X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244212103000

Well Details

Well ID: 0244212103000
Loading map...
Location: 00/03-21-024-21W4/0
Location Alias: 00/03-21-24-21 W4M
Location Alias 2: 00/03-21-024-21 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 21
Section: 21
County/Municipality: Wheatland County
Well Name: APEL HZ HUSSAR 3-21-24-21
Operator Name: TimberRock Energy Corp.
License Number: 0423475
License Date: 2010-09-14
License Status: Suspension
Spud Date: 2010-11-07
Final Drill Date: 2010-11-23
Well Total Depth: 2791.00 m
Surface Hole Latitude: 51.066389
Surface Hole Longitude: -112.884933

For data sources see[1][2]

Well History

Date Event
2010-09-14 Obtained License
2010-11-08 Surface Casing Operation Performed
2010-11-10 Direction Drilling Operation Performed - Horizontal
2010-11-14 Intermediate Casing Operation Performed
2010-11-23 Finished Drilling
2010-11-23 Well Mode changed to Drilled and Cased
2010-11-25 Well Log Performed
2010-11-28 Liner Casing Operation Performed
2010-11-29 Rig Released
2010-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-05 Perforation Treatment Performed - Open-Hole Completion
2011-02-02 Well Began Production
2011-02-02 Well Fluid changed to Crude Oil
2011-02-02 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Crude Oil
2017-07-01 Well Mode changed to Suspended
2019-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-25 Plug Back Performed
2019-11-25 Well Fluid changed to Crude Oil
2019-11-25 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-10 1206.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-05 Multi-Stage Fracture 1768.40 1768.50 0
2010-12-05 Multi-Stage Fracture 2720.10 2720.20 0
2010-12-05 Open Hole/Barefoot Completion 1586.00 2791.00 0
2019-11-25 Packing Device Capped w/Cement 1465.80 1473.80 0
2010-12-05 Multi-Stage Fracture 1868.10 1868.20 0
2010-12-05 Multi-Stage Fracture 1927.50 1927.60 0
2010-12-05 Multi-Stage Fracture 2040.80 2040.90 0
2010-12-05 Multi-Stage Fracture 2154.70 2154.80 0
2010-12-05 Multi-Stage Fracture 2241.40 2241.50 0
2010-12-05 Multi-Stage Fracture 2340.80 2340.90 0
2010-12-05 Multi-Stage Fracture 2445.30 2445.40 0
2010-12-05 Multi-Stage Fracture 2558.00 2558.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4603 0.0 0.0 0.0
2012 7112 0.0 0.0 0.0
2013 3987 0.0 0.0 0.0
2014 7776 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References