If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0234271806002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.954216,"lon":-113.765262,"icon":""}]} |
| Location: 00/06-18-023-27W4/2 | |
| Location Alias: 00/06-18-23-27 W4M | |
| Location Alias 2: 00/06-18-023-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 023 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 18 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 6-18-23-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0193926 | |
| License Date: 1996-11-22 | |
| License Status: Issued | |
| Spud Date: 1996-11-27 | |
| Final Drill Date: 1996-12-10 | |
| Well Total Depth: 2071.00 m | |
| Surface Hole Latitude: 50.954216 | |
| Surface Hole Longitude: -113.765262 |
| Date | Event |
|---|---|
| 1996-11-22 | Obtained License |
| 1996-11-27 | Lost Circulation Occurred |
| 1996-11-30 | Surface Casing Operation Performed |
| 1996-12-10 | Finished Drilling |
| 1996-12-10 | Well Mode changed to Drilled and Cased |
| 1996-12-11 | Drill Stem Test Performed |
| 1996-12-11 | Well Log Performed |
| 1996-12-12 | Drill Stem Test Performed |
| 1996-12-13 | Drill Stem Test Performed |
| 1996-12-14 | Drill Stem Test Performed |
| 1996-12-15 | Production Casing Operation Performed |
| 1996-12-15 | Rig Released |
| 1997-01-06 | Well Log Performed |
| 1997-01-07 | Perforation Treatment Performed - Jet Perforation |
| 1997-01-07 | Well Log Performed |
| 1997-01-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1997-06-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-06-21 | Plug Back Performed |
| 1997-06-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1997-06-23 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-05 | Perforation Treatment Performed - Fractured |
| 1997-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-07-12 | Plug Back Performed |
| 1997-07-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1997-07-13 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-17 | Perforation Treatment Performed - Chemical Squeeze |
| 1999-12-10 | Perforation Treatment Performed - Jet Perforation |
| 1999-12-13 | Perforation Treatment Performed - Fractured |
| 2001-09-09 | Perforation Treatment Performed - Jet Perforation |
| 2001-09-10 | Perforation Treatment Performed - Fractured |
| 2003-05-29 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-01-07 | Perforation | 2023.00 | 2025.00 | 14 |
| 1997-07-17 | Chemical Squeeze | 1707.00 | 1710.00 | 0 |
| 1999-12-10 | Perforation | 2021.00 | 2025.00 | 17 |
| 1999-12-10 | Perforation | 2002.00 | 2005.00 | 14 |
| 1999-12-13 | Fracture | 2002.00 | 2025.00 | 0 |
| 2001-09-09 | Perforation | 993.00 | 995.00 | 14 |
| 2001-09-09 | Perforation | 997.00 | 999.00 | 14 |
| 2001-09-10 | Fracture | 993.00 | 999.00 | 0 |
| 2003-05-29 | Perforation | 650.00 | 653.00 | 14 |
| 2003-05-29 | Perforation | 852.00 | 854.00 | 14 |
| 2003-05-29 | Perforation | 861.50 | 864.50 | 14 |
| 1997-01-12 | Acid Wash | 2023.00 | 2025.00 | 0 |
| 1997-06-21 | Packing Device Capped w/Cement | 2011.00 | 2019.00 | 0 |
| 1997-06-23 | Perforation | 2002.00 | 2005.00 | 14 |
| 1997-06-23 | Acid Wash | 2002.00 | 2005.00 | 0 |
| 1997-07-05 | Fracture | 2002.00 | 2005.00 | 0 |
| 1997-07-12 | Packing Device Capped w/Cement | 1982.00 | 1990.00 | 0 |
| 1997-07-13 | Perforation | 1707.00 | 1710.00 | 14 |
| 1997-07-13 | Acid Wash | 1707.00 | 1710.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1996-11-27 | Lost Circulation | 88.00 | 163.00 |
For data sources see[5]