If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234262704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.988141,"lon":-113.549837,"icon":""}]} |
Location: 00/04-27-023-26W4/0 | |
Location Alias: 00/04-27-23-26 W4M | |
Location Alias 2: 00/04-27-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 4-27-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0419776 | |
License Date: 2010-04-12 | |
License Status: Issued | |
Spud Date: 2010-11-12 | |
Final Drill Date: 2010-11-13 | |
Well Total Depth: 1275.00 m | |
Surface Hole Latitude: 50.988141 | |
Surface Hole Longitude: -113.549837 |
Date | Event |
---|---|
2010-04-12 | Obtained License |
2010-11-12 | Direction Drilling Operation Performed - Deviate |
2010-11-12 | Surface Casing Operation Performed |
2010-11-13 | Finished Drilling |
2010-11-13 | Well Mode changed to Drilled and Cased |
2010-11-14 | Production Casing Operation Performed |
2010-11-14 | Rig Released |
2010-11-14 | Well Log Performed |
2010-12-01 | Perforation Treatment Performed - Jet Perforation |
2010-12-06 | Perforation Treatment Performed - Fractured |
2011-01-21 | Well Began Production |
2011-01-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-12 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-01 | Perforation | 641.70 | 642.20 | 13 |
2010-12-01 | Perforation | 460.70 | 461.20 | 13 |
2010-12-01 | Perforation | 448.30 | 448.80 | 13 |
2010-12-01 | Perforation | 449.10 | 449.60 | 13 |
2010-12-01 | Perforation | 623.40 | 623.90 | 13 |
2010-12-01 | Perforation | 629.10 | 630.60 | 13 |
2010-12-01 | Perforation | 474.70 | 475.20 | 13 |
2010-12-01 | Perforation | 481.00 | 481.50 | 13 |
2010-12-01 | Perforation | 688.40 | 688.90 | 13 |
2010-12-01 | Perforation | 339.50 | 341.50 | 13 |
2010-12-01 | Perforation | 252.00 | 254.00 | 13 |
2010-12-01 | Perforation | 642.70 | 643.20 | 13 |
2010-12-01 | Perforation | 849.00 | 850.00 | 13 |
2010-12-01 | Perforation | 490.50 | 492.50 | 13 |
2010-12-01 | Perforation | 1093.00 | 1095.00 | 13 |
2010-12-01 | Perforation | 943.00 | 945.00 | 13 |
2010-12-01 | Perforation | 842.00 | 843.50 | 13 |
2010-12-01 | Perforation | 793.00 | 794.00 | 13 |
2010-12-01 | Perforation | 757.00 | 758.50 | 13 |
2010-12-01 | Perforation | 764.50 | 765.50 | 13 |
2010-12-01 | Perforation | 689.50 | 690.50 | 13 |
2010-12-01 | Perforation | 695.80 | 696.80 | 13 |
2010-12-01 | Perforation | 632.60 | 633.10 | 13 |
2010-12-01 | Perforation | 787.10 | 790.10 | 13 |
2010-12-01 | Perforation | 784.90 | 785.40 | 13 |
2010-12-01 | Perforation | 778.10 | 779.10 | 13 |
2010-12-06 | Fracture | 448.30 | 850.00 | 0 |
2010-12-06 | Fracture | 339.50 | 1095.00 | 0 |
2010-12-01 | Perforation | 639.40 | 640.40 | 13 |
2010-12-01 | Perforation | 669.40 | 669.90 | 13 |
2010-12-01 | Perforation | 676.10 | 678.10 | 13 |
2010-12-01 | Perforation | 646.70 | 647.70 | 13 |
2010-12-01 | Perforation | 662.70 | 663.20 | 13 |
2010-12-01 | Perforation | 456.40 | 456.90 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8302 | 0.0 | 0.0 | 0.0 |
2012 | 8738 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8710 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8653 | 0.0 | 0.0 | 0.0 |
2017 | 8658 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]