If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244222316004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.066416,"lon":-112.959396,"icon":""}]} |
Location: 00/16-23-024-22W4/4 | |
Location Alias: 00/16-23-24-22 W4M | |
Location Alias 2: 00/16-23-024-22 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 22 | |
Section: 23 | |
County/Municipality: Wheatland County | |
Well Name: PCP HUSSAR 16-23-24-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0087686 | |
License Date: 1980-12-16 | |
License Status: Issued | |
Spud Date: 1981-01-03 | |
Final Drill Date: 1981-01-10 | |
Well Total Depth: 1521.00 m | |
Surface Hole Latitude: 51.066416 | |
Surface Hole Longitude: -112.959396 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-12-16 | Obtained License |
1981-01-10 | Finished Drilling |
1981-01-10 | Well Mode changed to Drilled and Cased |
1981-01-12 | Drill Stem Test Performed |
1981-01-13 | Production Casing Operation Performed |
1981-04-30 | Perforation Treatment Performed - Jet Perforation |
1981-05-04 | Perforation Treatment Performed - Fractured |
1996-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-20 | Well Log Performed |
1996-10-26 | Perforation Treatment Performed - Jet Perforation |
1996-11-03 | Perforation Treatment Performed - Fractured |
2003-01-14 | Perforation Treatment Performed - Jet Perforation |
2003-02-12 | Perforation Treatment Performed - Fractured |
2006-01-24 | Perforation Treatment Performed - Jet Perforation |
2006-01-24 | Well Log Performed |
2006-02-09 | Perforation Treatment Performed - Fractured |
2006-03-01 | Well Began Production |
2006-03-01 | Well Fluid changed to Gas |
2006-03-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-04-30 | Perforation | 1435.50 | 1437.50 | 7 |
2006-02-09 | Fracture | 851.00 | 856.00 | 0 |
1981-04-30 | Perforation | 1440.50 | 1442.50 | 7 |
1981-05-04 | Fracture | 1435.50 | 1442.50 | 0 |
1996-10-17 | Packing Device Capped w/Cement | 1416.00 | 1424.00 | 0 |
1996-10-26 | Perforation | 589.50 | 595.50 | 13 |
1996-11-03 | Fracture | 589.50 | 595.50 | 0 |
2003-01-14 | Perforation | 227.00 | 233.00 | 13 |
2003-02-12 | Fracture | 227.00 | 233.00 | 0 |
2006-01-24 | Perforation | 851.00 | 856.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7265 | 0.0 | 0.0 | 0.0 |
2007 | 8641 | 0.0 | 0.0 | 0.0 |
2008 | 8481 | 0.0 | 0.0 | 0.0 |
2009 | 6512 | 0.0 | 0.0 | 0.0 |
2010 | 6635 | 0.0 | 0.0 | 0.0 |
2011 | 2372 | 0.0 | 0.0 | 0.0 |
2012 | 2745 | 0.0 | 0.0 | 0.0 |
2013 | 4824 | 0.0 | 0.0 | 0.0 |
2014 | 3359 | 0.0 | 0.0 | 0.0 |
2015 | 4645 | 0.0 | 0.0 | 0.0 |
2016 | 8329 | 0.0 | 0.0 | 0.0 |
2017 | 8637 | 0.0 | 0.0 | 0.0 |
2018 | 8752 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]