If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234280207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.926598,"lon":-113.806466,"icon":""}]} |
Location: 00/07-02-023-28W4/0 | |
Location Alias: 00/07-02-23-28 W4M | |
Location Alias 2: 00/07-02-023-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 28 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 7-2-23-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0289563 | |
License Date: 2003-07-10 | |
License Status: Issued | |
Spud Date: 2003-07-27 | |
Final Drill Date: 2003-07-30 | |
Well Total Depth: 1125.00 m | |
Surface Hole Latitude: 50.926598 | |
Surface Hole Longitude: -113.806466 |
Date | Event |
---|---|
2003-07-10 | Obtained License |
2003-07-28 | Surface Casing Operation Performed |
2003-07-30 | Finished Drilling |
2003-07-30 | Well Log Performed |
2003-07-30 | Well Mode changed to Drilled and Cased |
2003-07-31 | Production Casing Operation Performed |
2003-07-31 | Rig Released |
2003-08-12 | Perforation Treatment Performed - Jet Perforation |
2003-08-12 | Well Log Performed |
2003-08-13 | Perforation Treatment Performed - Fractured |
2003-08-17 | Perforation Treatment Performed - Jet Perforation |
2003-08-17 | Well Log Performed |
2003-08-19 | Perforation Treatment Performed - Fractured |
2004-01-01 | Well Began Production |
2004-01-01 | Well Fluid changed to Gas |
2004-01-01 | Well Mode changed to Flowing |
2004-02-26 | Well Fluid changed to Gas |
2004-02-26 | Well Mode changed to Flowing |
2014-05-14 | Well Fluid changed to Gas |
2014-05-14 | Well Mode changed to Pumping |
2019-07-17 | Well Log Performed |
2019-07-18 | Perforation Treatment Performed - Jet Perforation |
2019-07-18 | Well Log Performed |
2019-07-23 | Perforation Treatment Performed - Remedial Casing |
2019-08-02 | Perforation Treatment Performed - Jet Perforation |
2019-08-02 | Well Log Performed |
2019-09-26 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-08-12 | Perforation | 1054.00 | 1056.00 | 13 |
2019-08-02 | Perforation | 449.20 | 450.20 | 13 |
2019-08-02 | Perforation | 456.30 | 457.80 | 13 |
2019-08-02 | Perforation | 471.90 | 472.90 | 13 |
2019-08-02 | Perforation | 493.10 | 495.10 | 13 |
2019-08-02 | Perforation | 519.50 | 521.00 | 13 |
2019-08-02 | Perforation | 587.10 | 588.10 | 13 |
2019-08-02 | Perforation | 597.80 | 598.80 | 13 |
2019-08-02 | Perforation | 600.70 | 601.70 | 13 |
2019-08-02 | Perforation | 608.50 | 610.00 | 13 |
2019-08-02 | Perforation | 642.30 | 643.80 | 13 |
2003-08-12 | Perforation | 1039.00 | 1041.00 | 13 |
2019-08-02 | Perforation | 658.00 | 659.00 | 13 |
2019-08-02 | Perforation | 661.50 | 662.50 | 13 |
2019-08-02 | Perforation | 668.90 | 671.90 | 13 |
2019-08-02 | Perforation | 714.70 | 715.70 | 13 |
2019-08-02 | Perforation | 728.80 | 729.80 | 13 |
2019-08-02 | Perforation | 735.90 | 738.90 | 13 |
2019-08-02 | Perforation | 779.80 | 780.80 | 13 |
2019-09-26 | Fracture | 449.20 | 450.20 | 0 |
2019-09-26 | Fracture | 456.30 | 457.80 | 0 |
2019-09-26 | Fracture | 471.90 | 472.90 | 0 |
2003-08-13 | Fracture | 1039.00 | 1056.00 | 0 |
2019-09-26 | Fracture | 493.10 | 495.10 | 0 |
2019-09-26 | Fracture | 519.50 | 521.00 | 0 |
2019-09-26 | Fracture | 587.10 | 588.10 | 0 |
2019-09-26 | Fracture | 597.80 | 598.80 | 0 |
2019-09-26 | Fracture | 600.70 | 601.70 | 0 |
2019-09-26 | Fracture | 608.50 | 610.00 | 0 |
2019-09-26 | Fracture | 642.30 | 643.80 | 0 |
2019-09-26 | Fracture | 658.00 | 659.00 | 0 |
2019-09-26 | Fracture | 661.50 | 662.50 | 0 |
2019-09-26 | Fracture | 668.90 | 671.90 | 0 |
2003-08-17 | Perforation | 870.50 | 874.50 | 13 |
2019-09-26 | Fracture | 714.70 | 715.70 | 0 |
2019-09-26 | Fracture | 728.80 | 729.80 | 0 |
2019-09-26 | Fracture | 735.90 | 738.90 | 0 |
2019-09-26 | Fracture | 779.80 | 780.80 | 0 |
2003-08-17 | Perforation | 866.00 | 868.00 | 13 |
2003-08-17 | Perforation | 845.00 | 847.00 | 13 |
2003-08-19 | Fracture | 845.00 | 874.50 | 0 |
2019-07-18 | Perforation | 460.00 | 461.00 | 13 |
2019-07-23 | Remedial Casing Cementing | 460.00 | 461.00 | 0 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-09-26 | 2019-09-26 | 0 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 7044 | 0.0 | 0.0 | 0.0 |
2005 | 8742 | 0.0 | 0.0 | 0.0 |
2006 | 8686 | 0.0 | 0.0 | 0.0 |
2007 | 8718 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8286 | 0.0 | 0.0 | 0.0 |
2010 | 7317 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8701 | 0.0 | 0.0 | 0.0 |
2013 | 8517 | 0.0 | 0.0 | 0.0 |
2014 | 8316 | 0.0 | 0.0 | 0.0 |
2015 | 8141 | 0.0 | 0.0 | 0.0 |
2016 | 7947 | 0.0 | 0.0 | 0.0 |
2017 | 8594 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8303 | 0.0 | 0.0 | 0.0 |
2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-09-12 | No Incident Encountered | 0.00 | 0.00 |
2019-09-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]