If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234282112002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.973052,"lon":-113.85302,"icon":""}]} |
Location: 00/12-21-023-28W4/2 | |
Location Alias: 00/12-21-23-28 W4M | |
Location Alias 2: 00/12-21-023-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 28 | |
Section: 21 | |
County/Municipality: Rocky View County | |
Well Name: COMPTON CROSS 12-21-23-28 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0181274 | |
License Date: 1995-10-06 | |
License Status: Issued | |
Spud Date: 1995-10-24 | |
Final Drill Date: 1995-11-08 | |
Well Total Depth: 2268.00 m | |
Surface Hole Latitude: 50.973052 | |
Surface Hole Longitude: -113.853020 |
Date | Event |
---|---|
1995-10-06 | Obtained License |
1995-10-24 | Direction Drilling Operation Performed - Deviate |
1995-10-24 | Surface Casing Operation Performed |
1995-11-08 | Finished Drilling |
1995-11-08 | Well Mode changed to Drilled and Cased |
1995-11-09 | Well Log Performed |
1995-11-10 | Production Casing Operation Performed |
1995-11-11 | Rig Released |
1995-11-18 | Perforation Treatment Performed - Jet Perforation |
1995-11-18 | Well Log Performed |
1995-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-12-06 | Well Log Performed |
1996-01-12 | Well Log Performed |
1996-03-13 | Perforation Treatment Performed - Jet Perforation |
1996-03-13 | Well Log Performed |
1996-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-16 | Well Log Performed |
1999-11-17 | Perforation Treatment Performed - Cement Squeeze |
1999-11-18 | Well Log Performed |
1999-11-19 | Perforation Treatment Performed - Jet Perforation |
1999-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-10-21 | Well Log Performed |
2000-10-26 | Perforation Treatment Performed - Jet Perforation |
2000-10-26 | Well Log Performed |
2000-11-01 | Perforation Treatment Performed - Jet Perforation |
2000-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-11-09 | Well Log Performed |
2000-11-13 | Well Log Performed |
2001-02-15 | Well Log Performed |
2001-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-16 | Perforation Treatment Performed - Jet Perforation |
2001-02-16 | Plug Back Performed |
2001-08-03 | Well Began Production |
2001-08-03 | Well Fluid changed to Gas |
2001-08-03 | Well Mode changed to Flowing |
2002-07-28 | Perforation Treatment Performed - Jet Perforation |
2002-07-28 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-10-24 | 432.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-11-18 | Perforation | 2215.00 | 2217.00 | 13 |
2000-10-26 | Perforation | 2202.50 | 2203.50 | 14 |
2000-11-01 | Perforation | 2204.00 | 2206.00 | 17 |
2000-11-02 | Acid Treatment | 2200.00 | 2206.00 | 0 |
2001-02-16 | Packing Device Capped w/Cement | 2187.00 | 2195.00 | 0 |
2001-02-16 | Perforation | 928.00 | 930.00 | 17 |
2002-07-28 | Perforation | 917.50 | 922.00 | 17 |
1995-11-19 | Acid Treatment | 2215.00 | 2217.00 | 0 |
1996-03-13 | Perforation | 2204.50 | 2206.50 | 13 |
1996-03-14 | Acid Treatment | 2204.50 | 2206.50 | 0 |
1999-11-17 | Cement Squeeze | 2215.00 | 2217.00 | 0 |
1999-11-17 | Cement Squeeze | 2204.50 | 2206.50 | 0 |
1999-11-19 | Perforation | 2212.00 | 2213.50 | 13 |
1999-11-20 | Acid Treatment | 2212.00 | 2213.50 | 0 |
2000-10-26 | Perforation | 2200.00 | 2201.50 | 14 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 1867 | 0.0 | 0.0 | 0.0 |
2002 | 1469 | 0.0 | 0.0 | 0.0 |
2003 | 6619 | 0.0 | 0.0 | 0.0 |
2004 | 7053 | 0.0 | 0.0 | 0.0 |
2005 | 7271 | 0.0 | 0.0 | 0.0 |
2006 | 5257 | 0.0 | 0.0 | 0.0 |
2007 | 4219 | 0.0 | 0.0 | 0.0 |
2008 | 4666 | 0.0 | 0.0 | 0.0 |
2009 | 7350 | 0.0 | 0.0 | 0.0 |
2010 | 8090 | 0.0 | 0.0 | 0.0 |
2011 | 8155 | 0.0 | 0.0 | 0.0 |
2012 | 8744 | 0.0 | 0.0 | 0.0 |
2013 | 7275 | 0.0 | 0.0 | 0.0 |
2014 | 8528 | 0.0 | 0.0 | 0.0 |
2015 | 4638 | 0.0 | 0.0 | 0.0 |
2016 | 1513 | 0.0 | 0.0 | 0.0 |
For data sources see[6]