X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234293516000

Well Details

Well ID: 0234293516000
Loading map...
Location: 00/16-35-023-29W4/0
Location Alias: 00/16-35-23-29 W4M
Location Alias 2: 00/16-35-023-29 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 29
Section: 35
County/Municipality: Calgary
Well Name: DEVON CROSS 16-35-23-29
Operator Name: Devon Canada Corporation
License Number: 0021386
License Date: 1961-09-20
License Status: RecCertified
Spud Date: 1961-09-22
Final Drill Date: 1961-10-06
Well Total Depth: 1667.30 m
Surface Hole Latitude: 51.006789
Surface Hole Longitude: -113.938170

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-09-20 Obtained License
1961-10-06 Finished Drilling
1961-10-06 Well Mode changed to Drilled and Cased
1961-10-07 Drill Stem Test Performed
1961-10-08 Perforation Treatment Performed - Open-Hole Completion
1961-10-08 Production Casing Operation Performed
1961-10-19 Perforation Treatment Performed - Jet Perforation
1961-11-03 Well Began Production
1961-11-03 Well Fluid changed to Crude Oil
1961-11-03 Well Mode changed to Flowing
1962-03-18 Well Fluid changed to Crude Oil
1962-03-18 Well Mode changed to Pumping
1994-03-01 Well Fluid changed to Crude Oil
1994-03-01 Well Mode changed to Suspended
1996-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-17 Perforation Treatment Performed - Jet Perforation
1996-05-17 Plug Back Performed
1996-05-17 Well Fluid changed to Crude Oil
1996-05-17 Well Log Performed
1996-05-17 Well Mode changed to Abandoned Zone
1996-05-21 Perforation Treatment Performed - Cement Plug
1996-05-21 Perforation Treatment Performed - Remedial Casing
1996-09-30 Well Abandoned
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-10-08 Open Hole/Barefoot Completion 1660.90 1667.30 0
1961-10-19 Perforation 1647.10 1647.10 10
1961-10-19 Perforation 1647.70 1647.70 10
1961-10-19 Perforation 1648.40 1648.40 10
1996-05-17 Packing Device Capped w/Cement 1626.00 1634.00 0
1996-05-17 Perforation 402.00 403.00 13
1996-05-21 Remedial Casing Cementing 402.00 403.00 0
1996-05-21 Cement Plug 98.00 403.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 2136 0.0 0.0 0.0
1969 7121 0.0 0.0 0.0
1970 8075 0.0 0.0 0.0
1971 8444 0.0 0.0 0.0
1972 7888 0.0 0.0 0.0
1973 7679 0.0 0.0 0.0
1974 8343 0.0 0.0 0.0
1975 8046 0.0 0.0 0.0
1976 8675 0.0 0.0 0.0
1977 8406 0.0 0.0 0.0
1978 6217 0.0 0.0 0.0
1979 7135 0.0 0.0 0.0
1980 8513 0.0 0.0 0.0
1981 8336 0.0 0.0 0.0
1982 8231 0.0 0.0 0.0
1983 7933 0.0 0.0 0.0
1984 6476 0.0 0.0 0.0
1985 5072 0.0 0.0 0.0
1986 7439 0.0 0.0 0.0
1987 4106 0.0 0.0 0.0
1988 3066 0.0 0.0 0.0
1989 2532 0.0 0.0 0.0
1990 3216 0.0 0.0 0.0
1991 3456 0.0 0.0 0.0
1992 2952 0.0 0.0 0.0
1993 3068 0.0 0.0 0.0

For data sources see[5]

References