If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234253605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.000357,"lon":-113.374648,"icon":""}]} |
Location: 00/05-36-023-25W4/0 | |
Location Alias: 00/05-36-23-25 W4M | |
Location Alias 2: 00/05-36-023-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-36-23-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0342083 | |
License Date: 2005-11-07 | |
License Status: Issued | |
Spud Date: 2005-12-21 | |
Final Drill Date: 2005-12-21 | |
Well Total Depth: 920.00 m | |
Surface Hole Latitude: 51.000357 | |
Surface Hole Longitude: -113.374648 |
Date | Event |
---|---|
2005-11-07 | Obtained License |
2005-12-21 | Finished Drilling |
2005-12-21 | Surface Casing Operation Performed |
2005-12-21 | Well Mode changed to Drilled and Cased |
2005-12-22 | Production Casing Operation Performed |
2005-12-22 | Rig Released |
2005-12-29 | Well Log Performed |
2006-01-18 | Perforation Treatment Performed - Jet Perforation |
2006-01-26 | Well Fluid changed to Gas |
2006-01-26 | Well Mode changed to Testing |
2006-02-18 | Perforation Treatment Performed - Fractured |
2008-02-15 | Well Began Production |
2008-02-15 | Well Fluid changed to Gas |
2008-02-15 | Well Mode changed to Flowing |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
2010-01-27 | Perforation Treatment Performed - Fractured |
2010-02-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-18 | Perforation | 850.00 | 852.00 | 13 |
2010-01-06 | Perforation | 364.00 | 364.50 | 13 |
2010-01-06 | Perforation | 256.30 | 256.80 | 13 |
2010-01-06 | Perforation | 251.20 | 251.70 | 13 |
2010-01-06 | Perforation | 240.60 | 241.10 | 13 |
2010-01-06 | Perforation | 360.20 | 360.70 | 13 |
2010-01-06 | Perforation | 354.80 | 355.30 | 13 |
2010-01-06 | Perforation | 310.00 | 310.50 | 13 |
2010-01-06 | Perforation | 500.60 | 501.10 | 13 |
2010-01-06 | Perforation | 496.50 | 497.50 | 13 |
2010-01-06 | Perforation | 261.00 | 262.00 | 13 |
2006-01-18 | Perforation | 846.00 | 848.00 | 13 |
2010-01-06 | Perforation | 706.00 | 707.00 | 13 |
2010-01-06 | Perforation | 314.50 | 315.50 | 13 |
2010-01-06 | Perforation | 408.10 | 408.60 | 13 |
2010-01-06 | Perforation | 417.90 | 419.90 | 13 |
2010-01-06 | Perforation | 465.70 | 466.70 | 13 |
2010-01-06 | Perforation | 483.80 | 484.30 | 13 |
2010-01-06 | Perforation | 479.30 | 479.80 | 13 |
2010-01-27 | Fracture | 240.60 | 501.10 | 0 |
2010-01-27 | Fracture | 261.00 | 262.00 | 0 |
2010-01-27 | Fracture | 314.50 | 315.50 | 0 |
2006-02-18 | Fracture | 846.00 | 852.00 | 0 |
2010-01-27 | Fracture | 706.00 | 707.00 | 0 |
2010-01-06 | Perforation | 385.20 | 385.70 | 13 |
2010-01-06 | Perforation | 379.90 | 380.90 | 13 |
2010-01-06 | Perforation | 373.50 | 374.50 | 13 |
2010-01-06 | Perforation | 406.10 | 406.60 | 13 |
2010-01-06 | Perforation | 399.90 | 400.40 | 13 |
2010-01-06 | Perforation | 393.50 | 394.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 144 | 0.0 | 0.0 | 0.0 |
2008 | 6280 | 0.0 | 0.0 | 0.0 |
2009 | 8739 | 0.0 | 0.0 | 0.0 |
2010 | 7977 | 0.0 | 0.0 | 0.0 |
2011 | 8224 | 0.0 | 0.0 | 0.0 |
2012 | 8608 | 0.0 | 0.0 | 0.0 |
2013 | 8294 | 0.0 | 0.0 | 0.0 |
2014 | 8732 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8519 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]