If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234262009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.975714,"lon":-113.587334,"icon":""}]} |
Location: 00/09-20-023-26W4/0 | |
Location Alias: 00/09-20-23-26 W4M | |
Location Alias 2: 00/09-20-023-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 26 | |
Section: 20 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 9-20-23-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0271423 | |
License Date: 2002-07-02 | |
License Status: Amended | |
Spud Date: 2002-07-04 | |
Final Drill Date: 2002-07-11 | |
Well Total Depth: 1068.00 m | |
Surface Hole Latitude: 50.975714 | |
Surface Hole Longitude: -113.587334 |
Date | Event |
---|---|
2002-07-02 | Obtained License |
2002-07-04 | Surface Casing Operation Performed |
2002-07-11 | Finished Drilling |
2002-07-12 | Production Casing Operation Performed |
2002-07-12 | Rig Released |
2002-07-12 | Well Mode changed to Drilled and Cased |
2002-07-29 | Well Log Performed |
2002-08-29 | Perforation Treatment Performed - Jet Perforation |
2002-09-26 | Perforation Treatment Performed - Jet Perforation |
2002-10-20 | Perforation Treatment Performed - Jet Perforation |
2002-11-20 | Perforation Treatment Performed - Fractured |
2003-01-11 | Perforation Treatment Performed - Jet Perforation |
2003-02-03 | Perforation Treatment Performed - Jet Perforation |
2003-06-05 | Perforation Treatment Performed - Fractured |
2003-09-10 | Well Began Production |
2003-09-10 | Well Fluid changed to Gas |
2003-09-10 | Well Mode changed to Flowing |
2003-09-11 | Well Fluid changed to Gas |
2003-09-11 | Well Mode changed to Flowing |
2006-07-27 | Perforation Treatment Performed - Jet Perforation |
2006-07-27 | Well Fluid changed to Gas |
2006-07-27 | Well Mode changed to Suspended |
2006-08-15 | Perforation Treatment Performed - Fractured |
2017-05-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-08-29 | Perforation | 975.00 | 977.00 | 13 |
2006-07-27 | Perforation | 631.10 | 631.60 | 13 |
2006-07-27 | Perforation | 620.90 | 621.40 | 13 |
2006-07-27 | Perforation | 617.10 | 617.60 | 13 |
2006-07-27 | Perforation | 607.70 | 608.70 | 13 |
2006-07-27 | Perforation | 600.30 | 600.80 | 13 |
2006-07-27 | Perforation | 554.00 | 554.50 | 13 |
2006-07-27 | Perforation | 548.00 | 548.50 | 13 |
2006-07-27 | Perforation | 541.60 | 542.10 | 13 |
2006-07-27 | Perforation | 532.90 | 533.90 | 13 |
2006-07-27 | Perforation | 527.00 | 527.50 | 13 |
2002-08-29 | Perforation | 991.00 | 995.00 | 13 |
2006-07-27 | Perforation | 522.70 | 523.20 | 13 |
2006-07-27 | Perforation | 512.60 | 513.10 | 13 |
2006-07-27 | Perforation | 507.90 | 508.40 | 13 |
2006-07-27 | Perforation | 506.70 | 507.20 | 13 |
2006-07-27 | Perforation | 500.50 | 501.00 | 13 |
2006-07-27 | Perforation | 492.00 | 492.50 | 13 |
2006-07-27 | Perforation | 488.60 | 489.10 | 13 |
2006-07-27 | Perforation | 487.70 | 488.20 | 13 |
2006-07-27 | Perforation | 485.70 | 486.20 | 13 |
2006-07-27 | Perforation | 441.10 | 441.60 | 13 |
2002-09-26 | Perforation | 908.00 | 911.00 | 7 |
2006-07-27 | Perforation | 382.80 | 383.30 | 13 |
2006-07-27 | Perforation | 381.80 | 382.30 | 13 |
2006-07-27 | Perforation | 371.10 | 372.10 | 13 |
2006-07-27 | Perforation | 327.10 | 328.70 | 13 |
2006-07-27 | Perforation | 324.30 | 324.80 | 13 |
2006-07-27 | Perforation | 323.00 | 323.50 | 13 |
2006-07-27 | Perforation | 240.90 | 241.40 | 13 |
2006-07-27 | Perforation | 222.80 | 223.30 | 13 |
2006-08-15 | Fracture | 222.80 | 667.20 | 0 |
2002-10-20 | Perforation | 875.00 | 877.00 | 7 |
2002-11-20 | Fracture | 875.00 | 877.00 | 0 |
2003-01-11 | Perforation | 846.00 | 850.00 | 13 |
2003-02-03 | Perforation | 471.00 | 475.00 | 13 |
2003-06-05 | Fracture | 471.00 | 475.00 | 0 |
2006-07-27 | Perforation | 666.70 | 667.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1324 | 0.0 | 0.0 | 0.0 |
2004 | 3526 | 0.0 | 0.0 | 0.0 |
2005 | 8472 | 0.0 | 0.0 | 0.0 |
2006 | 4301 | 0.0 | 0.0 | 0.0 |
For data sources see[5]