X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234261909000

Well Details

Well ID: 0234261909000
Loading map...
Location: 00/09-19-023-26W4/0
Location Alias: 00/09-19-23-26 W4M
Location Alias 2: 00/09-19-023-26 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 26
Section: 19
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-19-23-26
Operator Name: Ember Resources Inc.
License Number: 0353034
License Date: 2006-02-28
License Status: Issued
Spud Date: 2006-03-05
Final Drill Date: 2006-03-07
Well Total Depth: 1086.00 m
Surface Hole Latitude: 50.974237
Surface Hole Longitude: -113.614785

For data sources see[1][2]

Well History

Date Event
2006-02-28 Obtained License
2006-03-05 Surface Casing Operation Performed
2006-03-07 Finished Drilling
2006-03-07 Well Mode changed to Drilled and Cased
2006-03-08 Production Casing Operation Performed
2006-03-08 Rig Released
2006-03-13 Well Log Performed
2006-10-30 Perforation Treatment Performed - Jet Perforation
2006-11-07 Well Fluid changed to Gas
2006-11-07 Well Mode changed to Testing
2006-11-23 Perforation Treatment Performed - Fractured
2006-12-05 Well Began Production
2006-12-05 Well Fluid changed to Gas
2006-12-05 Well Mode changed to Flowing
2010-01-07 Perforation Treatment Performed - Jet Perforation
2010-01-22 Perforation Treatment Performed - Fractured
2010-01-26 Well Structure changed to Commingled
2010-11-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-30 Perforation 888.00 889.00 13
2010-01-07 Perforation 526.90 527.40 13
2010-01-07 Perforation 444.90 445.40 13
2010-01-07 Perforation 370.20 371.20 13
2010-01-07 Perforation 375.30 375.80 13
2010-01-07 Perforation 329.70 330.20 13
2010-01-07 Perforation 361.60 362.10 13
2010-01-07 Perforation 432.20 432.70 13
2010-01-07 Perforation 443.80 444.30 13
2010-01-07 Perforation 390.50 391.00 13
2010-01-07 Perforation 406.00 406.50 13
2006-11-23 Fracture 888.00 889.00 0
2010-01-07 Perforation 692.40 692.90 13
2010-01-07 Perforation 691.40 691.90 13
2010-01-07 Perforation 652.70 653.70 13
2010-01-07 Perforation 473.00 474.00 13
2010-01-07 Perforation 1012.00 1013.00 13
2010-01-07 Perforation 821.00 822.00 13
2010-01-07 Perforation 510.00 511.00 13
2010-01-07 Perforation 553.80 555.80 13
2010-01-07 Perforation 569.40 569.90 13
2010-01-07 Perforation 623.80 624.80 13
2010-01-07 Perforation 512.10 514.10 13
2010-01-07 Perforation 575.70 576.20 13
2010-01-07 Perforation 647.00 650.00 13
2010-01-07 Perforation 640.50 641.50 13
2010-01-07 Perforation 630.10 630.60 13
2010-01-22 Fracture 329.70 692.90 0
2010-01-22 Fracture 473.00 511.00 0
2010-01-22 Fracture 821.00 822.00 0
2010-01-22 Fracture 1012.00 1013.00 0
2010-01-07 Perforation 519.70 520.20 13
2010-01-07 Perforation 446.30 446.80 13
2010-01-07 Perforation 507.60 508.10 13
2010-01-07 Perforation 533.90 534.40 13
2010-01-07 Perforation 541.60 542.10 13
2010-01-07 Perforation 525.60 526.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 735 0.0 0.0 0.0
2007 8698 0.0 0.0 0.0
2008 8649 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 648 0.0 0.0 0.0

For data sources see[5]

References