X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234261501000

Well Details

Well ID: 0234261501000
Loading map...
Location: 00/01-15-023-26W4/0
Location Alias: 00/01-15-23-26 W4M
Location Alias 2: 00/01-15-023-26 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 26
Section: 15
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 1-15-23-26
Operator Name: Ember Resources Inc.
License Number: 0423624
License Date: 2010-09-21
License Status: Issued
Spud Date: 2011-01-01
Final Drill Date: 2011-01-02
Well Total Depth: 1370.00 m
Surface Hole Latitude: 50.957050
Surface Hole Longitude: -113.552431

For data sources see[1][2]

Well History

Date Event
2010-09-21 Obtained License
2011-01-01 Direction Drilling Operation Performed - Deviate
2011-01-01 Surface Casing Operation Performed
2011-01-02 Finished Drilling
2011-01-02 Well Mode changed to Drilled and Cased
2011-01-03 Production Casing Operation Performed
2011-01-03 Rig Released
2011-01-06 Well Log Performed
2011-01-29 Perforation Treatment Performed - Jet Perforation
2011-02-08 Perforation Treatment Performed - Fractured
2011-02-15 Well Began Production
2011-02-15 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-01 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-29 Perforation 696.90 697.90 13
2011-01-29 Perforation 311.20 311.70 13
2011-01-29 Perforation 480.10 482.10 13
2011-01-29 Perforation 276.00 278.00 13
2011-01-29 Perforation 300.00 302.00 13
2011-01-29 Perforation 626.80 627.30 13
2011-01-29 Perforation 671.00 673.00 13
2011-01-29 Perforation 486.70 487.20 13
2011-01-29 Perforation 500.30 500.80 13
2011-01-29 Perforation 747.90 749.90 13
2011-01-29 Perforation 638.50 640.50 13
2011-01-29 Perforation 709.80 710.30 13
2011-01-29 Perforation 655.50 657.50 13
2011-01-29 Perforation 942.30 942.80 13
2011-01-29 Perforation 342.50 344.50 13
2011-01-29 Perforation 1171.00 1172.50 13
2011-01-29 Perforation 1183.50 1185.00 13
2011-01-29 Perforation 663.40 664.40 13
2011-01-29 Perforation 1023.50 1025.50 13
2011-01-29 Perforation 833.00 834.00 13
2011-01-29 Perforation 839.90 840.40 13
2011-01-29 Perforation 811.10 812.60 13
2011-01-29 Perforation 691.90 692.90 13
2011-01-29 Perforation 821.40 821.90 13
2011-01-29 Perforation 850.30 853.30 13
2011-01-29 Perforation 915.40 915.90 13
2011-01-29 Perforation 909.60 910.10 13
2011-01-29 Perforation 854.50 855.50 13
2011-02-08 Fracture 276.00 942.80 0
2011-02-08 Fracture 663.40 1185.00 0
2011-01-29 Perforation 693.20 694.70 13
2011-01-29 Perforation 727.10 729.10 13
2011-01-29 Perforation 740.70 742.70 13
2011-01-29 Perforation 713.10 713.60 13
2011-01-29 Perforation 715.70 716.20 13
2011-01-29 Perforation 685.00 686.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7678 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 8722 0.0 0.0 0.0
2015 8745 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8693 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

References