If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234263310020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.007126,"lon":-113.576722,"icon":""}]} |
Location: 02/10-33-023-26W4/0 | |
Location Alias: 02/10-33-23-26 W4M | |
Location Alias 2: 02/10-33-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 33 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 10-33-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420146 | |
License Date: 2010-04-28 | |
License Status: Amended | |
Spud Date: 2010-10-23 | |
Final Drill Date: 2010-10-24 | |
Well Total Depth: 1124.00 m | |
Surface Hole Latitude: 51.007126 | |
Surface Hole Longitude: -113.576722 |
Date | Event |
---|---|
2010-04-28 | Obtained License |
2010-10-23 | Direction Drilling Operation Performed - Deviate |
2010-10-23 | Surface Casing Operation Performed |
2010-10-24 | Finished Drilling |
2010-10-24 | Production Casing Operation Performed |
2010-10-24 | Rig Released |
2010-10-24 | Well Mode changed to Drilled and Cased |
2010-10-29 | Well Log Performed |
2010-11-21 | Perforation Treatment Performed - Jet Perforation |
2010-11-26 | Perforation Treatment Performed - Fractured |
2010-12-01 | Well Fluid changed to Gas |
2010-12-01 | Well Mode changed to Testing |
2010-12-08 | Perforation Treatment Performed - Jet Perforation |
2010-12-19 | Perforation Treatment Performed - Fractured |
2011-01-21 | Well Began Production |
2011-01-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-23 | 130.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-21 | Perforation | 593.50 | 595.50 | 13 |
2010-11-21 | Perforation | 822.50 | 824.50 | 13 |
2010-11-26 | Fracture | 442.50 | 444.50 | 0 |
2010-11-26 | Fracture | 275.50 | 277.50 | 0 |
2010-11-26 | Fracture | 982.00 | 984.00 | 0 |
2010-11-26 | Fracture | 822.50 | 824.50 | 0 |
2010-12-08 | Perforation | 525.10 | 525.60 | 13 |
2010-12-08 | Perforation | 526.60 | 528.60 | 13 |
2010-12-08 | Perforation | 499.60 | 500.60 | 13 |
2010-12-08 | Perforation | 523.30 | 523.80 | 13 |
2010-12-08 | Perforation | 529.10 | 529.60 | 13 |
2010-11-21 | Perforation | 641.50 | 643.50 | 13 |
2010-12-08 | Perforation | 544.30 | 545.30 | 13 |
2010-12-08 | Perforation | 557.70 | 558.20 | 13 |
2010-12-08 | Perforation | 533.30 | 533.80 | 13 |
2010-12-08 | Perforation | 538.50 | 540.00 | 13 |
2010-12-08 | Perforation | 258.50 | 259.00 | 13 |
2010-12-08 | Perforation | 307.50 | 308.00 | 13 |
2010-12-08 | Perforation | 245.50 | 246.00 | 13 |
2010-12-08 | Perforation | 248.90 | 249.40 | 13 |
2010-12-08 | Perforation | 382.20 | 382.70 | 13 |
2010-12-08 | Perforation | 410.50 | 411.50 | 13 |
2010-11-21 | Perforation | 442.50 | 444.50 | 13 |
2010-12-08 | Perforation | 471.00 | 471.50 | 13 |
2010-12-08 | Perforation | 399.30 | 400.30 | 13 |
2010-12-08 | Perforation | 405.00 | 406.00 | 13 |
2010-12-08 | Perforation | 558.90 | 559.40 | 13 |
2010-12-08 | Perforation | 679.30 | 679.80 | 13 |
2010-12-08 | Perforation | 676.50 | 677.00 | 13 |
2010-12-08 | Perforation | 674.00 | 676.00 | 13 |
2010-12-08 | Perforation | 734.80 | 735.30 | 13 |
2010-12-08 | Perforation | 728.80 | 729.80 | 13 |
2010-12-08 | Perforation | 721.80 | 722.30 | 13 |
2010-11-21 | Perforation | 214.00 | 216.00 | 13 |
2010-12-08 | Perforation | 670.30 | 671.30 | 13 |
2010-12-08 | Perforation | 590.80 | 591.30 | 13 |
2010-12-08 | Perforation | 586.40 | 587.40 | 13 |
2010-12-08 | Perforation | 572.30 | 574.30 | 13 |
2010-12-08 | Perforation | 654.80 | 655.80 | 13 |
2010-12-08 | Perforation | 649.40 | 650.90 | 13 |
2010-12-08 | Perforation | 592.20 | 593.20 | 13 |
2010-12-19 | Fracture | 927.50 | 929.00 | 0 |
2010-12-19 | Fracture | 935.00 | 937.00 | 0 |
2010-12-19 | Fracture | 245.50 | 735.30 | 0 |
2010-11-21 | Perforation | 275.50 | 277.50 | 13 |
2010-12-19 | Fracture | 593.50 | 595.50 | 0 |
2010-12-19 | Fracture | 641.50 | 643.50 | 0 |
2010-12-19 | Fracture | 805.50 | 807.50 | 0 |
2010-11-21 | Perforation | 935.00 | 937.00 | 13 |
2010-11-21 | Perforation | 982.00 | 984.00 | 13 |
2010-11-21 | Perforation | 927.50 | 929.50 | 13 |
2010-11-21 | Perforation | 805.50 | 807.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8278 | 0.0 | 0.0 | 0.0 |
2012 | 8742 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8678 | 0.0 | 0.0 | 0.0 |
2016 | 8653 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]