If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234262710020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.99025,"lon":-113.54583,"icon":""}]} |
Location: 02/10-27-023-26W4/0 | |
Location Alias: 02/10-27-23-26 W4M | |
Location Alias 2: 02/10-27-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 10-27-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0353602 | |
License Date: 2006-03-08 | |
License Status: Issued | |
Spud Date: 2006-03-14 | |
Final Drill Date: 2006-03-16 | |
Well Total Depth: 799.00 m | |
Surface Hole Latitude: 50.990250 | |
Surface Hole Longitude: -113.545830 |
Date | Event |
---|---|
2006-03-08 | Obtained License |
2006-03-14 | Surface Casing Operation Performed |
2006-03-16 | Finished Drilling |
2006-03-16 | Well Mode changed to Drilled and Cased |
2006-03-17 | Production Casing Operation Performed |
2006-03-17 | Rig Released |
2006-03-21 | Well Log Performed |
2011-11-06 | Perforation Treatment Performed - Jet Perforation |
2011-11-10 | Perforation Treatment Performed - Fractured |
2011-11-16 | Perforation Treatment Performed - Jet Perforation |
2011-11-17 | Perforation Treatment Performed - Fractured |
2011-11-29 | Well Began Production |
2011-11-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-06 | Perforation | 177.00 | 179.00 | 13 |
2011-11-16 | Perforation | 368.40 | 368.90 | 13 |
2011-11-16 | Perforation | 458.10 | 458.60 | 13 |
2011-11-16 | Perforation | 482.70 | 483.20 | 13 |
2011-11-16 | Perforation | 486.20 | 486.70 | 13 |
2011-11-16 | Perforation | 487.90 | 488.40 | 13 |
2011-11-16 | Perforation | 488.70 | 489.20 | 13 |
2011-11-16 | Perforation | 490.90 | 491.40 | 13 |
2011-11-16 | Perforation | 496.30 | 496.80 | 13 |
2011-11-16 | Perforation | 497.60 | 498.10 | 13 |
2011-11-16 | Perforation | 499.10 | 499.60 | 13 |
2011-11-06 | Perforation | 195.00 | 197.00 | 13 |
2011-11-16 | Perforation | 502.40 | 502.90 | 13 |
2011-11-16 | Perforation | 513.10 | 513.60 | 13 |
2011-11-16 | Perforation | 520.10 | 520.60 | 13 |
2011-11-16 | Perforation | 525.20 | 525.70 | 13 |
2011-11-16 | Perforation | 526.20 | 526.70 | 13 |
2011-11-16 | Perforation | 535.50 | 536.00 | 13 |
2011-11-16 | Perforation | 536.40 | 536.90 | 13 |
2011-11-16 | Perforation | 541.30 | 542.30 | 13 |
2011-11-16 | Perforation | 590.50 | 591.00 | 13 |
2011-11-16 | Perforation | 595.80 | 596.30 | 13 |
2011-11-06 | Perforation | 233.00 | 235.00 | 13 |
2011-11-16 | Perforation | 606.40 | 606.90 | 13 |
2011-11-16 | Perforation | 611.20 | 611.70 | 13 |
2011-11-16 | Perforation | 614.30 | 614.80 | 13 |
2011-11-16 | Perforation | 615.50 | 616.00 | 13 |
2011-11-16 | Perforation | 619.00 | 619.50 | 13 |
2011-11-16 | Perforation | 656.90 | 657.40 | 13 |
2011-11-16 | Perforation | 664.20 | 664.70 | 13 |
2011-11-16 | Perforation | 665.00 | 665.50 | 13 |
2011-11-16 | Perforation | 667.70 | 668.20 | 13 |
2011-11-17 | Fracture | 233.00 | 668.20 | 0 |
2011-11-06 | Perforation | 516.50 | 518.00 | 13 |
2011-11-06 | Perforation | 582.00 | 584.00 | 13 |
2011-11-10 | Fracture | 516.50 | 584.00 | 0 |
2011-11-16 | Perforation | 333.70 | 334.70 | 13 |
2011-11-16 | Perforation | 339.10 | 339.60 | 13 |
2011-11-16 | Perforation | 344.10 | 344.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 792 | 0.0 | 0.0 | 0.0 |
2012 | 8760 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8653 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 4425 | 0.0 | 0.0 | 0.0 |
2019 | 4422 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]