If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244171912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.060847,"lon":-112.375175,"icon":""}]} |
Location: 00/12-19-024-17W4/0 | |
Location Alias: 00/12-19-24-17 W4M | |
Location Alias 2: 00/12-19-024-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 17 | |
Section: 19 | |
County/Municipality: County of Newell | |
Well Name: TXNE WINTERH 12-19-24-17 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0328098 | |
License Date: 2005-03-15 | |
License Status: Issued | |
Spud Date: 2005-07-13 | |
Final Drill Date: 2005-07-15 | |
Well Total Depth: 1340.00 m | |
Surface Hole Latitude: 51.060847 | |
Surface Hole Longitude: -112.375175 |
Date | Event |
---|---|
2005-03-15 | Obtained License |
2005-07-14 | Surface Casing Operation Performed |
2005-07-15 | Finished Drilling |
2005-07-15 | Well Log Performed |
2005-07-15 | Well Mode changed to Drilled and Cased |
2005-07-16 | Production Casing Operation Performed |
2005-07-16 | Rig Released |
2005-07-22 | Perforation Treatment Performed - Jet Perforation |
2005-07-22 | Well Log Performed |
2005-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-14 | Plug Back Performed |
2005-10-14 | Well Log Performed |
2005-10-14 | Well Mode changed to Abandoned Zone |
2005-10-16 | Perforation Treatment Performed - Jet Perforation |
2005-10-16 | Well Log Performed |
2005-11-20 | Perforation Treatment Performed - Jet Perforation |
2005-11-20 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2005-11-20 | Plug Back Performed |
2005-11-20 | Well Log Performed |
2006-07-03 | Well Log Performed |
2006-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-04 | Perforation Treatment Performed - Jet Perforation |
2006-07-04 | Plug Back Performed |
2006-07-04 | Well Log Performed |
2006-07-10 | Perforation Treatment Performed - Fractured |
2006-07-18 | Perforation Treatment Performed - Fractured |
2006-08-15 | Well Log Performed |
2007-02-24 | Perforation Treatment Performed - Jet Perforation |
2007-02-24 | Well Log Performed |
2007-03-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-07-22 | Perforation | 1275.00 | 1277.00 | 17 |
2006-07-04 | Perforation | 870.00 | 871.00 | 13 |
2006-07-04 | Perforation | 739.50 | 740.50 | 13 |
2006-07-04 | Perforation | 722.50 | 724.50 | 13 |
2006-07-04 | Perforation | 712.50 | 714.50 | 13 |
2006-07-04 | Perforation | 687.00 | 688.00 | 13 |
2006-07-04 | Perforation | 666.00 | 667.00 | 13 |
2006-07-04 | Perforation | 655.00 | 656.00 | 13 |
2006-07-04 | Perforation | 645.00 | 646.00 | 13 |
2006-07-04 | Perforation | 636.00 | 637.00 | 13 |
2006-07-04 | Perforation | 627.00 | 628.00 | 13 |
2005-10-14 | Packing Device Capped w/Cement | 1257.00 | 1265.00 | 0 |
2006-07-04 | Perforation | 617.00 | 618.00 | 13 |
2006-07-04 | Perforation | 609.00 | 610.00 | 13 |
2006-07-10 | Fracture | 957.00 | 959.00 | 0 |
2006-07-10 | Fracture | 870.00 | 906.50 | 0 |
2006-07-10 | Fracture | 722.50 | 740.50 | 0 |
2006-07-10 | Fracture | 712.50 | 714.50 | 0 |
2006-07-10 | Fracture | 687.00 | 688.00 | 0 |
2006-07-10 | Fracture | 645.00 | 667.00 | 0 |
2006-07-18 | Fracture | 636.00 | 637.00 | 0 |
2006-07-18 | Fracture | 627.00 | 628.00 | 0 |
2005-10-16 | Perforation | 1242.00 | 1246.00 | 17 |
2006-07-18 | Fracture | 617.00 | 618.00 | 0 |
2006-07-18 | Fracture | 609.00 | 610.00 | 0 |
2007-02-24 | Perforation | 540.00 | 544.00 | 13 |
2007-03-02 | Fracture | 540.00 | 544.00 | 0 |
2005-11-20 | Packing Dev Cpd w/Res-Gyp Cem | 1237.00 | 1240.00 | 0 |
2005-11-20 | Perforation | 1227.50 | 1231.00 | 17 |
2006-07-04 | Packing Device Capped w/Cement | 1217.00 | 1225.00 | 0 |
2006-07-04 | Perforation | 957.00 | 959.00 | 13 |
2006-07-04 | Perforation | 905.50 | 906.50 | 13 |
2006-07-04 | Perforation | 883.00 | 884.00 | 13 |
For data sources see[4]