011-01-12 | Perforation | 560.40 | 561.40 | 13 |
2011-01-12 | Perforation | 548.30 | 549.30 | 13 |
2011-01-12 | Perforation | 538.80 | 539.30 | 13 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-03-02 | 2017-03-02 | 0 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7223 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8593 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8684 | 0.0 | 0.0 | 0.0 |
2016 | 5802 | 0.0 | 0.0 | 0.0 |
2017 | 8101 | 0.0 | 0.0 | 0.0 |
2018 | 8606 | 0.0 | 0.0 | 0.0 |
2019 | 8569 | 0.0 | 0.0 | 0.0 |
2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]