X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234252205002

Well Details

Well ID: 0234252205002
Loading map...
Location: 00/05-22-023-25W4/2
Location Alias: 00/05-22-23-25 W4M
Location Alias 2: 00/05-22-023-25 W4/02
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 25
Section: 22
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 5-22-23-25
Operator Name: Ember Resources Inc.
License Number: 0337205
License Date: 2005-08-29
License Status: Issued
Spud Date: 2005-09-23
Final Drill Date: 2005-10-05
Well Total Depth: 710.00 m
Surface Hole Latitude: 50.970778
Surface Hole Longitude: -113.420851

For data sources see[1][2]

Well History

Date Event
2005-08-29 Obtained License
2005-09-23 Surface Casing Operation Performed
2005-10-05 Finished Drilling
2005-10-05 Well Mode changed to Drilled and Cased
2005-10-06 Production Casing Operation Performed
2005-10-06 Rig Released
2005-10-10 Well Log Performed
2005-10-28 Perforation Treatment Performed - Jet Perforation
2005-11-16 Perforation Treatment Performed - Fractured
2011-01-06 Perforation Treatment Performed - Jet Perforation
2011-02-04 Perforation Treatment Performed - Fractured
2011-02-09 Well Began Production
2011-02-09 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-28 Perforation 608.10 608.60 13
2005-10-28 Perforation 463.40 463.90 13
2005-10-28 Perforation 457.80 458.30 13
2005-10-28 Perforation 457.00 457.50 13
2005-10-28 Perforation 448.00 448.50 13
2005-10-28 Perforation 447.30 447.80 13
2005-10-28 Perforation 446.00 446.50 13
2005-10-28 Perforation 440.90 441.40 13
2005-10-28 Perforation 438.90 439.40 13
2005-10-28 Perforation 433.80 434.30 13
2005-10-28 Perforation 428.30 430.80 13
2005-10-28 Perforation 587.90 588.40 13
2005-10-28 Perforation 430.30 430.80 13
2005-10-28 Perforation 427.20 427.70 13
2005-10-28 Perforation 422.70 423.20 13
2005-10-28 Perforation 412.20 412.70 13
2005-10-28 Perforation 408.70 409.20 13
2005-10-28 Perforation 389.20 389.70 13
2005-10-28 Perforation 311.20 311.70 13
2005-10-28 Perforation 302.60 303.10 13
2005-10-28 Perforation 295.00 295.50 13
2005-10-28 Perforation 286.80 287.30 13
2005-10-28 Perforation 586.40 586.90 13
2005-10-28 Perforation 285.40 285.90 13
2005-10-28 Perforation 225.00 225.50 13
2005-11-16 Fracture 225.00 608.60 0
2011-01-06 Perforation 676.00 678.00 13
2011-01-06 Perforation 651.50 653.00 13
2011-01-06 Perforation 593.00 594.50 13
2011-01-06 Perforation 469.50 471.50 13
2011-02-04 Fracture 469.50 678.00 0
2005-10-28 Perforation 545.90 546.40 13
2005-10-28 Perforation 542.30 542.80 13
2005-10-28 Perforation 538.20 538.70 13
2005-10-28 Perforation 532.90 533.40 13
2005-10-28 Perforation 516.10 516.60 13
2005-10-28 Perforation 464.60 465.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7793 0.0 0.0 0.0
2012 8609 0.0 0.0 0.0
2013 8594 0.0 0.0 0.0
2014 8668 0.0 0.0 0.0
2015 8684 0.0 0.0 0.0
2016 5802 0.0 0.0 0.0
2017 8699 0.0 0.0 0.0
2018 7065 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[5]

References