X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234252612002

Well Details

Well ID: 0234252612002
Loading map...
Location: 00/12-26-023-25W4/2
Location Alias: 00/12-26-23-25 W4M
Location Alias 2: 00/12-26-023-25 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 26
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 12-26-23-25
Operator Name: Ember Resources Inc.
License Number: 0350206
License Date: 2006-01-26
License Status: Issued
Spud Date: 2006-02-14
Final Drill Date: 2006-02-16
Well Total Depth: 688.00 m
Surface Hole Latitude: 50.987375
Surface Hole Longitude: -113.395695

For data sources see[1][2]

Well History

Date Event
2006-01-26 Obtained License
2006-02-14 Surface Casing Operation Performed
2006-02-16 Finished Drilling
2006-02-16 Well Mode changed to Drilled and Cased
2006-02-17 Production Casing Operation Performed
2006-02-17 Rig Released
2006-02-22 Well Log Performed
2006-03-23 Perforation Treatment Performed - Jet Perforation
2007-08-03 Perforation Treatment Performed - Fractured
2010-11-29 Perforation Treatment Performed - Jet Perforation
2010-12-08 Perforation Treatment Performed - Fractured
2010-12-12 Well Fluid changed to Coalbed Methane-Coals and Other
2010-12-12 Well Mode changed to Testing
2011-01-03 Perforation Treatment Performed - Fractured
2011-01-25 Well Began Production
2011-01-25 Well Fluid changed to Coalbed Methane-Coals and Other
2011-01-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-23 Perforation 577.40 577.90 13
2006-03-23 Perforation 438.00 438.50 13
2006-03-23 Perforation 429.60 430.10 13
2006-03-23 Perforation 428.30 428.80 13
2006-03-23 Perforation 426.90 427.40 13
2006-03-23 Perforation 422.40 422.90 13
2006-03-23 Perforation 419.90 420.40 13
2006-03-23 Perforation 405.40 405.90 13
2006-03-23 Perforation 404.50 405.00 13
2006-03-23 Perforation 401.60 402.10 13
2006-03-23 Perforation 397.60 398.10 13
2006-03-23 Perforation 569.90 570.40 13
2006-03-23 Perforation 391.20 391.70 13
2006-03-23 Perforation 381.30 381.80 13
2006-03-23 Perforation 377.80 378.30 13
2006-03-23 Perforation 284.90 285.40 13
2006-03-23 Perforation 266.80 267.30 13
2006-03-23 Perforation 252.60 253.10 13
2006-03-23 Perforation 249.20 249.70 13
2006-03-23 Perforation 248.20 248.70 13
2007-08-03 Fracture 248.20 577.90 0
2010-11-29 Perforation 635.00 637.00 13
2006-03-23 Perforation 529.10 529.60 13
2010-11-29 Perforation 475.00 477.00 13
2010-11-29 Perforation 444.00 446.00 13
2010-11-29 Perforation 412.00 414.00 13
2010-11-29 Perforation 263.00 265.00 13
2010-11-29 Perforation 193.00 195.00 13
2010-12-08 Fracture 475.00 477.00 0
2011-01-03 Fracture 248.20 577.90 0
2011-01-03 Fracture 263.00 637.00 0
2006-03-23 Perforation 525.70 526.70 13
2006-03-23 Perforation 512.40 512.90 13
2006-03-23 Perforation 507.40 507.90 13
2006-03-23 Perforation 491.00 491.50 13
2006-03-23 Perforation 440.70 441.20 13
2006-03-23 Perforation 439.00 439.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 8142 0.0 0.0 0.0
2012 8692 0.0 0.0 0.0
2013 8593 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 8602 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References