X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244240615000

Well Details

Well ID: 0244240615000
Loading map...
Location: 00/15-06-024-24W4/0
Location Alias: 00/15-06-24-24 W4M
Location Alias 2: 00/15-06-024-24 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 24
Section: 06
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 15-6-24-24
Operator Name: Ember Resources Inc.
License Number: 0421382
License Date: 2010-06-24
License Status: Issued
Spud Date: 2010-12-01
Final Drill Date: 2010-12-06
Well Total Depth: 883.00 m
Surface Hole Latitude: 51.021545
Surface Hole Longitude: -113.340572

For data sources see[1][2]

Well History

Date Event
2010-06-24 Obtained License
2010-12-01 Lost Circulation Occurred
2010-12-01 Surface Casing Operation Performed
2010-12-06 Finished Drilling
2010-12-06 Well Mode changed to Drilled and Cased
2010-12-07 Production Casing Operation Performed
2010-12-07 Rig Released
2010-12-10 Well Log Performed
2010-12-17 Perforation Treatment Performed - Jet Perforation
2011-01-11 Perforation Treatment Performed - Fractured
2011-01-14 Well Fluid changed to Gas
2011-01-14 Well Mode changed to Testing
2011-01-28 Perforation Treatment Performed - Jet Perforation
2011-02-06 Perforation Treatment Performed - Fractured
2011-02-12 Well Began Production
2011-02-12 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-17 Perforation 740.00 742.00 13
2011-01-28 Perforation 365.60 366.60 13
2011-01-28 Perforation 364.40 364.90 13
2011-01-28 Perforation 362.70 363.20 13
2011-01-28 Perforation 256.40 256.90 13
2011-01-28 Perforation 226.90 227.40 13
2011-01-28 Perforation 245.00 246.50 13
2011-01-28 Perforation 179.00 181.00 13
2011-01-28 Perforation 250.90 251.90 13
2011-01-28 Perforation 240.40 240.90 13
2011-01-28 Perforation 236.70 237.20 13
2010-12-17 Perforation 602.00 604.00 13
2011-01-28 Perforation 373.10 373.60 13
2011-01-28 Perforation 478.70 479.70 13
2011-01-28 Perforation 463.00 464.00 13
2011-01-28 Perforation 413.00 416.00 13
2011-01-28 Perforation 500.10 501.10 13
2011-01-28 Perforation 494.60 495.60 13
2011-01-28 Perforation 483.60 484.10 13
2011-01-28 Perforation 403.00 403.50 13
2011-01-28 Perforation 391.00 391.50 13
2011-01-28 Perforation 375.70 376.20 13
2010-12-17 Perforation 418.00 420.00 13
2011-01-28 Perforation 374.20 374.70 13
2011-01-28 Perforation 399.80 400.30 13
2011-01-28 Perforation 401.10 401.60 13
2011-01-28 Perforation 394.70 395.20 13
2011-01-28 Perforation 622.50 624.00 13
2011-02-06 Fracture 179.00 246.50 0
2011-02-06 Fracture 226.90 501.10 0
2011-01-11 Fracture 740.00 742.00 0
2011-01-11 Fracture 602.00 604.00 0
2011-01-11 Fracture 418.00 420.00 0
2011-01-28 Perforation 359.50 360.00 13
2011-01-28 Perforation 337.10 338.10 13
2011-01-28 Perforation 309.10 309.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7749 0.0 0.0 0.0
2012 8609 0.0 0.0 0.0
2013 8594 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 8601 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-12-01 Lost Circulation 10.00 15.00

For data sources see[6]

References