X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234262310000

Well Details

Well ID: 0234262310000
Loading map...
Location: 00/10-23-023-26W4/0
Location Alias: 00/10-23-23-26 W4M
Location Alias 2: 00/10-23-023-26 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 26
Section: 23
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 10-23-23-26
Operator Name: Ember Resources Inc.
License Number: 0435511
License Date: 2011-07-27
License Status: Amended
Spud Date: 2011-10-12
Final Drill Date: 2011-10-13
Well Total Depth: 1245.00 m
Surface Hole Latitude: 50.978895
Surface Hole Longitude: -113.515655

For data sources see[1][2]

Well History

Date Event
2011-07-27 Obtained License
2011-10-12 Direction Drilling Operation Performed - Deviate
2011-10-12 Surface Casing Operation Performed
2011-10-13 Finished Drilling
2011-10-13 Well Mode changed to Drilled and Cased
2011-10-14 Production Casing Operation Performed
2011-10-14 Rig Released
2011-10-24 Well Log Performed
2011-11-10 Perforation Treatment Performed - Jet Perforation
2011-11-17 Perforation Treatment Performed - Fractured
2012-01-10 Well Began Production
2012-01-10 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-12 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-10 Perforation 261.00 263.00 13
2011-11-10 Perforation 569.40 569.90 13
2011-11-10 Perforation 573.20 573.70 13
2011-11-10 Perforation 574.10 574.60 13
2011-11-10 Perforation 580.20 582.20 13
2011-11-10 Perforation 584.70 585.70 13
2011-11-10 Perforation 591.40 592.90 13
2011-11-10 Perforation 600.60 601.60 13
2011-11-10 Perforation 615.50 616.50 13
2011-11-10 Perforation 621.70 622.20 13
2011-11-10 Perforation 628.10 630.10 13
2011-11-10 Perforation 407.20 408.20 13
2011-11-10 Perforation 638.80 640.80 13
2011-11-10 Perforation 645.20 645.70 13
2011-11-10 Perforation 646.50 647.50 13
2011-11-10 Perforation 707.00 708.50 13
2011-11-10 Perforation 715.70 716.20 13
2011-11-10 Perforation 727.10 728.10 13
2011-11-10 Perforation 734.00 735.00 13
2011-11-10 Perforation 741.00 742.00 13
2011-11-10 Perforation 742.50 743.50 13
2011-11-10 Perforation 744.10 745.10 13
2011-11-10 Perforation 414.80 415.80 13
2011-11-10 Perforation 789.70 790.20 13
2011-11-10 Perforation 797.40 798.40 13
2011-11-10 Perforation 799.50 800.00 13
2011-11-10 Perforation 800.40 800.90 13
2011-11-10 Perforation 888.00 890.00 13
2011-11-17 Fracture 261.00 890.00 0
2011-11-10 Perforation 418.10 418.60 13
2011-11-10 Perforation 430.10 431.10 13
2011-11-10 Perforation 433.30 433.80 13
2011-11-10 Perforation 437.40 438.40 13
2011-11-10 Perforation 537.40 537.90 13
2011-11-10 Perforation 539.10 539.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4744 0.0 0.0 0.0
2013 8647 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8649 0.0 0.0 0.0
2016 8624 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8531 0.0 0.0 0.0
2019 8186 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

References